This page has been archived.

This page has been archived.

This page has been archived.

This database contains records of each project of the Commander's Emergency Response Program recorded in the Iraq Reconstruction Management System, obtained through Army Corps of Engineers in response to a Freedom of Information Act request. The records are presented in their raw form, with no changes made by The Washington Post. Read additional information about the database here.


Enter a Search Term,
View by Sector,
Choose a Category,
Or Browse by Quarter and Year:

Search has been taken offline. Download data (6.2MB)


Results:

Now showing 50 of 26,204 results, totaling $3.0 billion

Start Date Cost Title Fund Source City Province Subsector
June 10, 2008 $30,000 WEST DUSTER'S ROAD WIDENING U.S. RAMADI CITY AL ANBAR Transportation
June 8, 2008 $477,258 OUTER HAWIJAH CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL #3 (PARENT URI:55681) U.S. TAL MINJAL AL TAMIM Protective Measures
June 8, 2008 $240,158 ROUTE MINNEAPOLIS, ROUTE DINI CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL (PARENT URI: 49510) U.S. HABITAR AL TAMIM Protective Measures
June 8, 2008 $114,600 SOI OF HAMRINS CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. QUSHALAN SALAH AD DIN Protective Measures
June 8, 2008 $175,850 SOI OF RASHAAD CENTRAL CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. JAWWALAH AL TAMIM Protective Measures
June 6, 2008 $72,500 ASR BARRACUDA CULVERT DENIAL PROJECT U.S. MALAWA NINAWA Protective Measures
June 6, 2008 $52,500 BU BAZ CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SHAIKH RIYA SALAH AD DIN Protective Measures
June 6, 2008 $298,626 INNER HAWIJAH CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL #3 (PARENT URI:55686) U.S. HAWEEJA AL TAMIM Protective Measures
June 6, 2008 $1 MULTAKA CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL U.S. SAIDIYA [2] AL TAMIM Protective Measures
June 6, 2008 $1 NORTHEAST ZAAB CRITICAL INFRASTUCTURE SECURITY SERVICE RENEWAL U.S. SHUMAITA AL TAMIM Protective Measures
June 6, 2008 $15,000 REPAR WATER PIPE AT PUMP HOUSE FLANDERS U.S. AL `AMIRIYAH BAGHDAD Water & Sanitation
June 6, 2008 $1 SIDAR CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL U.S. SHEKH AL TAMIM Protective Measures
June 6, 2008 $49,875 UDAIM CITY HALL CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. CHAI KHANA DIYALA Protective Measures
June 6, 2008 $1 UDAIM WATER PUMP CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. CHAYKHANA DIYALA Protective Measures
June 6, 2008 $49,875 UDAIM WATER PUMP CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. CHAYKHANA DIYALA Protective Measures
June 6, 2008 $1 WEST ZAAB CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL U.S. SHAT JIDR AL TAMIM Protective Measures
June 3, 2008 $49,200 1-32, 101 ABN BCT, AL BAYDAA CENTER U.S. SHAIKH RIYA SALAH AD DIN Econ. & Related Initiatives
June 3, 2008 $16,695 AL AITH INFRASTRUCTURE SECURITY SERVICE RENEWAL U.S. MUKAYSHIFAH SALAH AD DIN Protective Measures
June 3, 2008 $48,615 AL MUTINABE HIGHT CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SHAKIR DIYALA Protective Measures
June 3, 2008 $36,400 ARAB HAMADA CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL (PARENT URI: 76914) U.S. LA`UL HASAN DIYALA Protective Measures
June 3, 2008 $28,000 AS SARYIAH SOI CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SHAJARA AL TAMIM Protective Measures
June 3, 2008 $26,900 FARIS CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. LA`UL HASAN DIYALA Protective Measures
June 3, 2008 $14,000 MUSLAKAH SOI CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. MUSLAKHA AL TAMIM Protective Measures
June 3, 2008 $1,141,500 NEIGHBORHOOD #1 FORCE PROTECTION INITIATIVE U.S. KASSIYA AL ANBAR Protective Measures
June 3, 2008 $940,000 NEIGHBORHOOD #2 FORCE PROTECTION INITIATIVE U.S. SAMARRA SALAH AD DIN Protective Measures
June 3, 2008 $1,598,500 NEIGHBORHOOD #4 FORCE PROTECTION INITIATIVE U.S. SAMARRA SALAH AD DIN Protective Measures
June 3, 2008 $48,000 SAMARRA RD M-4 CHECKPOINT GRAVEL CONTRACTOR 1 & 2 U.S. SAMARRA SALAH AD DIN Transportation
June 3, 2008 $101,300 SHOHANI CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SALIM [1] DIYALA Protective Measures
June 3, 2008 $105,000 SINIYAH SOI CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. LAQLAQ SALAH AD DIN Protective Measures
June 2, 2008 $1 1-87 IN, 1-10 MTN COMMUNITY RECONSTRUCTION U.S. TISEEN AL TAMIM Civic Infrastructure Repair
June 2, 2008 $22,000 AD DAWR SOLID WASTE DISPOSAL PROJECT U.S. SAMARRA CITY SALAH AD DIN Civil Clean-Up
June 2, 2008 $52,500 ADIL #1 CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SAMARRA SALAH AD DIN Protective Measures
June 2, 2008 $52,500 AHED AL REFI CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SAMARRA SALAH AD DIN Protective Measures
June 2, 2008 $41,000 ALEU HISHMA ROUTE DOVER T39 CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL #2 (PARENT URI: 48918) U.S. ALBU SHUKR DIYALA Protective Measures
June 2, 2008 $41,000 AL JUMIA RTE HEATHER T50 CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL #2 (PARENT URI: 48916) U.S. LATIF YASIN ABBAS SALAH AD DIN Protective Measures
June 2, 2008 $346,500 AL SEQUOR CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL #2 PARENT URI 50156 U.S. AHMAD MAJID DIYALA Protective Measures
June 2, 2008 $52,500 BAZI CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SAMARRA SALAH AD DIN Protective Measures
June 2, 2008 $63,000 CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SAMARRA SALAH AD DIN Protective Measures
June 2, 2008 $52,500 DOBUT II CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SAMARRA SALAH AD DIN Protective Measures
June 2, 2008 $48,750 DUKAYLA CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL (PARENT URI: 77244) U.S. JAWAD AL KAZIM DIYALA Protective Measures
June 2, 2008 $32,850 DURAH WTF CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. AHMAD MAJID DIYALA Protective Measures
June 2, 2008 $84,600 MUTHANA CHEMICAL CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. HAWIJA DIYALA Protective Measures
June 2, 2008 $52,500 ORBI TRIBE ROUTE CRITICAL INFRASTRUCTURE SECURITY SERVICE #1 (PARENT URI: 54459) U.S. IZL UPPER SALAH AD DIN Protective Measures
June 2, 2008 $49,575 ROUTE PYTHON (AD DUJAYL) CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL PARENT URI: 56336) U.S. ALBO FAHAD AL ANBAR Protective Measures
June 2, 2008 $100,000 SAEF CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. EHL GHADHAB SALAH AD DIN Protective Measures
June 2, 2008 $92,843 SALSH AD DIN SMALL BUSINESS DEVELOPMENT CENTER (SBDC) U.S. SAQIYAH SALAH AD DIN Econ. & Related Initiatives
June 2, 2008 $52,500 SHARTA CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SAMARRA SALAH AD DIN Protective Measures
June 2, 2008 $52,500 SHOHDA CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. SAMARRA SALAH AD DIN Protective Measures
June 2, 2008 $51,000 SOUTH RTE BAKER (BAKIR VILLAGE) CRITICAL INFRASTRUCTURE SECURITY SERVICE U.S. AT TARMIYAH DIYALA Protective Measures
June 2, 2008 $49,575 TIGIRS RIVERFRONT CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL #3 (PARENT URI:49508) U.S. SHAYKH `ABBAS SALAH AD DIN Protective Measures
... « 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 » ...
© The Washington Post Company