This database contains records of each project of the Commander's Emergency Response Program recorded in the Iraq Reconstruction Management System, obtained through Army Corps of Engineers in response to a Freedom of Information Act request. The records are presented in their raw form, with no changes made by The Washington Post. Read additional information about the database here.
Results:
Now showing 50 of 26,204 results, totaling $3.0 billion
| Start Date | Cost | Title | Fund Source | City | Province | Subsector |
|---|---|---|---|---|---|---|
| $70,000 | AMBULANCES FOR MDICAL CLINIC IN THE DORA MARKET AREA | U.S. | AJRAB | DIYALA | Civic Support Vehicles | |
| $270,632 | AMERI 4 SOI | U.S. | QAL`AT HAMIDI | BAGHDAD | Protective Measures | |
| $384,000 | AMERIYA PWSS SEWER EQUIPMENT PURCHASE | U.S. | MANSOUR | BAGHDAD | Water & Sanitation | |
| $477,500 | ANAH GOVERNMENT CENTER | U.S. | `ANAH | AL ANBAR | Battle Damage | |
| $25,750 | ANAH POWER AUGMENT | U.S. | AL MURDI | KARBALA | Electricity | |
| $75,000 | ANDALOOS 250KV GENERATOR | U.S. | AL FALLUJAH | AL ANBAR | Education | |
| $54,286 | ANDALOOS SOI | U.S. | AL FALLUJAH | AL ANBAR | Protective Measures | |
| $20,000 | ANDALOOS UNDERGROUND TELEPHONE LINES | U.S. | AL FALLUJAH | AL ANBAR | Telecommunications | |
| $250,020 | ANDALUS SECURITY GAURDS | U.S. | MANSOUR | BAGHDAD | Protective Measures | |
| $237,501 | ANDALUS SONS OF IRAQ RENEWAL # 2 | U.S. | MANSOUR | BAGHDAD | Protective Measures | |
| $0 | ANI HASSAN CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL | U.S. | MUHAMMAD QADIM | SALAH AD DIN | Protective Measures | |
| $26,700 | APPLE-ELECTRONIC CURB AND ROAD REPAIR | U.S. | `AJAL AS SALIM | AL ANBAR | Transportation | |
| $34,180 | AR RAHALIYAH DAY LABOR DISTRICT SANITATION PROGRAM | U.S. | AR RAHHALIYA | AL ANBAR | Civil Clean-Up | |
| $85,740 | ARAFIA SOI | U.S. | MIZBAN | DIYALA | Protective Measures | |
| $119,988 | ARAK ABBAS SOI | U.S. | SHAYKH HATIM | BAGHDAD | Protective Measures | |
| $480 | ARMORED VEHICLE FUEL | U.S. | ZUWAYYAH | AL ANBAR | Transportation | |
| $200,000 | AS ADEZ AL AMIN SCHOOL RECONSTRUCTION | U.S. | AD DULAIMIYA | AL ANBAR | Education | |
| $40,000 | ASPHALT PLANT GENERATOR | U.S. | AR RUTBAH | AL ANBAR | Transportation | |
| $24,570 | AUM SALAMA SCHOOL RENOVATION | U.S. | `ARAB `ABD AL KHALAT | AL ANBAR | Education | |
| $84,600 | AWARA VILLAGE CRITICAL INFRASTRUCTURE SECURITY SERVICE RENEWAL | U.S. | HUSAYN AL KHALIFAH | BAGHDAD | Protective Measures | |
| $10,000 | AZRAGIY A50KV GENERATOR | U.S. | HAMID KANNA | AL ANBAR | Electricity | |
| $256,200 | AZZAWI 3 TSU | U.S. | RUSHDI MULLA | BAGHDAD | Protective Measures | |
| $201,040 | AZZAWI 4 SOI | U.S. | RUSHDI MULLA | BAGHDAD | Protective Measures | |
| $20,000 | B/1-4 CAV MICROGRANT | U.S. | `UWAYRIJ | BAGHDAD | Econ. & Related Initiatives | |
| $74,000 | BA'AJ MARKET PLACE SHELTER CONSTRUCTION | U.S. | BIR ADAM | NINAWA | Civic Infrastructure Repair | |
| $450,000 | BACK UP ELECTRICAL POWER RENOVATION | U.S. | BAGHDAD | BAGHDAD | Electricity | |
| $284,335 | BAGHDAD COLLEGE RENOVAGTION | Iraq | AS SULAYKH | BAGHDAD | Civic Infrastructure Repair | |
| $5,324,058 | BAGHDAD INTERNATIONAL AIRPORT AIR TRAFFIC ELECTRICAL GRID RENOVATION | U.S. | BATRAH | BAGHDAD | Transportation | |
| $390,000 | BAGHDAD INTERNATIONAL AIRPORT AIR TRAFFIC RUNWAY SCRAPE AND PAINT | U.S. | ABU DIJA`I | BAGHDAD | Transportation | |
| $360,965 | BAGHDAD INTERNATIONAL AIRPORT CARGO TERMINAL INCREASE IN FUNDS | U.S. | DAWWARAT HAJI NAYIF | BABIL | Transportation | |
| $100,000 | BAGHDAD INTERNATIONAL AIRPORT RUNWAY LIGHTS | U.S. | ABU DIJA`I | BAGHDAD | Transportation | |
| $190,140 | BAGHDADI BOYS HIGH SCHOOL REFURBISHMENT | U.S. | AL BAGHDADI | AL ANBAR | Battle Damage | |
| $350,000 | BAKERY REBERBISHMENT | U.S. | SHAFI | SALAH AD DIN | Civic Infrastructure Repair | |
| $6,000 | BAKHIT HUMANITARIAN AID | U.S. | RAZAZA | KARBALA | Misc. Humanitarian & Recon. | |
| $25,250 | BARRACUDA RD WATERPIPE CONNECTION | U.S. | RAMADI CITY | AL ANBAR | Water & Sanitation | |
| $100,000 | BARRIER PAINTING ALONG RTE GOLD AND RTE DELTA | U.S. | HAJJI QATANIYAH | WASIT | Civil Clean-Up | |
| $64,750 | BARRIERS FOR ID FACILITY IN KARADAH | U.S. | SALM | BAGHDAD | Protective Measures | |
| $101,277 | BASATEEN SOUTH SOI [1RENEWAL] | U.S. | `ARAB AS`AD | BABIL | Protective Measures | |
| $48,900 | BASELINE AND CENTRAL TRAFFIC CIRCLE REPAIR | U.S. | `AJAL AS SALIM | AL ANBAR | Transportation | |
| $36,150 | BASELINE STREET WALL REPAIR | U.S. | RAMADI CITY | AL ANBAR | Civil Clean-Up | |
| $206,888 | BAZEL PUMPING STATION REHAB | U.S. | SHIMRAN AL MUSLO | AL ANBAR | Irrigation | |
| $2,016 | BD MAIN STREET MARKINGS | U.S. | ABU TUGHRAH | AL ANBAR | Transportation | |
| $114,240 | BENASADI SOI | U.S. | HUSAYN | BABIL | Protective Measures | |
| $160,500 | BIAP HEALTH CLINIC RENOVATION | U.S. | DAWWARAT HAJI NAYIF | BABIL | Health Care | |
| $846,574 | BIAP HOTEL LAND CLEAR AND PRELIM DESIGN | U.S. | BAGHDAD | Transportation | ||
| $45,000 | BLOOD ISLAND | U.S. | RAMADI CITY | AL ANBAR | Transportation | |
| $0 | BODIJA BRIDGE CRITICAL INFRASTRUCUTURE SECURITY SERVICE RENEWAL | U.S. | QADURI | DIYALA | Protective Measures | |
| $35,000 | BODY REFRIGERATOR FOR JORDANIAN HOSPITAL | U.S. | AL `AMIRIYAH | BAGHDAD | Econ. & Related Initiatives | |
| $30,000 | BOTTLED WATER | U.S. | BATRAH | BAGHDAD | Health Care | |
| $4,000 | BREWERS FOOT BRIDGE | U.S. | `ALI AN NU`MAN | AL ANBAR | Civic Infrastructure Repair |
© The Washington Post Company