Urgent Closed Repair Requests

See Also: All Closed Repair Requests at Roosevelt High School

Detailed Reports

Urgent Closed Repair Requests
Description Open Date Close Date Time Elapsed
FM-200115693 01 10/29/01 ROOSEVELT STADIUM STEEL RAILING URGENT !!! CODE A - CLEAR FOR REPAIRS AS OF 7/26/01(DCPS SAFETY SAG). July 23, 2001 October 29, 2001 98 days
FM-200118091 01 11/6/01 (ROOSEVELT) ASBESTOS ASSESSMENT REQ. BASEMENT/ KITCHEN 2 DECK MOUNT FAUCETS AND 2 WALL FAUCETS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/27/01. RONALD EDWARDS - SAFETY (202)576-6693 August 22, 2001 November 6, 2001 76 days
FM-200123632 /01 12/5/01 ROOSEVELT TANK ROOM 1. ASBESTOS ASSESSMENT REQUIRED 2.REPAIR OR REPLACE BROKEN 1 1/2" STEAM SUPPLY LINE LEAKING IN TANK ROOM. CODE A- CLEAR FOR REPAIR (BY HORNE ENGINEERING ROGER KAGER 11-21-01) S.R. HOWARD DCPS SAFETY 11-21-01 November 20, 2001 December 5, 2001 15 days
FM-200118088 01 2/1/02 (ROOSEVELT) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ MENS BATHROOM REPLACE SINGLE HOT AND COLD WATER FAUCETS IN SINK. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/27/01. RONALD EDWARDS - SAFETY (202)576-6693 August 22, 2001 February 1, 2002 163 days
FM-200118434 01 3/3/02 ROOSEVELT OUTSIDE - GROUNDS RE-GRADE SWALE AT WEST END OF FIELD ASBESTOS CODE A - CLEAR FOR REPAIR ON 08/30/01. CHARLES BUCHANAN - SAFETY (202)576-5582 August 27, 2001 March 3, 2002 188 days
FM-200204180 02 3/14/02 (Rooselvelt) Basement level: **Very Urgent** Need electrician to hook up electrical power to newly installed hot water tank. This is an urgent request, no hot water on the northwest side of building. March 11, 2002 March 14, 2002 3 days
FM-200204594 02 3/20/02 (Roosevelt) ***Urgent*** 1st floor/Artistic room: Need locksmith to replace the lock on the door of the artistic room. March 18, 2002 March 20, 2002 2 days
FM-200203157 02 4/1/02 (Roosevelt) Outside Play Area Break down and remove old playground equipment that has become a safety hazard. February 20, 2002 April 1, 2002 40 days
FM-200208225 02 6/3/02 (Roosevelt) !!!Very Very Urgent!!! 1st floor/Room #194: Floor drains in the home economics room, leaking down in basement, room #B-69; computer equipment is housed in this room and could very well be damaged by water. May 22, 2002 June 3, 2002 12 days
FM-200210083 02 6/25/02 (Roosevelt) !!Urgent!! 2nd Floor/Room #220: Need cylinder changed on classroom door; classroom has been damaged serveral times since the last occupant. Nurse Office: Change cylinder on inner and outer office doors. June 24, 2002 June 25, 2002 1 day
FM-200210147 02 6/27/02 (Roosevelt) Fire code violation: Page 1 of 7 Room #9 Exit light out. Code A-clear for repair by DCPS Safety ( Leroy Minton ) on 06/25/02 June 24, 2002 June 27, 2002 3 days
FM-200210222 02 6/27/02 (Roosevelt) Fire code violation: Page 3 of 7 2nd floor: Exit light out next to room #205. Code A-clear for repair by DCPS Safety ( Leroy Minton ) on 06/25/02 June 25, 2002 June 27, 2002 2 days
FM-200210221 02 6/27/02 (Roosevelt) Fire code violation: Page 2 of 7 Room #228: On the outside of room #228, exit light out. Code A-clear for repair by DCPS Safety ( Leroy Minton ) on 06/25/02 June 25, 2002 June 27, 2002 2 days
FM-200210301 02 7/3/02 (Roosevelt) Fire code violation: Page 6 of 7 Out side Room #178: Exit light out. Asbestos Code A - Clear for repairs on 06/26/02. DCPS Safety - Leroy Minton Jr (RG 06/27/02) June 25, 2002 July 3, 2002 8 days
FM-200210269 02 7/3/02 (Roosevelt) Fire code violation: Page 4 of 7 Gym Hallway: Exit light out. Asbestos Code A - Clear for repairs on 06/26/02. DCPS Safety - Leroy Minton Jr (RG 06/27/02) June 25, 2002 July 3, 2002 8 days
FM-200210268 02 7/15/02 (Roosevelt) Fire code violation: Page 4 of 7 Girls lockeroom: Broken return. Asbestos Code A - Clear for repairs on 06/26/02. DCPS Safety - Leroy Minton Jr (RG 06/27/02) June 25, 2002 July 15, 2002 20 days
FM-200210300 02 7/15/02 (Roosevelt) Fire code violation: Page 6 of 7 Barber Shop: Broken door return. Asbestos Code A - Clear for repairs on 06/26/02. DCPS Safety - Leroy Minton Jr (RG 06/27/02) June 25, 2002 July 15, 2002 20 days
FM-200209175 02 9/9/02 Roosevelt ****Urgent**** Ground Floor Exit Door to the Barber Shop Repair hinges on exit door---custodians are having a hard time securing this area. NO PENETRATION! June 7, 2002 September 9, 2002 94 days
FM-200220969 /02 11/21/02 (Roosevelt) !!!URGENT!!! Basement/Cafeteria: Glass broken in door. November 14, 2002 November 21, 2002 7 days
FM-200222435 /02 12/13/02 Roosevelt Tunnel Repair 3" steam pipe at flange *High Pressure Steam Escaping Into Building Safety Hazard* Asbestos Code A - Clear for repairs on 12/12/02. DCPS Safety - Richard Gibson (RG 12/12/02) December 12, 2002 December 13, 2002 1 day
FM-200210290 02 1/29/03 (Roosevelt) Fire code violation: Page 5 of 7 Pool office: Safety glass. June 25, 2002 January 29, 2003 218 days
FM-200227294 03 3/31/03 ROOSEVELT Ground Floor - Kitchen and Ladies restroom 1. Repair two flush valves inside of ladies room and existing hand sinks . Asbestos Code A - Clear for repairs on 03/19/03. DCPS Safety - Richard Gibson (RG) March 19, 2003 March 31, 2003 12 days
FM-200331557 03 6/17/03 (Roosevelt) !!!URGENT!!! Cosmetology Room: Remove gypsy bowl and install washing machine. June 10, 2003 June 17, 2003 7 days
FM-200339674 /03 10/29/03 (Roosevelt) !!!VERY URGENT!!! 3rd Floor/Ladies Bathroom near room #7 in O.B.E. area: Commode stopped up, and over-flowing when flushed. October 29, 2003 October 29, 2003 0 days
FM-200341410 /03 12/12/03 (Roosevelt) !!!VERY URGENT!!! Next Too Room #115: Sink needs to be hung on the wall in the girls bathroom. December 10, 2003 December 12, 2003 2 days
FM-200443180 04 1/30/04 (Roosevelt) !!!VERY URGENT!!! Basement/Kitchen: Unstop hand sink in kitchen: January 23, 2004 January 30, 2004 7 days
FM-200443565 04 2/4/04 Roosevelt Room B57/Hallway-A Building Repair busted coils in room B 57/Hallway -A Building. Leak has flooded serveral classrooms. Urgent !!!! February 2, 2004 February 4, 2004 2 days
FM-200444168 04 2/23/04 Roosevelt Boiler Room Repair or replace locks on Boiler Room door. Locks jammed sometime and door won't open. Security and safety hazard. Key knob and Dead bolt lock. February 18, 2004 February 23, 2004 5 days
FM-200445738 04 3/24/04 Roosevelt Boiler Room P.M Chiller Asbestos Code A - Clear for repairs on 03/24/04. DCPS Safety - Richard Gibson (RG) March 24, 2004 March 24, 2004 0 days
FM-200445504 04 3/31/04 Roosevelt 3RD Floor Room #4 Repair a small hole in univent coil. Leaking down into the next floor and can not be isolated. Urgent !!!!! March 17, 2004 March 31, 2004 14 days
FM-200446731 04 4/14/04 Roosevelt Urgent First floor room 204 Weld steel steps. It has a large hole where someone could get his or her foot hurt if it got stuck in it. April 14, 2004 April 14, 2004 0 days
FM-200445881 04 8/5/04 (Roosevelt) Asbestos Assessment Required. 3rd Floor/Room #313: Ceiling tile falling, should be repaired soon, as this is a hazard to student/staff walking in that room. (Injuries could be sustained) Asbestos Code A - Clear for repairs on 03/26/04. Horne Engineering - Bjame Smith (RG 03/26/04) March 25, 2004 August 5, 2004 133 days
FM-200452168 04 8/11/04 Roosevelt pool filtration mech room URGENT!!!!!!! Troubleshoot and make repairs to lights/ switch that service pool filtration and adjacent room / August 11, 2004 August 11, 2004 0 days
FM-200450419 04 8/26/04 Roosevelt Gym-Room #157 Asbestos assessment required on air handler unit #1. Repair rupture A/C coils in air handler unit #1, need A/C in Gym Area. Asbestos Code A - Clear for repairs on 07/20/04. DCPS Safety - Leroy Minton Jr. (RG 07/21/04) July 18, 2004 August 26, 2004 39 days
FM-200456212 04 10/29/04 Roosevelt Boiler Room Replace 3" Ball shut off gas valve on Boiler #1. Can not be isolated, need boiler for steam to kitchen. Gas company has shut gas to building. Urgent !!!! September 30, 2004 October 29, 2004 29 days
FM-200457381 /04 11/17/04 Roosevelt Mech. Room B 55 Asbestos assessment required Replace broken 3/4" line and regulator valve to expansion tank. Will not allow water to enter tank, Asbestos Code A Cleasred for repairs DCPS Safety R. Edwards 11/17/04 October 25, 2004 November 17, 2004 23 days
FM-200446664 04 11/19/04 (Roosevelt) !!!VERY URGENT!!! Basement/Kitchen: Electrical short in floor receptacle given off sparks. (Staff has shut the breaker off) April 13, 2004 November 19, 2004 220 days
FM-200225133 03 11/19/04 ROOSEVELT BOILER ROOM "URGENT URGENT URGENT" NO POWER TO BUILDING RESTORE ELECTRICAL SERVICE TO BUILDING. February 4, 2003 November 19, 2004 654 days
FM-200218760 02 11/19/04 Roosevelt First floor - Back hall near auditorium Provide and install four (4) light fixtures (4 tubes) Asbestos Code A - Clear for repairs on 10/11/02. DCPS-Safety - Leroy Minton Jr. (RG 10/15/02) October 3, 2002 November 19, 2004 778 days
FM-200457541 /04 12/2/04 (Roosevelt) !!!VERY URGENT!!! Basement/Kitchen: Electrical shocking jolts coming from garbage disposal when turned on. October 27, 2004 December 2, 2004 36 days
FM-200500690 05 1/24/05 Roosevelt Boiler Room Repair (4) four 20 amp breaker blown out by contractor installing new sump pump. (Most upper area are dark). Urgent !!!! January 22, 2005 January 24, 2005 2 days
FM-200459611 /04 2/2/05 Roosevelt AHU uNIT -#186 Replace lock on room #186, across from room #194. Urgent !!!! December 14, 2004 February 2, 2005 50 days
FM-200503339 05 3/29/05 Roosevelt First Floor Across From Gym - Custodial Closet 1) Pipe busted in wall behind sink. Water leaking constantly.. Water was cut off but sink is still leaking. Asbestos Code A - Clear for repairs on 03/29/05. DCPS Safety - Leroy Minton Jr. (RG 03/29/05) March 29, 2005 March 29, 2005 0 days
FM-200503398 05 4/15/05 (Roosevelt) "Urgent" First floor/Gymnasium Area. Repair or Replace lock on exterior door leading from Boys' locker room to the outside. Note: Teachers are currently unable to secure door when taking students back and forth to the outside track. March 30, 2005 April 15, 2005 16 days
FM-200450491 04 4/21/05 Roosevelt Outside area Bulk trash pick-up in room by cafeteria entrance: sofa, chairs, trees, computer monitor and etc...... Steps in front of building need patching with cement. Very dangerous. Also concrete walkway by ramp need to be fillied with cement. Has large hole were someone could break a foot or ankle. July 20, 2004 April 21, 2005 275 days
FM-200456410 04 6/7/05 Roosevelt Basement and first floor Replace door leading into cafeteria (steel door), Replace wwoden door in hallway in book room hall storage room. Repair door leading to courtyard. Repair mullion repaired so door will not jam. Door leading to armory need repairing. Asbestos Code A - Clear for repairs on 10/04/04. DCPS Safety - Leroy Mintion Jr. (RG 10/06/04) October 4, 2004 June 7, 2005 246 days
FM-200454052 04 7/27/05 ROOSEVELT SHS Bilingual Dept Rooms 5 & 10 Do asbestos assessment on damaged and falling wall plaster in rooms # 10 (director's office) and room # 5 on the third floor. Asbestos Code A - Clear for repairs on 09/13/04. DCPS Safety - Ronald Edwards (RG 09/15/04) September 8, 2004 July 27, 2005 322 days
FM-200501795 05 8/1/05 Roosevelt ( High School Bathroom Survey Report ) Basement Boys Restroom - Repair Ceiling Asst. Principal's Room - 103 - Plaster Ceiling Room 195 - Boys - Repair Ceiling Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) February 20, 2005 August 1, 2005 162 days
FM-200453446 04 8/1/05 Roosevelt Exterior Grounds 1) Repair existing hole in concrete to eliminate safety problem. August 27, 2004 August 1, 2005 339 days
FM-200457043 /04 8/1/05 Roosevelt First floor main office Replace door closer on door. Asbestos Code A - Clear for repairs on 10/19/04. DCPS Safety - Richard Gibson (RG 10/20/04) October 19, 2004 August 1, 2005 286 days
FM-200207013 02 8/2/05 Roosevelt Field Staduim area 1) Need ground crew to check pole light hanging from pole. The broken light is a safety hazard. May 2, 2002 August 2, 2005 1,188 days
FM-200515175 05 11/8/05 First & Second floor, Teachers' Restroom. "Urgent" 1.) First floor female teachers' restroom repair faucets to stop flow of hot water. 2.) Third floor male teachers' restroom repair existing urinal that does not work. November 7, 2005 November 8, 2005 1 day
FM-200515179 05 11/9/05 First & Second floor, Boys' & Girls' restrooms. "Urgent" 1.) Girls' restroom across from rm. 114, need flush valve on toilet. 2.) Boys' and Girls' restoom by rm 222 , urinal falling off wall needs to be remounted. Need to replace flush valve in one toilet and need vacuum breaker on another. November 7, 2005 November 9, 2005 2 days
FM-200122586 /01 2/3/06 ROOSEVELT GROUND - KITCHEN 1. ASBESTOS ASSESSMENT REQUIRED. 2. ADDITIONAL BREAKER SWITCH NEEDED TO SUPPLY POWER TO TWO DEEP FAT FRYERS. THESE BRAND NEW FRYERS HAVE BEEN DOWN AT LEAST FOUR (4) YEARS. ELECTRICIAN NEEDED. (URGENT) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/06/01 LEROY MINTON - SAFETY (202)576-6691 (RG) October 30, 2001 February 3, 2006 1,557 days
FM-200122856 01 2/3/06 (ROOSEVELT) 1. ASBESTOS ASSESSMENT REQUIRED. ROOM #5 NEED ADDITIONAL ELECTRICAL OUTLETS IN SECTIONS A & B. ASBESTOS CODE A-CLEAR FOR REPAIR 12/04/01 BY DCPS SAFETY CE BUCHANAN 202 439 7840 November 2, 2001 February 3, 2006 1,554 days
FM-200513194 05 2/6/06 (Roosevelt) "Urgent" Main Office, Room 101/Supply room in basement & Room 134. Need locks changed per principal's request. Note: See attached memorandum. September 27, 2005 February 6, 2006 132 days
FM-200619402 06 3/3/06 Roosevelt Basement - Near Tank Room Repair or replace three (3") galvanize hot water supply line, no hot water in Gym and part of main Building. Urgent !!!!! March 3, 2006 March 3, 2006 0 days
FM-200517325 06 3/3/06 Very Urgent: Replace broken windows in Rm. B11 (Armory); one window top pane is missing. January 11, 2006 March 3, 2006 51 days
FM-200455563 04 3/6/06 Roosevelt Basement Tunnel Near Cafeteria Unstop drains stop up, need a snake due to leaking sprinkler system in tunnel. Drains making work hard to complete in tunnel. Urgent !!!!!! September 24, 2004 March 6, 2006 528 days
FM-200517030 /05 3/6/06 Ground floor, Kitchen "Urgent" Need plumbers to unstop 3" floor drain under steamer pressure cooker, water is backing up all over floor. December 29, 2005 March 6, 2006 67 days
FM-200515305 05 3/6/06 Urgent: Second Fl. Boys Bathroom (across from-222) Urinal need to be re-hung it is falling off the wall and the commode need to be repaired November 9, 2005 March 6, 2006 117 days
FM-200500233 05 3/7/06 ROOSEVELT FIRST FL. WOMENS RESTROOM NEAR RM 118 BROKEN PIPE Asbestos Code A - Clear for repairs on 01/18/05. DCPS Safety - Leroy Minton Jr. (RG 01/19/05) January 7, 2005 March 7, 2006 424 days
FM-200617640 06 3/7/06 SW Tunnel Leading Out Of Boiler Room Very Urgent Repair 1 1/2 inch domestic water line Asbestos Code A - Clear for repairs on 01/25/06. Tidewater - Tony Marcolin (RG 01/27/06) January 20, 2006 March 7, 2006 46 days
FM-200459759 /04 3/8/06 ROOSEVLT First & Second Fl. Boys Rstrooms Rehang Floor Sinks to walls. Asbestos Code A - Clear for repairs on 12/17/04. DCPS Safety - Richard Gibson (RG) December 17, 2004 March 8, 2006 446 days
FM-200619731 06 3/11/06 Upper Pool Area "Emergency" Repair or Replace ruptured pipe in wall of upper pool area. The water is coming through the wall. Note: The plumbers said this repair did not require safety's involment. . March 10, 2006 March 11, 2006 1 day
FM-200222249 02 4/14/06 Roosevelt First floor - Computer Install cinder block partition to protect new computers from vandalism. 22' 2" wide Asbestos Code A- Cleared for repairs on 12-17-02 by Leroy Minton Jr (LM/01-15-04) Safety Office. 202-576-8962. December 9, 2002 April 14, 2006 1,222 days
FM-200620430 06 4/20/06 Second Floor-Stairwell Landing Fix the steel rail that is loose from the wall. Asbestos Code A - Clear for repairs on 03/28/06. DCPS Safety - Richard Gibson (RG) March 28, 2006 April 20, 2006 23 days
FM-200456879 /04 9/21/06 ROOSEVELT SHS B55 mech room URGENT URGENT Repair leaking 1-1/4 " gas line in tunnel near mech room B55. October 15, 2004 September 21, 2006 706 days
FM-200445505 04 11/20/06 Roosevelt Room #115 Replace univent in room #115. Univent coil and componts stripped. Herman Nelson Length 53" Wideth 15 1/2" Univent is not working. Urgent !!!!!!! March 17, 2004 November 20, 2006 978 days
FM-200458913 04 2/6/07 (Roosevelt) Asbestos Assessment Required. Cafeteria Manager's Office: Repair existing leakage in this office: leakage coming from exterior of building. Asbestos Code A - Clear for repairs on 12/02/04. DCPS Safety - Leroy Minton Jr. (RG 12/02/04) December 1, 2004 February 6, 2007 797 days
FM-200460135 /04 2/6/07 Roosevelt NE Tunnel Near Water Meter Unstop floor drain. Drain need to be unstop so that the contractor can work in area installing sump pump and electric wires. Urgent !!!!! December 30, 2004 February 6, 2007 768 days
FM-200626568 06 2/6/07 Roosevelt Boiler Room/Chiller Room Repair freon monitor will not reset. Stroll light is flashing. Urgent !!!!! August 1, 2006 February 6, 2007 189 days
FM-200456391 04 2/6/07 Roosevelt Basement, First, and Third Floor Repair or replace existing doors in the following areas - 1) Entrance door Room 338 from corridor. 2) Door from S.E. stairwell to basement corridor. 3) Double doors near Room 174. 4) Double doors left of Room 183. 5) Install new steel doors ,frames and locking hardware on double doors from N.W. stairwell to Third Floor. 6) Double doors from S.W. stairwell to 3rd Floor. 7) Double doors from S.W. stairwell to Basement. Asbestos Code A - Clear for repairs on 10/04/03. DCPS Safety - Leroy Minton (RG 10/06/04) October 4, 2004 February 6, 2007 855 days
FM-200504849 05 2/6/07 Roosevelt Hallway by Kitchen & Girls Restroom Repair busted coil on univent on 1st floor by Kitchen - A Side Repair busted line or coil in Girls restroom on 1st floor. Urgent !!!!! Asbestos Code A - Clear for repairs on 04/28/05. DCPS Safety - Charles Buchanan (RG 04/28/05) April 28, 2005 February 6, 2007 649 days
FM-200506530 05 2/6/07 Roosevelt Boiler Room Check and repair main breaker to boiler room. No power in boiler room. Chiller is down. Urgent !!!!!! June 9, 2005 February 6, 2007 607 days
FM-200455236 04 2/6/07 Roosevelt Basement and First Floor 1) Doors off hinges in Armory need to be re-hung . Door need replaced in Book Room and Hall Storage area. Door leading to Gym need to be replace and fixed. Code A - clear for repairs as of 9/23/04 safety Sylvia. September 21, 2004 February 6, 2007 868 days
FM-200516305 /05 2/6/07 Very Urgent: Some lights are out on the first floor in the halway, half of room 170, room 204 (over top of the auditorium), and in the gym area locker room. Note: See Mr. Charles Stewart December 12, 2005 February 6, 2007 421 days
FM-200444684 04 2/9/07 Roosevelt Boiler Room Repair circuit board for York Chiller #1. Microcomputer control HCFC 123 Part #371-01200 002 Urgent !!!! March 2, 2004 February 9, 2007 1,074 days
FM-200446123 04 2/9/07 Roosevelt SHS Pressure wash all interior and exterior surfaces of the cooling tower Clean all spray nozzles and/or grommets. Replace all eliminators Inspect and properly adjust all floats Perform preventive maintenance on all auxiliary equipment (including but not limited to: greasing motors, replacing all belts, etc.) Clean all debris from jobsite Replace, as necessary, defective spray nozzle and/or grommet each Replace, as necessary, defective floats each Poc - Jay Dolphin - 576-3364 Asbestos Code A - Clear for repairs on 03/31/04. DCPS Safety - Richard Gibson (RG) March 30, 2004 February 9, 2007 1,046 days
FM-200501554 05 3/20/07 Roosevelt Install 120 volt quad outlet near security console unit to be installed in main entrance lobby. Code A - clear for repairs as of 2/24/05. Sylvia Grimes Safety office. February 11, 2005 March 20, 2007 767 days
FM-200631564 /06 3/20/07 Roosevelt Room B-15 Correct electrical problem in room B-15 No lights in room. Need lights to see how to operate equipment. Safety Hazard !!!! October 31, 2006 March 20, 2007 140 days