Urgent Open Repair Requests
Description Open Date
FM-200205707 4/11/02 (Savoy) ****Urgent**** 1st Floor All Purpose Room There was a release of a white, powdery substance resulting from the mobile basketball court falling against the wall in the center of the stage, knocking a large piece out of the wall. Code A-clear for repair by Honre Engineer ( Z Mahmood) on 4/12/02 CEB April 11, 2002
FM-200337816 9/22/03 (Savoy) !!!VERY URGENT!!! 1st Floor/Hallway: Ceiling below roof was repaired previously. (Eight months ago.) Due to storm, the area has a very large breach, and needs to be repaired before a portion of ceiling falls on students or staff. This area is between the kitchen, and the all purpose room. Asbestos Code A - Clear for repairs on 09/23/03. Horne Engineering - Philp Connolly (RG 09/29/03) September 22, 2003
FM-200452722 8/16/04 Savoy First second and third floor hallways and mainentrance Replace all ceiling tiles that is stained and damaged. 152 stained ceiling tile (2x4) 23 missing tiles (2x4) 123 broken ceiling tile (2x4) 86 stained and milewed tile in library Asbestos Code A - Clear for repairs on 08/16/04. DCPS Safety - Richard Gibson (RG 08/16/04) August 16, 2004
FM-200503347 3/29/05 (Savoy) "Emergency" Asbestos Assessment Required. Roof/Cafeteria, Multi-Purpose Room. Reroute drain from roof water is pouring into multi-purpose room making the room flood. Asbestos Code A - Clear for repairs on 03/29/05. DCPS Safety - Leroy Minton Jr. (RG 03/29/05) March 29, 2005
FM-200617823 0617823 1/25/06 Exterior of entire Building Urgent Investigate and repair problem with lighting, some lights are not functioning at all January 25, 2006