Urgent Open Repair Requests
See Also: All Open Repair Requests at Benjamin Banneker Academic HS
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200450248 7/14/04 Banneker First floor auditorium Stage need to be redone / sanded down floor is wood and it is discolored. Asbestos Code A - Clear for repairs on 07/14504. DCPS Safety - Leroy Minton Jr. (RG 07/15/04) Asbestos Code A - Clear for repairs on 07/14/04. DCPS Safety - Leroy Minton Jr. (RG 07/15/04) | |
| FM-200502081 3/1/05 Banneker First floor gymnasium Bleachers are old and out dated. Do not pull out - wood has split so there is limited seating. one set can not be pulled out from wall for seating, because the release clutch will not unlock. These bleachers were condemn 2 years ago. The gym has no proper seating because of this problem. This is a safety hazard. | |
| FM-200504323 4/20/05 Banneker HEALTH CODE VIOLATION: 1) Cracked ceiling and walls/ tiles need to be repaired. Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Leroy Minton Jr. (RG 05/25/05) | |
| FM-200513690 10/11/05 Banneker Urgent Outside-9th St. Side Corner Remove tree that is laying on side walk, it makes the sidewalk not passable. | |
| FM-200515087 11/4/05 Urgent: The stage lights has a shortage or the light system needs new fuse's on the first floor in the auditorium. | |
| FM-200516021 12/3/05 Banneker Boiler Room Repair or replace condensate return pump. Control is not working properly, sometime. Urgent !!!! | |
| FM-200516809 12/20/05 Banneker Boiler Room Repair or replace in line circulating pumps (2) for domestic hot water. Bad coupling. Urgent !!!! | |
| FM-200620056 3/17/06 Kitchen - No hot water. Urgent !!! | |
| FM-200634280 1/24/07 Main Office - Steam leak in the radiator. Repair leik coming from leiking pipe coming through plaster ceiling Guidance Couselor Office. AMP Guidance Office HA 103 plaster White No Asbestos HA 707 Brown Coat No asbestos Code A-clear for repair by DCPS Enronmental health & Safety by Charles Buchanan on 1/31/07. | |
| FM-200701129 3/5/07 Repair plaster ceiling in guidance suite, office was close for safety. The plaster ceiling is non asbestos materials. Code A-clear for repair by Charles Buchanan on 3/5/07 | |
| FM-200701169 3/6/07 Repair plaster ceiling in "Guidance Suite", this office was closed by safety. Note: The plaster ceiling is non asbestos material. Asbestos Code A - Clear for repairs on 03/06/07. DCPS - Safety - Richard Gibson (RG) |