Description Open Date Close Date Time Elapsed
FM-200112691 01 9/7/01 SPINGARN ASBESTOS ASSESSMENT REQUIRED 1) EXPLORATORY NEEDED BOYS LOCKER ROOM./REPAIR STEAM LEAK IN FLOOR. DENOLITION ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/07/01. CHARLES BUCHANAN - SAFETY (202)576-5582 June 7, 2001 September 7, 2001 92 days
FM-200108614 01 9/8/01 SPINGARN BOYS LOCKER ROOM 1) ASBESTOS ASSESSMENT REQUIRED 2) REMOVAL OF WALL LOCKERS IN BOYS LOCKER ROOM AND DEMO THE FLOOR FOR A STEAM FITTERS REPAIR. POC: C. BRADLEY 202-438-7437 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/07/01. CHARLES BUCHANAN - SAFETY (202)576-5582 April 18, 2001 September 8, 2001 143 days
FM-200118667 01 9/17/01 (SPINGARN) ASBESTOS ASSESSMENT REQ. 1) REPLACE BROKEN WASH BOWL IN GIRLS TOILET. 2) REPLACE BROKEN TOILET IN BOYS TOILET. (AMERICAN STANDARD) ASBESTOS CODE A - CLEAR FOR REPAIR ON 08/30/01. LEROY MINTON - SAFETY (202)576-6691 August 28, 2001 September 17, 2001 20 days
FM-200118665 01 9/20/01 (SPINGARN) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/SECURITY OFFICE UNSTOP DRAIN IN SECURITY OFFICE. FIRST FLOOR STAND UP URINAL. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/29/01. LEROY MINTON - SAFETY (202)576-6691 August 28, 2001 September 20, 2001 23 days
FM-200120772 01 10/7/01 (SPINGARN) 3RD FLOOR/ # 324 CHANGE CYLINDER ON ROOM 324 SUPPLY TWO PASS KEYS AND SET CYLINDER UP ON 3RD FLOOR MASTER KEYS AND GRANDMASTER KEY. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/17/01. RONALD EDWARDS - SAFETY (202)576-6693 (RG) October 5, 2001 October 7, 2001 2 days
FM-200119464 01 10/9/01 SPINGARN BASEMENT BOYS LOCKER ROOM 1.ASBESTOS ASSESSMENT REQUIRED 2.REPAIR BLOCK WALL AND CONCRETE FLOOR IN BOY LOCKER ROOM, 16 FEET OF FLOOR. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/10/01. CHARLES BUCHANAN - SAFETY (202)576-5582 September 10, 2001 October 9, 2001 29 days
FM-200120008 01 10/12/01 (SPINGARN) ASBESTOS ASSESSMENT REQ. STADIUM/ VISITORS LOCKER RM/ GIRLS WATER LEAKING FROM UNDER COMMODE. WAX RING MAY BE NEEDED. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 September 17, 2001 October 12, 2001 25 days
FM-200118470 01 10/17/01 SPINGARN OUTSIDE - GROUNDS LABEL TOILET DOORS ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/17/01. LEROY MINTON - SAFETY (202)576-6691 August 27, 2001 October 17, 2001 51 days
FM-200120056 01 10/24/01 (SPINGARN) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ CORRIDOR WATER COOLER DOES NOT GET COLD. BY ROOM 123 WATER COOLER LEAKS. ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/20/01 BY DCPS SAFETY CHARLES E. BUCHANAN (202-567-5582) September 18, 2001 October 24, 2001 36 days
FM-200118579 01 10/26/01 (SPINGARN) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ GIRLS TOILET REPLACE HAND SINK IN GIRLS TOILET. (VANDALIZED) ASBESTOS CODE A - CLEAR FOR REPAIR ON 08/30/01. LEROY MINTON - SAFETY (202)576-6691 August 28, 2001 October 26, 2001 59 days
FM-200122390 /01 10/31/01 (SPINGARN) !!! URGENT !!! MR. HERBERT (ASST. CUSTODIAN) KEY TO THE BUILDING HAS CRACKED AND NEEDS HIS KEY TO BE REPLACED. October 29, 2001 October 31, 2001 2 days
FM-200120936 01 12/6/01 (SPINGARN) ASBESTOS ASSESSMENT REQ. ROOM 323 UPGRADE ELECTRICAL BRAKER FOR ROOM 323. BRAKER KEEPS TRIPPING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/18/01. RONALD EDWARDS - SAFETY (202)576-6691 October 3, 2001 December 6, 2001 64 days
FM-200111533 01 12/11/01 SPINGARN BASEMENT CUSTODIANS OFFICE RESTROOM 1) INSTALL LARGE ACCESS PANEL HOLE ALREADY IN WALL ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/20/01 BY DCPS SAFETY CHARLES E. BUCHANAN (202-567-5582) PLASTER WHITE NO ACM HA 017 BROWN COAT NO ACM HA 717 May 30, 2001 December 11, 2001 195 days
FM-200124809 /01 12/18/01 (SPINGARN) ASBESTOS ASSESSMENT REQUIRED 1ST FLOOR/ROOM 125-A REPLACE WIRE MESH GLASS IN CORRIDOR DOOR (11 1/2 INCHES X 19 3/4 INCHES) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/13/01. RONALD EDWARD - SAFETY (202)576-6693 December 10, 2001 December 18, 2001 8 days
FM-200125076 /01 1/9/02 (SPINGARN) !!EMERGENCY!! 1. ASBESTOS ASSESSMENT REQUIRED. 1ST FLOOR/CLASSROOM #124: DOOR NO LONGER ATTACHED TO FRAME; HAS COME AWAY COMPLETELY FROM FRAME AND HINGE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/13/01. RONALD EDWARD - SAFETY (202)576-6693 December 12, 2001 January 9, 2002 28 days
FM-200111408 01 1/18/02 SPINGARN BASEMENT CUSTODIANS OFFICE RESTROOM 1) UNSTOP COMMODE IN CUSTODIANS OFFICE RESTROOM BLOCKAGE MAY BE IN WASTE LINE ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/20/01 BY DCPS SAFETY CHARLES E. BUCHANAN (202-567-5582) THE UNSTOP COMMODE WAS REPAIR BY BUILDING STAFF. May 29, 2001 January 18, 2002 234 days
FM-200123195 01 1/18/02 (SPINGARN) ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ BOYS RESTROOM REPAIR OR REPLACE (4) FOUR SINKS INSIDE THIS RESTROOM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/29/01. RONALD EDWARDS - SAFETY (202)576-6693 November 9, 2001 January 18, 2002 70 days
FM-200115599 01 1/18/02 SPINGARN BOYS RESTROOM SPACE #189 REPLACE COMMODE DUE TO FIRE DAMAGE - COMMODE IS CRACKED BADLY. ASBESTOS CODE A-CLEAR FOR REPAIR ON 9/20/01 BY DCPS SAFETY CHARLES E. BUCHANAN (202-567-5582) July 23, 2001 January 18, 2002 179 days
FM-200202607 02 2/7/02 (SPINGARN) ***URGENT*** ASBESTOS ASSESSMENT REQUIRED CORNER OF 26TH & BENNING ROAD REPAIR SECURITY LIGHT ON THE CORNER OF THE BUILDING WHICH IS OUT (AREA IS DARK WHEN NIGHT SCHOOL STUDENTS ARE LEAVING THE BUILDING) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/07/02. RICHARD GIBSON - SAFETY (202)576-5584 February 7, 2002 February 7, 2002 0 days
FM-200202095 02 2/10/02 (SPINGARN) ASBESTOS ASSESSMENT REQUIRED BASEMENT (NEAR WEIGHT ROOM) REKEY OR INSTALL NEW LOCKS & PROVIDE 5 NEW KEYS. ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/30/02 RICHARD GIBSON - SAFETY (202)576-5584 (RG)-01/30/02 February 8, 2002 February 10, 2002 2 days
FM-200202550 02 2/10/02 (SPINGARN) ***URGENT*** 3RD FLOOR ROOM 321 ADJUST OR REPLACE LOCK WHICH DISENGAGES WITH A LITTLE SHAKING FROM OUTSIDE THE DOOR (COMPUTER LAB--NEED FUNCTIONING LOCK TO PROTECT EXPENSIVE EQUIPMENT AGAINST THEFT OR DAMAGE) February 8, 2002 February 10, 2002 2 days
FM-200202833 02 2/14/02 SPINGARN !!!! EMERGENCY !!!! 1. FIRST (1ST) FLOOR - SECURITY OFFICE - RESTROOM. 2. THIRD (3RD) FLOOR - OFFICE #329A (ASSIST. PRINCIPAL) REPLACE THE LOCK FOR BOTH AREAS. SAFETY HAZARD. February 11, 2002 February 14, 2002 3 days
FM-200118461 01 3/3/02 SPINGARN OUTSIDE - GROUNDS INSTALL TRASH CANS (2) 30 GAL. IN BLEACHERS ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/29/01. LEROY MINTON - SAFETY (202)576-6691 August 27, 2001 March 3, 2002 188 days
FM-200118454 01 3/3/02 SPINGARN OUTSIDE - GROUNDS CLEAR AND GRUB PERIMETER FENCE-LINE TO OPEN UP VISTA. DO NOT TOUCH TREES NEAR THE LANGSTON GOLF COURSE PARKING LOT. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/29/01. LEROY MINTON - SAFETY (202)576-6691 August 27, 2001 March 3, 2002 188 days
FM-200201841 02 3/6/02 (SPINGARN) WESTSIDE FENCE LINE CUT DOWN TREES & CUT BRUSH AWAY FROM THE FENCE LINE ON THE WEST SIDE OF THE BUILDING (SAFETY HAZARD) January 25, 2002 March 6, 2002 40 days
FM-200118453 01 3/30/02 SPINGARN OUTSIDE - GROUNDS REMOVE PLYWOOD LEADING TO THE FIELD AND PAVE LOW AREA ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/29/01. LEROY MINTON - SAFETY (202)576-6691 August 27, 2001 March 30, 2002 215 days
FM-200117044 01 4/2/02 SPINGARN ENTRANCE GATE ASBESTOS ASSESSMENT REQUIRED NEED LOCK AND TWO (2) KEYS FOR ENTRANCE GATE TO PARKING LOT TO PREVENT OUTSIDERS FROM PARKING ON TEACHERS PARKING LOT EXISTING LOCK WAS VANDALIZED. URGENT ! POSSIBLE BREAK-IN ASBESTOS CODE A-CLEAR FOR REPAIR BY 10/29/01 DCPS SAFETY : SRH August 9, 2001 April 2, 2002 236 days
FM-200124807 /01 4/23/02 (SPINGARN) ASBESTOS ASSESSMENT REQUIRED 3RD FLOOR/STAIRWELL #1 REPAIR SLATE STEP (6TH STEP DOWN FROM TOP) WHICH IS LOOSE AND POSES A SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/13/01. RONALD EDWARD - SAFETY (202)576-6693 December 10, 2001 April 23, 2002 134 days
FM-200124820 /01 4/23/02 (SPINGARN) 2ND FLOOR/STAIRWELL #2 REPAIR SLATE STEP (3RD STEP DOWN TO 1ST FLOOR) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 12/13/01. RONALD EDWARD - SAFETY (202)576-6693 December 10, 2001 April 23, 2002 134 days
FM-200207258 02 5/10/02 Spingarn ****Urgent**** Second (2nd) Floor - Classroom #218 The key is broken off and broken piece is lodged in the lock. Need the lock repaired or replaced--cannot secure area. May 7, 2002 May 10, 2002 3 days
FM-200208075 02 5/21/02 Spingarn ****Urgent**** Auditorium Balcony & Room 314 1. Rekey lock on doors on both sides of auditorium balcony. Students keep breaking into the area and vandalizing it. Cannot Must be able to secure area/need tough, hard to break locks. 2. Students have jammed something in the lock on the door to room 314, where computers are present. 3. Students have broken the lock to the door for room 301. May 20, 2002 May 21, 2002 1 day
FM-200206506 02 6/3/02 (Spingarn) ***Urgent*** 1. Asbestos assessment required. 3rd floor/custodians office: Sink stopped up. Asbestos Code A - Clear for repairs on 04/24/02 DCPS Safety - Richard Gibson (04/24/02) April 24, 2002 June 3, 2002 40 days
FM-200208649 02 6/3/02 Spingarn ****Urgent**** 2nd Floor Boys' Restroom Two sinks in the boys' restroom cannot be cleared by custodian. May 29, 2002 June 3, 2002 5 days
FM-200208648 02 6/5/02 Spingarn ****Urgent**** 1st Floor Stairway #6 Replace the wire-mesh glass in the door, where it was broken. Custodian already removed shards. May 29, 2002 June 5, 2002 7 days
FM-200212631 02 8/1/02 (Spingarn) Fire code violation: Page 2 of 3 Gym: Door closure broken-(Boys side) Asbestos Code A, Clear for repairs on 7/23/02 DCPS Safety, R. Edwards (RE - 7/23/02) July 23, 2002 August 1, 2002 9 days
FM-200212653 02 8/1/02 (Spingarn) Fire code violation: Page 3 of 3 1. Asbestos assessment required. Rec. room: Exit light out. Asbestos Code A, Clear for repairs on 7/23/02 DCPS Safety, R. Edwards (RE - 7/23/02) July 23, 2002 August 1, 2002 9 days
FM-200212652 02 8/1/02 (Spingarn) Fire code violation: Page 3 of 3 1. Asbestos assessment required. #4 Stairwell: Exit light out. Asbestos Code A, Clear for repairs on 7/23/02 DCPS Safety, R. Edwards (RE - 7/23/02) July 23, 2002 August 1, 2002 9 days
FM-200212650 02 8/1/02 (Spingarn) Fire code violation: Page 3 of 3 1. Asbestos assessment required. #0 Stairwell: Broken door closure: Asbestos Code A, Clear for repairs on 7/23/02 DCPS Safety, R. Edwards (RE - 7/23/02) July 23, 2002 August 1, 2002 9 days
FM-200212648 02 8/1/02 (Spingarn) Fire code violation: Page 3 of 3 1. Asbestos assessment required. Basement/Stairwell #1: Broken door closure: Asbestos Code A, Clear for repairs on 7/23/02 DCPS Safety, R. Edwards (RE - 7/23/02) July 23, 2002 August 1, 2002 9 days
FM-200212633 02 8/1/02 (Spingarn) Fire code violation: Page 2 of 3 1. Asbestos assessment required. Gym Door: Missing exit sign. Asbestos Code A, Clear for repairs on 7/23/02 DCPS Safety, R. Edwards (RE - 7/23/02) July 23, 2002 August 1, 2002 9 days
FM-200118668 01 9/9/02 (SPINGARN) ASBESTOS ASSESSMENT REQ. OUTSIDE BUILDING S.E. CORRECT WATER PROBLEM LEAKING IN FRONT OF BUILDING ON LAWN AREA. (WATER MAIN LEAK) ASBESTOS CODE A - CLEAR FOR REPAIR ON 08/30/01. LEROY MINTON - SAFETY (202)576-6691 EBA, INC - KING RYAN - 202-408-6111 August 28, 2001 September 9, 2002 377 days
FM-200214933 02 10/9/02 Spingarn ****Urgent**** 1st Floor Room 129 Rekey all of the lock to room 129. August 19, 2002 October 9, 2002 51 days
FM-200207097 02 10/10/02 Spingarn 1st Floor Room 123 & 2nd Floor Room 223 Install wire-mesh safety glass in new doors in 1st floor room 123 and 2nd floor room 223. May 3, 2002 October 10, 2002 160 days
FM-200213113 02 10/10/02 Spingarn Ground Floor - Armory 1) Ceiling tile and ceiling tile mastic are dropping from and needs to be cleaned up. ## The ceiling and ceiling tile mastic are both **No Asbestos Detected.** POC: Mr. Herbert, Custodian Code A Clear for Repair by DCPS Safety-Sheila R. Howard 07-25-02 site visit The material needs to be cleaned up and replaced after the water leakage problem is corrected. July 26, 2002 October 10, 2002 76 days
FM-200204738 02 10/10/02 (Spingarn) ***Very Urgent*** Ground Floor: Plaster stairwell outside of custodians office; wall is badly damaged. March 19, 2002 October 10, 2002 205 days
FM-200213094 02 10/10/02 Spingarn Basement - AMP rooms 5b and 6b TSI removal behind wall and hot method floor tile. Rooms 5a and 5b according to AMP;( Rooms 68 and 69 according to attached drawing) 1) Exploratory assessment to support planning, design and constructions renovation project. New work to include;installation of drain pipe and plumbing fixtures ( tap into existing system); Installation of 220 v receptacles ( floor mount receptacles);replace door and frame;repair steam and plumbing leaks, repair damaged plaster;Installation of air ventilators ,prepare abatement design respectively. See attached drawings... Asbestos Code A - Clear for repairs. Abated on 08/21/02 (LM 08/23/02) per Leroy Minton confirmation. Safety Office (202) 576-8962. July 26, 2002 October 10, 2002 76 days
FM-200112024 01 10/10/02 SPINGARN SHS ROOM #305 STRUCTURAL MAINT. PLEASE DETERMINE WHETHER THE EXISITING ELECTRICAL CAPACITY WILL HANDLE THE INSTALLATION OF 2 (TWO) 24,000 BTU WINDOW AC UNITS. UNITS ARE ON SITE CODE A-CLEAR FOR REPAIR BY DCPS SAFETY LM 8/2/01. June 1, 2001 October 10, 2002 496 days
FM-200218774 02 10/29/02 (Spingarn) !!!VERY URGENT!!! 2nd Floor/Custodial closet: Slop sink stopped up, water leaking inside access panel; water running down to the basement floor. October 3, 2002 October 29, 2002 26 days
FM-200221539 /02 12/2/02 (Spingarn) !!!VERY URGENT!!! Basement/Back entrance: Key was inserted in cylinder this morning, and would not catch, cylinder continued to spin around. Please respond as soon as possible, as this is the outside door leading to the inside entrance door. November 22, 2002 December 2, 2002 10 days
FM-200222779 /02 1/14/03 (Spingarn) 1. Asbestos assessment required. 2nd Floor/Room #222: Request locksmith to come out and survey lock to room and make adjusts, so that room can be secured. Code A - Cleared for repairs by Leroy Minton Jr on 01-28-03 (LM/02-03-03) Safety Office. 202-576-8962. December 18, 2002 January 14, 2003 27 days
FM-200213264 02 1/17/03 (Spingarn) !!!Very Very Urgent!!! Outside/Boiler room used for greenhouse: Due to attempted break-in wire mesh glass broke, and metal frame damaged, needs welding. July 29, 2002 January 17, 2003 172 days
FM-200213263 02 1/17/03 (Spingarn) !!!Very Very Urgent!!! Outside/Boiler room used for greenhouse: Due to attempted break-in, wire mesh glass broke and metal frame was damaged. July 29, 2002 January 17, 2003 172 days
FM-200222981 /02 1/21/03 (Spingarn) !!!VERY URGENT!!! Basement/Kitchen: Drains backing up. December 20, 2002 January 21, 2003 32 days
FM-200204349 02 1/21/03 (Spingarn) ****Urgent**** Replace three water fountains: 2 fountains on the 1st floor north side 1 fountain on the 2nd floor south side March 13, 2002 January 21, 2003 314 days
FM-200212543 02 2/12/03 (Spingarn) Fire code violation: Page 1 of 3 Room #306: Broken safety glass. July 22, 2002 February 12, 2003 205 days
FM-200227183 03 3/17/03 (Spingarn) !!!VERY URGENT!!! Basement/Kitchen: As garbage disposal operates and water drains out, water backs up, and runs out of the grease trap. (Grease trap has been cleaned) March 17, 2003 March 17, 2003 0 days
FM-200227474 03 3/26/03 SPINGARN Third Floor - classroom 1. Furnish and install a new lock . Door was replaced due to break in . Asbestos Code A - Clear for repairs on 03/24/03. DCPS Safety - Richard Gibson (RG) March 24, 2003 March 26, 2003 2 days
FM-200227705 03 3/28/03 SPINGARN First floor - Security office and print shop Requesting the lock to be change in security office. Requesting five (5) keys for security office. Requesting locksmith to check back door lock to print shop. It is hard to trun and door will open. Asbestos Code A - Clear for repairs on 03/24/03. DCPS Safety - Richard Gibson (RG) March 26, 2003 March 28, 2003 2 days
FM-200227636 03 4/3/03 (Spingarn) !!!VERY URGENT!!! Outside Stadium/Locker Room: No power in this area; lights will not come on. (Activities to take place on Wednesday, needs lights to see in the locker room) March 25, 2003 April 3, 2003 9 days
FM-200221350 /02 5/8/03 Spingarn Third floor by room 323 Requesting hole under the water fountain to be bricked by brick mason. Asbestos Code A - Clear for repairs on 11/20/02. DCPS Safety - Leroy Minton Jr. (RG 12/02/02) November 19, 2002 May 8, 2003 170 days
FM-200227658 03 5/14/03 SPINGARN !! URGENT !! Ground Floor - Kitchen 1. Unclog sink , that is backing up . March 26, 2003 May 14, 2003 49 days
FM-200330150 03 5/14/03 (Spingarn) !!!VERY URGENT!!! Outside Field/Steeple Chase: Drains are stopped up, and needing to be snaked out. Activities are to take place at this school today at 1:00 p.m. May 14, 2003 May 14, 2003 0 days
FM-200123572 /01 5/21/03 (SPINGARN) 1. ASBESTOS ASSESSMENT REQUIRED. 2ND FLOOR/ROOM #219: REPLACE WALL MOUNT FAUCET, (8) INCH SPREAD ON SERVICE SINK IN HOME EC. ROOM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/29/01 RONALD EDWARDS - SAFETY (202)576-6693(RG) November 19, 2001 May 21, 2003 548 days
FM-200330500 03 5/21/03 (Spingarn) !!!VERY URGENT!!! 2nd Floor/Room #211: Sink continues to stop up; running water backs up in the sink on the opposite side. Sink needs to be snaked out, as it is running over. May 21, 2003 May 21, 2003 0 days
FM-200123569 /01 5/21/03 (SPINGARN) 1. ASBESTOS ASSESSMENT REQUIRED. 2ND FLOOR/ROOM #219: REPLACE (8) INCH DECK MOUNT FAUCET IN 1/2 INCH GATE VALVES UNDER SINK IN HOME EC. ROOM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/29/01 RONALD EDWARDS - SAFETY (202)576-6693(RG) November 19, 2001 May 21, 2003 548 days
FM-200339612 /03 11/6/03 (Spingarn) !!!VERY URGENT!!! Kitchen: When garbage disposal is turned on, it backs up in the grease trap. October 28, 2003 November 6, 2003 9 days
FM-200337709 03 11/24/03 (Spingarn) !!!VERY URGENT!!! Basement/Barber Shop: Bathroom toilet backing up in the shower. 11/20/2003-Staff member called in to report repairs were never made, and problem still exist. September 17, 2003 November 24, 2003 68 days
FM-200444219 04 2/21/04 Spingarn Stay Urgent !!!!!! 1) Restore power to the Lobby Area and lights. February 19, 2004 February 21, 2004 2 days
FM-200109654 01 2/26/04 SPINGARN N. PARKING LOT - OUTSIDE RAMP REPLACE GUARD RAIL TO RAMP LEADING TO PARKING LOT NEAR BOILER ROOM (8 INCHES DROPOFF) SAFETY HAZARD. May 7, 2001 February 26, 2004 1,025 days
FM-200105009 01 3/1/04 SPINGARN FIRST (1ST) FLOOR - PRINCIPALS OFFICE/ ROOM -112 1) ASBESTOS ASSESSMENT REQUIRED. 2) REPAIR OR REPLACE HOLE IN FLOOR, PLASTERING. SAFETY HAZARD. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/25/01. March 5, 2001 March 1, 2004 1,092 days
FM-200213277 02 3/23/04 (Spingarn) ***Urgent*** Outside: Request welded frame over window in gardener's office. July 29, 2002 March 23, 2004 603 days
FM-200447132 04 4/30/04 Spingarn Basement inside cafeteria Requesting a plummer to survey the pipe sticking out of the wall. It looks to be a safety problem. April 26, 2004 April 30, 2004 4 days
FM-200448731 04 6/16/04 (Spingarn) !!!URGENT!!! 1st Floor/Custodial Closet: Sink stopped up, backing up in girls bathroom sink. June 2, 2004 June 16, 2004 14 days
FM-200453714 04 9/1/04 Spingarn !!!VERY URGENT!!! Basement Custodian office Need plumber to unstop toilet. September 01, 2004: Staff called in to report toilets are over-flowing. August 31, 2004 September 1, 2004 1 day
FM-200454727 04 9/14/04 (Spingarn) !!!VERY URGENT!!! 1st Floor/Boys Bathroom: Total of eight (8) urinals; all are stopped up, and running over. September 14, 2004 September 14, 2004 0 days
FM-200455295 04 10/13/04 Spingarn Fire Code Violation First floor Fire door at stair # 4, out of alignment. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 October 13, 2004 22 days
FM-200455207 04 10/13/04 Spingarn Fire Code Violation Third floor Replace ceiling tile in room 311. Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 20, 2004 October 13, 2004 23 days
FM-200455264 04 10/18/04 Spingarn Fire Code Violation Second floor Replace fire safety glass in fire doors, stair 5. September 21, 2004 October 18, 2004 27 days
FM-200455310 04 10/18/04 Spingarn Fire Code Violation First floor Missing fire safety glass in fire door, stair # 6.. September 21, 2004 October 18, 2004 27 days
FM-200455197 04 10/18/04 Spingarn Fire Code Violation Third floor Replace fire safety glass in door, room 322.. September 20, 2004 October 18, 2004 28 days
FM-200455191 04 10/18/04 Spingarn Fire Code Violation Third floor Replace fire safety glass in door, room 314. September 20, 2004 October 18, 2004 28 days
FM-200455188 04 10/18/04 Spingarn Fire Code Violation Third floor Replace fire safety glass in fire door, stair # 4. September 20, 2004 October 18, 2004 28 days
FM-200457180 /04 11/4/04 (Spingarn) 3rd Floor/Room #324: Repair or replace classroom door, damaged by vandals. Asbestos Code A - Clear for repairs on 10/22/04. DCPS Safety - Leroy Minton Jr. (RG 10/22/04) October 20, 2004 November 4, 2004 15 days
FM-200455206 04 11/10/04 Spingarn Fire Code Violation Third floor Entrance door to room 323, out of alignment. Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 20, 2004 November 10, 2004 51 days
FM-200458079 04 11/10/04 Spingarn Main Office - Next to the P.A. System ( Left of P.A. System there is a Green X is on the wall ). Place Board on top of Green X. 1) Install 4x4 plywood for telephone Eq. Poc - Andra J. King - 202-841-4986 Asbestos Code A - Clear for repairs on 11/09/04. DCPS Safety - Richard Gibson (RG) November 9, 2004 November 10, 2004 1 day
FM-200455312 04 11/10/04 Spingarn Fire Code Violation First floor Fire door missing to physical Ed suite. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 November 10, 2004 50 days
FM-200453253 04 11/16/04 Spingarn Basement Barber shop Requesting an carpenter to replace door closure existing one was broken by students.electrican to replace the ballast on the light.. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Richard Gibson (RG 08/27/04) August 24, 2004 November 16, 2004 84 days
FM-200457524 /04 12/2/04 Spingarn First floor auditorium Requesting safety to survey 9x9 tile on the side of the stage in the auditorium that need to be replaced. October 27, 2004 December 2, 2004 36 days
FM-200455301 04 12/6/04 Spingarn Fire Code Violation First floor Broken electrical plug inside room 126. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 6, 2004 76 days
FM-200455306 04 12/6/04 Spingarn Fire Code Violation First floor Missing exit light from gym, boys side. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 6, 2004 76 days
FM-200455307 04 12/6/04 Spingarn Fire Code Violation First floor Missing exit light from gym, girls side. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 6, 2004 76 days
FM-200455333 04 12/6/04 Spingarn Fire Code Violation Basement Exit light out down hall from store room # 19. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 6, 2004 76 days
FM-200455203 04 12/6/04 Spingarn Fire Code Violation Third floor Exit light out at stairwell # 7. Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 20, 2004 December 6, 2004 77 days
FM-200455201 04 12/6/04 Spingarn Fire Code Violation Third floor Resecure electrical conduit cable in room 329. Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 20, 2004 December 6, 2004 77 days
FM-200455199 04 12/6/04 Spingarn Fire Code Violation Third floor Missing exit light at stairwell #6. Asbestos Code A - Clear for repairs on 09/20/04. DCPS Safety - Richard Gibson. (RG) September 20, 2004 December 6, 2004 77 days
FM-200454312 04 12/8/04 SPINGARN SHS Improper safety valve piping on all boilers September 10, 2004 December 8, 2004 89 days
FM-200455198 04 12/14/04 Spingarn Fire Code Violation Third floor Damaged fire doors to room 326. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Leroy Minton Jr. (RG 09/22/04) September 20, 2004 December 14, 2004 85 days
FM-200501819 05 3/23/05 SPINGARN Third fl. Rms 311/ 323/ 315 Repair locks on classroom Doors Code A- clear for repairs as of 3/14/05 Sylvia Grimes safety office. February 22, 2005 March 23, 2005 29 days
FM-200512435 05 9/15/05 (Spingarn) "Very Urgent" Third floor. Repair or Replace water fountains in the 3rd floor corridors. Note: THE 3rd floor is occupied by "Special Education" students. September 13, 2005 September 15, 2005 2 days
FM-200228195 03 9/27/05 SPINGARN !! URGENT !! Water fountains Third floor across from 323, next to custodian office and across from 308. Second and first floor N/A Basement inside teachers cafe, inside rec., shoe shop and foundation by weight room and by room 25. Fountains need repairing. April 3, 2003 September 27, 2005 908 days
FM-200512551 05 9/27/05 (Spingarn) "Very Urgent" Third floor. Repair or Replace water fountains in the 3rd floor corridors. Note: THE 3rd floor is occupied by "Special Education" students. September 14, 2005 September 27, 2005 13 days
FM-200505200 05 9/29/05 Spingarn First fl.Boys Restroom Near Rm 116 Replace Damaged Flush Valve Asbestos Code A - Clear for repairs on 05/06/05. DCPS Safety - Richard Gibson (RG) May 6, 2005 September 29, 2005 146 days
FM-200228689 03 9/29/05 (Spingarn) !!!VERY URGENT!!! Outside/Stadium: "Mark Jenkins Relays" is to take place at the school on April 16, 2003; Mr. Paul Vance, Superintendent, and Mr. Ralph Neal will be attending. Request grass cutting on the stadium grounds. April 11, 2003 September 29, 2005 902 days
FM-200340211 /03 9/29/05 (Spingarn) !!!VERY URGENT!!! 1st Floor/Stairwell #8: Student kicked window out, please replace. November 12, 2003 September 29, 2005 687 days
FM-200458523 /04 9/29/05 Spingarn First Floor-stairway # 7 Replace Wire-Mesh window in classroom door. Asbestos Code A - Clear for repairs on 11/23/04. DCPS Safety - Leroy Minton Jr. (RG 11/23/04) November 19, 2004 September 29, 2005 314 days
FM-200224503 03 9/29/05 Spingran Boiler Room Install safety shut off switch front and rear entrance to boiler room. (Emergency shut off switch ) New Hi Pressure boiler has no cut off except at Boilers. January 24, 2003 September 29, 2005 979 days
FM-200501773 05 10/3/05 Spingarn First floor stairway # 6 and 7 Requesting person to measure and replace wire mess glass that was broken by students. Code A - clear for repairs as of 3/14/05 Sylvia Grimes safety office. February 18, 2005 October 3, 2005 227 days
FM-200446544 04 10/3/05 Spingarn !!!VERY URGENT!!! Lights on the roof Requesting an electrician to survey lights out over the front of the building. May 06, 2004: Principal has a concern for staff leaving the building in the evening without a lighted area. April 8, 2004 October 3, 2005 543 days
FM-200459957 /04 10/3/05 SPINGARN THIRD FL. STAIRWAY # 3 REPLACE GLASS IN TO PART OF WINDOW Asbestos Code A - Clear for repairs on 12/22/04. DCPS Safety - Leroy Minton Jr. (RG 12/22/04) December 21, 2004 October 3, 2005 286 days
FM-200459580 /04 10/3/05 Spingarn Second floor stairway # 4 Requesting a glaze person to measure and replace wire mesh glass. Asbestos Code A - Clear for repairs on 12/22/04. DCPS Safety - Leroy Minton Jr. (RG 12/22/04) December 14, 2004 October 3, 2005 293 days
FM-200504689 05 10/3/05 Spingarn Stairwell # 6 Measure and Replace Wire Mesh Glass Asbestos Code A - Clear for repairs on 04/23/05. DCPS Safety - Richard Gibson (RG) April 25, 2005 October 3, 2005 161 days
FM-200206293 02 10/3/05 Spingarn ****Urgent**** 1st Floor Auditorium Check lights and dimmer-board for an activity in the auditorium on 4/23/02 from 6pm until 8pm. April 23, 2002 October 3, 2005 1,259 days
FM-200502033 05 10/3/05 Spingarn Second floor room 207 Requesting a electrican to remove outlet in the back of the room off the floor. Code A - clear for repairs as of 3/14/05 Sylvia Grimes safety office. February 28, 2005 October 3, 2005 217 days
FM-200458600 /04 10/3/05 Spingarn 3rd floor 1st door from room 318 Hallway window need to be replaced, kids kickout the window. Asbestos Code A - Clear for repairs on 11/23/04. DCPS Safety - Leroy Minton Jr. (RG 11/23/04) November 22, 2004 October 3, 2005 315 days
FM-200203185 02 10/3/05 (Spingarn) ***Urgent*** 1st floor gymnasium A cracked window pane in the 1st floor gymnasium needs to be measured and replaced (cracked pain is still in place) posing a possible safety hazard. February 20, 2002 October 3, 2005 1,321 days
FM-200501478 05 10/3/05 Spingarn Rm 207 Heating Pipe is Leaking from the Ceiling. Safety Inspection is Requested. HA 017 Plaster White No Asbestos HA 717 Brown Coat with HA 017 No Asbestos Code A-claer for repair by DCPS Charles Buchanan on 2/16/05 February 9, 2005 October 3, 2005 236 days
FM-200501981 05 10/3/05 Spingarn 3, 2, 1 floors Requesting wire mess glass to be replaced on the following: Code A - clear for repairs as of 3/14/05 Sylvia Grimes. safety office. 3rd floor stairway # 6 and 4 2nd floor stairway # 7, 5 and 4 and door by room 212 1st floor stairway # 6 and by boys sideof the gym, and door by security office. 3rd floor room # 324 and 328. February 25, 2005 October 3, 2005 220 days
FM-200450451 04 10/3/05 (Spingarn) !!!URGENT!!! Through-Out Stairwell #1: Restore electricity to the 3rd, 2nd, 1st, and basement floors. July 19, 2004 October 3, 2005 441 days
FM-200216290 02 10/3/05 (Spingarn) !!!Very Very Urgent!!! 1. Asbestos assessment required. Roof/South and West: Replace flashers, damaged by storm; six peices approximately 9 feet long and 1 foot wide, flat and sleight side. Asbestos Code A-clear for repair by Horne Engineer Sam Ebrahim On 9/05/02 DCPS Charles E. Buchanan August 30, 2002 October 3, 2005 1,130 days
FM-200455200 04 10/24/05 Spingarn Fire Code Violation Third floor Improper storage on floor on floor in room 331. Asbestos Code A - Clear for repairs on 09/20/04. DCPS Safety - Richard Gibson. (RG) September 20, 2004 October 24, 2005 399 days
FM-200455187 04 10/24/05 Spingarn Fire Code Violation Third floor Replace Electrical coverplate in room 308. Asbestos Code A - Clear for repairs on 09/20/04. DCPS Safety - Richard Gibson. (RG) September 20, 2004 October 24, 2005 399 days
FM-200458733 /04 11/16/05 Spingarn Girls side of the gym Requesting a carpenter to repair or replace on rotten hinge on door. Asbestos Code A - Clear for repairs on 12/02/04. DCPS Safety - Leroy Minton Jr. (RG 12/02/04) November 29, 2004 November 16, 2005 352 days
FM-200457816 04 11/16/05 Spingarn Third Floor - Room 330 1) Repair or replace classroom door that was damaged by students. Asbestos Code A - Clear for repairs on 11/02/04. DCPS Safety - Richard Gibson (RG) November 2, 2004 November 16, 2005 379 days
FM-200502886 05 11/16/05 Spingarn Stairwell # 4 Replace Existing Doors Asbestos Code A - Clear for repairs on 03/30/05. DCPS Safety - Leroy Minton Jr. (RG 03/30/05) March 17, 2005 November 16, 2005 244 days
FM-200454168 04 12/8/05 (Spingarn) !VANDALISM! 3rd Floor/Room #228: Repair or replace door that is cracked, and damaged by students Asbestos Code A - Clear for repairs on 09/10/04. DCPS Safety - Leroy Minton Jr. (RG 09/10/04) September 9, 2004 December 8, 2005 455 days
FM-200500076 05 12/20/05 Spingarn Third floor stairway # 6-7 Replace exit sign that was broken by student. Asbestos Code A - Clear for repairs on 01/04/05. DCPS Safety - Richard Gibson (RG 01/04/05) January 4, 2005 December 20, 2005 350 days
FM-200513791 /05 12/20/05 Spingarn Urgent Basement-Cafeteria Replace all bad light fixtures. October 12, 2005 December 20, 2005 69 days
FM-200513798 /05 12/20/05 Spingarn Very Urgent First Floor-Stairway #6 Replace broken switch that controls light on the stairway. October 12, 2005 December 20, 2005 69 days
FM-200455311 04 12/27/05 Spingarn Fire Code Violation First floor Missing handrail in stair # 7. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 27, 2005 462 days
FM-200455286 04 12/27/05 Spingarn Fire Code Violation First floor Missing fire door next to stair # 3. Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 27, 2005 462 days
FM-200455298 04 12/27/05 Spingarn Fire Code Violation First floor Missing fire door at stairwell # 5. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 27, 2005 462 days
FM-200455330 04 12/27/05 Spingarn Fire Code Violation Basement Broken door closer on door to barber shop office. Asbestos Code A - Clear for repairs on 09/22/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 27, 2005 462 days
FM-200455282 04 12/27/05 Spingarn Fire Code Violation First floor Missing handrail in exitway from stage (Left). Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 27, 2005 462 days
FM-200455280 04 12/27/05 Spingarn Fire Code Violation First floor Missing handrail in exitway from stage (right). Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 27, 2005 462 days
FM-200455261 04 12/27/05 Spingarn Fire Code Violation Second floor Fire doors out of alignment next to room 218. Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 21, 2004 December 27, 2005 462 days
FM-200455211 04 12/27/05 Spingarn Fire Code Violation Third floor Fire door out of alignment at stair # 1. Asbestos Code A - Clear for repairs on 09/21/04. DCPS Safety - Richard Gibson (RG) September 20, 2004 December 27, 2005 463 days
FM-200455193 04 12/27/05 Spingarn Fire Code Violation Third floor Boys bathroom door in need of door closer. Asbestos Code A - Clear for repairs on 09/20/04. DCPS Safety - Richard Gibson. (RG) September 20, 2004 December 27, 2005 463 days
FM-200455190 04 12/27/05 Spingarn Fire Code Violation Third floor Replace door closer on storage room across from room 308. Asbestos Code A - Clear for repairs on 09/20/04. DCPS Safety - Richard Gibson. (RG) September 20, 2004 December 27, 2005 463 days
FM-200617630 06 1/30/06 "Urgent" Third floor, Rooms 319A and 319B. Need electrician to do an assessment of electrical outlets and circuits in rooms 319A and 319B. Note: Breaker trips continuously. January 20, 2006 January 30, 2006 10 days
FM-200120003 01 2/3/06 (SPINGARN) ASBESTOS ASSESSMENT REQ. !!!! URGENT !!!!! 306, 326, NURSES OFFICE THESE ROOMS ARE UNSAFE AND NEED PLASTER AND PAINT. THE CEILINGS IN THESE ROOMS ARE DAMAGED BADLY. ASBESTOS CODE A-CLEAN FOR REPAIR ON 9/19/01 BY HORNE ENGINEER RICHARD BYRD September 17, 2001 February 3, 2006 1,600 days
FM-200118464 01 2/3/06 SPINGARN OUTSIDE - GROUNDS PROFESSIONALLY TOUCH-UP YELLOW PAINTING DONE BY THE FOOTBALL TEAM ASBESTOS CODE A - CLEAR FOR REPAIR ON 08/30/01. SYLVIA GRIMES - SAFETY (202)576-5583 August 27, 2001 February 3, 2006 1,621 days
FM-200118666 01 2/3/06 (SPINGARN) ASBESTOS ASSESSMENT REQ. REPAIR OR REPLACE LEAKING FAUCETS OR NON WORKING FAUCETS FOR THE FOLLOWING ROOMS: 115, 119, 218, 219, 307, AND 310. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/29/01. LEROY MINTON - SAFETY (202)576-6691 August 28, 2001 February 3, 2006 1,620 days
FM-200127268 02 2/3/06 (SPINGARN) ASBESTOS ASSESSMENT REQUIRED ARMORY REPLACE CEILING TILE DAMAGED BECAUSE OF A LEAKING TOILET IN RESTROOM ABOVE. ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/17/02 SYLVIA GRIMES - SAFETY (202)576-5583 (RG) January 11, 2002 February 3, 2006 1,484 days
FM-200515201 05 2/8/06 Urgent: Replace existing door closer that was broken by a student, room 314 door on the third floor. Code A-clear for repair by DCPS Charles Buchanan on 11/09/05 November 8, 2005 February 8, 2006 92 days
FM-200515951 05 2/14/06 Spingarn Room #307 Asbestos assessment required Repair or replace rupture steam line in wall of room #307. Urgent !!!! Asbestos Code A - Clear for repairs on 11/30/05. Tidewater - Tony Marcolin (RG 12/05/05) SEE ASSESSMENTS December 1, 2005 February 14, 2006 75 days
FM-200453249 04 2/22/06 Spingarn Third floor room 306 Requesting carpenter to replace door closure that was destoryed by students. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Richard Gibson (RG 08/27/04) August 24, 2004 February 22, 2006 547 days
FM-200207088 02 4/14/06 Spingarn Asbestos Assessment Reqd. 3rd Floor Custodial Closet Close hole in brick wall in custodial closet. Asbestos Code A - Clear for repairs on 05/03/02. DCPS Safety - Richard Gibson (RG 05/03/02) May 3, 2002 April 14, 2006 1,442 days
FM-200620370 06 4/19/06 Second floor, Night School Storage Room. "Urgent Replace lock to storage room that was damaged by students. March 27, 2006 April 19, 2006 23 days
FM-200618583 06 6/6/06 Spingarn Boiler Room Repair or replace condensate pump #1 and #2 are not working. Also repair or replace control starter for pumps. Losing returns form Boilers. Urgent !!!!! February 13, 2006 June 6, 2006 113 days
FM-200515202 05 6/7/06 Urgent: Unstop custodian sink on the first floor in the custodial closet. It causes sinks in the girls restroom to become stopped up as well. November 8, 2005 June 7, 2006 211 days
FM-200516074 05 6/7/06 "Urgent" Second Floor, Custodian closet. Unstop sink in custodian closet. December 5, 2005 June 7, 2006 184 days
FM-200448144 04 6/8/06 (Spingarn) !!!URGENT!!! Basement/Kitchen: Request plumber to snake out drain; water will back up when running. (This drain is located near deep fryers) May 19, 2004 June 8, 2006 750 days
FM-200205628 02 8/25/06 Spingarn Basement kitchen storage room Replace defective reducing station in storeroom. Station by-pass too much steam setting off safety valve. April 9, 2002 August 25, 2006 1,599 days
FM-200624612 06 9/15/06 Second Floor/Window Broken In Front Of Stairwel #5 Asbetos Code A = Cleared for repairs on 06/30/06 by Tidewater (LM/06-30-06) Safety Office 202-468-6269. June 21, 2006 September 15, 2006 86 days
FM-200624656 06 9/15/06 First Floor/Stairwell #6 Safety Glass Missing Asbetos Code A = Cleared for repairs on 06/30/06 by Tidewater (LM/06-30-06) Safety Office 202-468-6269. June 22, 2006 September 15, 2006 85 days
FM-200457964 04 1/30/07 Spingarn Room 326 Need glass put back in the door. Asbestos Code A - Clear for repairs on 11/08/04. DCPS Safety - Leroy Minton Jr. (RG 11/08/04) November 5, 2004 January 30, 2007 816 days
FM-200618270 06 1/30/07 Third Floor-Classrooms 319A and 319B Repair windows to prevent further injuries Safety Hazard Asbesto Code A - Clear for repairs on 03/10/06 Tidewater - Tony Marcolin (RG 03/13/06) February 3, 2006 January 30, 2007 361 days
FM-200617656 06 1/30/07 "Urgent" Third floor, Rooms 319A and 319B. Furnish and Install an emerson electric motor, Frame 56Z, hp-1/20, Volts-115, CYC-60-PH-1, Model K6-OCP-207, RPM-750 to be installed in univent in rooms 319A and 319B. Note: Univent needs to be rewired before installation of new motor according to Mr. Rogers, engineer. January 20, 2006 January 30, 2007 375 days
FM-200515937 05 1/30/07 Spingarn Boiler Room Repair or replace condensate pumps and motor control to condensate pump. Not working. Urgent !!!! December 1, 2005 January 30, 2007 425 days
FM-200208141 02 1/30/07 Spingarn Classroom #308 Asbestos Assessment Required Window overhead ceiling leaking water from the roof. Damage to the property. Safety Hazard. Code A-clear for repair by Horne Engineer ( Troy Wilcome ) on 5/23/02 May 21, 2002 January 30, 2007 1,715 days
FM-200516244 05 1/30/07 Third floor, Room 319. "Urgent" Repair or Replace heating unit. Please restore heat in room 319, heating unit does not work. Note: The principal has grown very impatient. December 9, 2005 January 30, 2007 417 days
FM-200504487 05 1/30/07 ( SPINGARN ) Second Floor - by Room 211 1) Replace wire mess glass. Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Leory Minton Jr.(RG 04/20/05) April 21, 2005 January 30, 2007 649 days
FM-200336106 03 1/30/07 (Spingarn) !!VERY URGENT!! 1st Floor/Assist. Principal's Office and Room #116: Air conditioners in both area's are blowing hot air. August 22, 2003 January 30, 2007 1,257 days
FM-200449426 04 2/15/07 (Spingarn) !!!URGENT!!! 3rd Floor/Stairwell #1: Light fixture hanging. June 17, 2004 February 15, 2007 973 days
FM-200455718 04 2/28/07 (Spingarn) !!!VERY URGENT!!! 3rd Floor/Stairway #4: Replace hallway metal window frame damaged by vandals; frame is bent, and falling out of the window. HA 017 Plaster White NAD HA 717 Brown Coat With HA 017 NAD Code A-clear for repair by DCPS Charles Buchanan on 9/27/04 September 24, 2004 February 28, 2007 887 days
FM-200451998 04 2/28/07 Spingarn First and third floor girls Requesting doors to be replaced on stalls in restroom. Asbestos Code A - Clear for repairs on 08/11/04. DCPS Safety - Richard Gibson (RG) August 10, 2004 February 28, 2007 932 days
FM-200453225 04 2/28/07 Spingarn Second floor room 220 Requesting an plaster to fix hole in the ceiling due to the leak coming from the room above. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Richard Gibson (RG) August 24, 2004 February 28, 2007 918 days
FM-200500075 05 2/28/07 Spingarn Third floor stairway # 6 Replace door closure that was broken by student. Asbestos Code A - Clear for repairs on 01/03/05. DCPS Safety - Richard Gibson (RG 01/04/05) January 4, 2005 February 28, 2007 785 days
FM-200458892 04 2/28/07 Spingarn Third floor across from room 311 Requesting breach in wall to be fixed. Asbestos Code A - Clear for repairs on 12/01/04. DCPS Safety - Richard Gibson (RG 12/01/04) December 1, 2004 February 28, 2007 819 days
FM-200502789 05 2/28/07 (Spingarn) Asbestos Assessment Required Second floor/Stairway #8 Repair or Replace broken handrail. Asbestos Code A - Clear for repairs on 03/16/05. DCPS Safety - Richard Gibson (RG) March 16, 2005 February 28, 2007 714 days
FM-200505107 05 2/28/07 Spingarn First fl. Stairwell # 6 & # 7 Basement Repair Door Closers Lead & Asbestos Code A - Clear for repairs on 05/04/05. DCPS Safety - Richard Gibson (RG) May 4, 2005 February 28, 2007 665 days
FM-200452880 04 2/28/07 Spingarn Basement stairway # 2 and # 7 The handrail need replacing existing rail was broken by the students. Asbestos Code A - Clear for repairs on 08/18/04. DCPS Safety - Richard Gibson (RG) August 18, 2004 February 28, 2007 924 days
FM-200515205 05 2/28/07 Urgent: Replace door closer on the second floor rm. 222 door. Code A-clear for repair by DCPS Charles Buchanan on 11/09/05 November 8, 2005 February 28, 2007 477 days
FM-200221353 /02 2/28/07 Spingarn Basement room 25 Requesting outer walls in classroom to be plastered were there is holes in wall. Asbestos Code A-clear for repair by Horne Engineer Sheryll James DCPS Safety on 11/21/02 Charles E. Buchanan November 19, 2002 February 28, 2007 1,562 days
FM-200217571 02 2/28/07 Spingarn ****Urgent**** Asbestos Assessment Reqd. 3rd FLoor Rooms 316 & 326 1. The double doors [wooden] for these two rooms have been split and/or damaged by students trying to kick the doors in. At room 326, the door is split down the center. The door and lock is damaged at room316. Replace the wooden double doors for these two classrooms; and 2. Once the new doors are in place, new locks are needed. Asbestos Code A - Cleared for repairs on 09-18-02 (LM 09-18-02) per Leroy Minton confirmation. Safety Office. (202) 576-8962. September 16, 2002 February 28, 2007 1,626 days
FM-200220036 /02 2/28/07 (Spingarn) !!!URGENT!!! 3rd Floor/Rooms #316 & 326: Due to break-in, replace these two classroom doors; unable to secure area. October 25, 2002 February 28, 2007 1,587 days
FM-200213261 02 3/1/07 Spingarn Room 211 1. Asbestos assessment required. Make electrical adjustments - run electrical outlets for 2 window a/c units and electrical line for microwave oven and computer. Code A Clear for Repair by Leroy Minton, Jr. DCPS Safety-07-30-02 DCPS Safety-Sheila R. Howard 07-30-02 July 26, 2002 March 1, 2007 1,679 days
FM-200459826 /04 3/1/07 SPINGARN FIRST FL. RM 126 INSTALL DUPLEX RECEPTACLE Asbestos Code A - Clear for repairs on 12/22/04. DCPS Safety - Leroy Minton Jr. (RG 12/22/04) December 20, 2004 March 1, 2007 801 days
FM-200512455 05 3/1/07 (Spingarn) "Very Urgent" Third floor. Need electricians to assess and repair problem. Note: When spot cooler is turned on all the lights inside classroom goes off, spot cooler may need a dedicated circuit. September 13, 2005 March 1, 2007 534 days
FM-200622396 06 3/1/07 Basement- Boys Lockerroom VERY URGENT! The children kicked the door in completely. The door needs to be replaced/repaired and installed. (THE BOY'S LOCKERROOM IS OPEN WITH FULL EXPOSURER TO STUDENTS PASSING BY) Asbestos Code A - Clear for repairs on 05/11/06. Tidewater - Thomas Johnson (RG 05/12/06 May 9, 2006 March 1, 2007 296 days
FM-200504271 05 3/2/07 ( SPINGARN ) Third Floor - Stairway #4 1) Replace wire mesh glass. Asbestos Code A - Clear for repairs on 04/19/05. DCPS Safety - Leory Minton Jr.(RG 04/20/05) April 19, 2005 March 2, 2007 682 days
FM-200207099 02 3/2/07 Spingarn Asbestos Assessment Reqd. 2nd Floor Custodial Closet Close hole in brick wall in custodial closet. Asbestos Code A - Clear for repairs on 05/03/02. DCPS Safety - Richard Gibson (RG 05/03/02) May 3, 2002 March 2, 2007 1,764 days
FM-200502250 05 3/2/07 Spingarn Third floor rooms 326 and 328 Requesting safety to survey roof leaking on the rooms and check out the spot that looks like mold in room 328. Water damage has shown up from when it rains. AMP Room 309 AMP Room 305 HA 017 Plaster White No Asbestos HA 717 Brown Coat With HA 017 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 March 4, 2005 March 2, 2007 728 days
FM-200501801 05 3/2/07 Spingarn ( High School Bathroom Survey Report ) Second Floor Boys Restroom - Paint Walls and Ceiling First Floor Boys Restroom - Paint Walls and Ceiling First Floor Girls Restroom - Paint Walls and Ceiling Boys Locker Room - Paint Walls and Ceiling Girls Locler Room - Paint Walls and Ceiling Code A- clear for repairs as of 3/15/05 Sylvia Grimes safety office. Paint tested negative in earlier survey's 03/15/2005 10:28 SG - February 20, 2005 March 2, 2007 740 days
FM-200501771 05 3/2/07 Spingarn First floor room 115 Requesting safety to survey leak from the ceiling. HA 017 Plaster Coat No Asbestos HA 717 Brown Coat With HA 017 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 February 18, 2005 March 2, 2007 742 days