Closed Repair Requests: January 2005

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

January 2005 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 25 Days
  • Routine Requests
    2
    Average Time Elapsed: 80.5 Days
  • Total Requests
    3

Detailed Reports

Urgent Repair Requests Completed in January 2005 (1)
Description Open Date Close Date Time Elapsed
FM-200459378 04 1/3/05 Stuart-Hopson Outside steps leading to boiler room Repair or replace metal railing on the steps leading to the boiler room. Asbestos Code A - Clear for repairs on 12/09/04. DCPS Safety - Richard Gibson (RG) December 9, 2004 January 3, 2005 25 days

Routine Repair Requests Completed in January 2005 (2)
Description Open Date Close Date Time Elapsed
FM-200457693 04 1/3/05 Stuart-Hobson Girls Gym Air Handler unit Repair leak on air handler unit in Girls Gym. November 1, 2004 January 3, 2005 63 days
FM-200456082 04 1/5/05 Stuart-Hobson Second floor girls restroom Commode does not flush, need attention. Students have to use the restroom, also restroom door stalls 4 needs to be fix.Water fountains gone is leaking, ther others in not working. September 29, 2004 January 5, 2005 98 days