Closed Repair Requests: January 2006

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

January 2006 Summary

  • Urgent Requests
    11
    Average Time Elapsed: 547.5 Days
  • Routine Requests
    27
    Average Time Elapsed: 686.4 Days
  • Total Requests
    38

Detailed Reports

Urgent Repair Requests Completed in January 2006 (11)
Description Open Date Close Date Time Elapsed
FM-200514147 /05 1/20/06 (Stuart-Hobson) "Urgent" Ground floor, Kitchen Cafeteria. Plaster & Paint walls and ceiling in storage room located in the kitchen area. Note: Plaster and paint are falling into food. Lead & Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Rodney Distance (RG 10/28/05) October 22, 2005 January 20, 2006 90 days
FM-200510272 05 1/30/06 Stuart-Hobsen Urgent!! Second Floor-Room 201/Computer Lab. Change the lock. Note: Need to get into the room, then change the locks (the teacher left and lost the keys) August 12, 2005 January 30, 2006 171 days
FM-200617401 06 1/30/06 Basement-VMJ Library Very Urgent Investigate, repair or replace electrical floor outlets in this area; there is no power in any of the floor outlets making usage of computers impossible. January 13, 2006 January 30, 2006 17 days
FM-200222306 /02 1/30/06 Stuart-Hobsob Basement - Cafeteria bathroom Ceiling fell out in two areas, due to the girls bathroom on first floor flooded. This is considered an health and safety hazard. Asbestos Code A - Clear for repairs on 12/12/02. Horne Engineering - Bipin Nanavaty (RG 12/13/02) December 10, 2002 January 30, 2006 1,147 days
FM-200341516 /03 1/30/06 Stuart-Hobson First floor boys bathroom Plummers had ro cut hole on side of urinal to fix lines that so backed up. Replace urinal that was damaged while repairing fixtures lines. Safety hazard asbestos assessment. Asbestos Code A - Clear for repairs on 12/15/03. Horne Engineering - Troy Wilcome (RG 12/17/03) December 12, 2003 January 30, 2006 780 days
FM-200514136 /05 1/30/06 (Stuart-Hobson) "Urgent" Ground floor,Kitchen Repair or Replace garbage disposal. October 22, 2005 January 30, 2006 100 days
FM-200450265 04 1/30/06 (Stuart-Hobson) !!!URGENT!!! Basement/Hallway: Lights are out needs attention immediately. July 14, 2004 January 30, 2006 565 days
FM-200217643 02 1/30/06 Stuart-Hobson ****Urgent**** 1st Floor Main Hallway 1. The hallway light has a short in it; and 2. The 5th Street side exit lights are completely out. September 17, 2002 January 30, 2006 1,231 days
FM-200206947 02 1/30/06 1st floor/Auditorium: 1. Asbestos assessment required. Door knob on door has broken off, needs to be replaced. Asbestos Code A - Clear for repairs on 05/02/02. DCPS Safety - Ronald Edwards (RG 05/03/02) May 1, 2002 January 30, 2006 1,370 days
FM-200457950 04 1/30/06 Stuart-Hopson Boile room Replace safety valves on boilers # 2 & 3 November 5, 2004 January 30, 2006 451 days
FM-200514138 /05 1/30/06 (Stuart-Hobson) "Urgent" Ground floor,Kitchen Replace themocouple on deep fryer October 22, 2005 January 30, 2006 100 days

Routine Repair Requests Completed in January 2006 (27)
Description Open Date Close Date Time Elapsed
FM-200512635 05 1/19/06 Stuart-Hobson First Floor-Room 107 Health Suite Replace toilet in health suite toilet was taken out and never replaced September 15, 2005 January 19, 2006 126 days
FM-200617696 06 1/23/06 Emergency Main waste line for urinals busted on the third floor down to the first floor and into the custodian storage room. January 23, 2006 January 23, 2006 0 days
FM-200514557 /05 1/26/06 Stuart-Hobson Play grounds Area Remove Graffiitti October 24, 2005 January 26, 2006 94 days
FM-200511251 05 1/26/06 Stuart-Hobson Fire Code Violation All-Exit doors not closing properly-throughout Asbestos Code A - Clear for repairs on 08/26/05. Tidewater - Carlos Vera (RG 08/30/05) SEE ASSESSMENTS August 25, 2005 January 26, 2006 154 days
FM-200333220 03 1/30/06 Stuart-Hobson First floor Auditorium A/C unit in auditorium is leaking down on rear entrance of cafeteria. Furnish and install drainage to devert water. July 14, 2003 January 30, 2006 931 days
FM-200220622 /02 1/30/06 Stuart-Hobson Boiler Room Repair or replace 1" coupling and line to circulating pump. November 12, 2002 January 30, 2006 1,175 days
FM-200220621 /02 1/30/06 Stuart-Hobson Boiler Room Asbestos assessment required Repair steam leak in Boiler Room ceiling. Steam lines approx. 3/4".Steam lines in ceiling behind boiler #3. Asbestos Code A-clear for repair by Horne Engineer Philip Connolly on 11/13/02 DCPS Charles E Buchanan November 12, 2002 January 30, 2006 1,175 days
FM-200202919 02 1/30/06 (STUART-HOBSON) 1ST FLOOR/ ROOM 105, 106, 107, 108, 112, 114, 303, 304, 307 ROOM 10, TEACHERS LOUNGE (1) SURVEY ELECTRICAL CAPACITY TO DETERMINE WHETHER THE INSTALLATION OF A NEW WINDOW UNIT WILL HANDLE THE LOAD. (2) INSTALL NEW WINDOW A/C UNIT. February 12, 2002 January 30, 2006 1,448 days
FM-200127182 02 1/30/06 STUART-HOBSON BOILER ROOM REPAIR/REPLACE ALL LIGHT FIXTURES IN BOILER ROOM. INSTALL SECURITY LIGHTING OUTSIDE OF BOILER ROOM ENTRANCE. Requester Phone: 698-1750 January 3, 2002 January 30, 2006 1,488 days
FM-200123825 /01 1/30/06 STUART-HOBSON BOILER ROOM REPAIR OR REPLACE MCDONNELL & MILLER LOW WATER CUT OUT ON #3 BOILER. November 27, 2001 January 30, 2006 1,525 days
FM-200122020 /01 1/30/06 (STUART-HOBSON) BASEMENT, 1ST, 2ND, AND 3RD FLOORS REPAIR PUSH BUTTON WATER COOLERS ON THE FLOORS LOCATED ABOVE. BUTTONS GET STUCK CAUSING FLOODS. October 19, 2001 January 30, 2006 1,564 days
FM-200114955 01 1/30/06 STUART-HOBSON FIRST FLOOR MAIN LOBBY 1) DOOR KNOB ON MAIN ENTRANCE TO BUILDING ON LEFT HAND SIDE JUST TURNS AND TURNS AROUND ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/27/01. HORNE ENG. - EDWARD RODRIGEZ (RG) July 9, 2001 January 30, 2006 1,666 days
FM-200111124 01 1/30/06 STUART-HOBSON FIFTH AND F STREETS SIDE OF PLAYGROUND 1) EXPOSED WIRES AT BOTTOM OF STREET LIGHT 2) TIGHTEN COVER May 25, 2001 January 30, 2006 1,711 days
FM-200513250 05 1/30/06 Stuart-Hobson Change locks in the following Areas: Third Floor-Rm. 310 Basement Floor-Rm. VMJ Library September 28, 2005 January 30, 2006 124 days
FM-200512030 05 1/30/06 Stuart-Hobson Boiler Room Boiler #1,#2 and #3 Reconnect city water make up line. September 8, 2005 January 30, 2006 144 days
FM-200512029 05 1/30/06 Stuart-Hobson Boiler Room Boiler #1,#2 and #3 Reinstall feedwater regulators. September 8, 2005 January 30, 2006 144 days
FM-200512028 05 1/30/06 Stuart-Hobson Boiler Room Boiler #1 retube and hydrostatic test required September 8, 2005 January 30, 2006 144 days
FM-200511958 05 1/30/06 Stuart-Hobson Boiler Room Boiler #3 Recalibrated burner September 7, 2005 January 30, 2006 145 days
FM-200504784 05 1/30/06 Stuart-Hobson Roof Top Install antennas on Roof Top... 1) Install (6) panel antennas inside stealth chimneys on existing building. 2) Provide unmanned equipment room at ground level. 3) Submeter electrical service from existing building service. 4) Provide telco service to equipment room from existing demarcation point. 5) Run antenna signal and ground cables. Drawings are in Service Center... April 27, 2005 January 30, 2006 278 days
FM-200501585 05 1/30/06 Stuart Hobson Boiler Room Replace 3" quick opening valve and slow opening valve for boiler #3. February 11, 2005 January 30, 2006 353 days
FM-200501584 05 1/30/06 Stuart Hobson Boiler Room Replace rupture 1 1/2" drain line from surface blow down line to 3"X 1 1/2" Y Joint Boiler #3. February 11, 2005 January 30, 2006 353 days
FM-200500187 05 1/30/06 STUART-HOBSON boiler room Boiler # 1 replace leaking tube January 6, 2005 January 30, 2006 389 days
FM-200457372 /04 1/30/06 Stuart-Hobson Boiler Room Boiler #3 repair burner, boiler will not come on. October 25, 2004 January 30, 2006 462 days
FM-200453248 04 1/30/06 Stuart-Hobson Boiler Room Replace manhole ring on Boiler #2. August 24, 2004 January 30, 2006 524 days
FM-200340777 /03 1/30/06 Stuart-Hobson Boiler Room Boiler #2 replace leaking tubes. November 26, 2003 January 30, 2006 796 days
FM-200340225 /03 1/30/06 Stuart- Hobson Boiler Room Furnish materials to repair heating equipment. Honeywell mod motor: M917 4C 1025; V-120; Cy 60. November 13, 2003 January 30, 2006 809 days
FM-200340122 /03 1/30/06 Stuart-Hobson Boiler room Repair #1 burner , will not start. November 10, 2003 January 30, 2006 812 days