Closed Repair Requests: October 2003

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

October 2003 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    5
    Average Time Elapsed: 55.2 Days
  • Total Requests
    5

Detailed Reports

Routine Repair Requests Completed in October 2003 (5)
Description Open Date Close Date Time Elapsed
FM-200334728 03 10/3/03 Stuart-Hobson Boiler Room Repair busted water leg on Boiler #2 left side. August 8, 2003 October 3, 2003 56 days
FM-200335306 03 10/8/03 Stuart-Hobson F-343.5 FIRE CODE VIOLATION Basement Cafeteria door defective. Asbestos Code A - Clear for repairs on 09/12/03. Horne Engineering - Troy Wilcome (RG 09/16/03) August 14, 2003 October 8, 2003 55 days
FM-200335301 03 10/8/03 Stuart-Hobson F-343.5 FIRE CODE VIOLATION First floor Room 102 door defective. Asbestos Code A - Clear for repairs on 09/12/03. Horne Engineering - Troy Wilcome (RG 09/16/03) August 14, 2003 October 8, 2003 55 days
FM-200335299 03 10/8/03 Stuart-Hobson F-343.5 FIRE CODE VIOLATION Third floor Room 305 door defective. Asbestos Code A - Clear for repairs on 09/12/03. Horne Engineering - Troy Wilcome (RG 09/16/03) August 14, 2003 October 8, 2003 55 days
FM-200335296 03 10/8/03 Stuart-Hobson F-343.5 FIRE CODE VIOLATION Second floor Room 202 door defective. Asbestos Code A - Clear for repairs on 09/12/03. Horne Engineering - Troy Wilcome (RG 09/16/03) August 14, 2003 October 8, 2003 55 days