Closed Repair Requests: February 2006

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

February 2006 Summary

  • Urgent Requests
    5
    Average Time Elapsed: 641.8 Days
  • Routine Requests
    18
    Average Time Elapsed: 646.2 Days
  • Total Requests
    23

Detailed Reports

Urgent Repair Requests Completed in February 2006 (5)
Description Open Date Close Date Time Elapsed
FM-200124694 /01 2/3/06 STUART-HOBSON BOILER ROOM STEPS 1. ASBESTOS ASSESSMENT REQUIRED. REPLACE HANDRAILING ONSTEPS LEADING TO BOILER ROOM AND REPAIR OR REPLACE METAL LANDING. (SAFETY HAZARD). Requester Phone: 698-1750 Requestor Phone: 698-1750 Asbestos Code A - Cleared for repairs on 04-21-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. November 21, 2001 February 3, 2006 1,535 days
FM-200447064 04 2/7/06 Stuart-Hobson Third floor room 305 Bottom of door get stuck when you try to close to lock it. ?This is considerate a fire code violation. Code A- clear for repairs as of 4/28/04 Sylvia Grimes safety . April 23, 2004 February 7, 2006 655 days
FM-200515904 /05 2/7/06 Repair ceiling and falling plaster over top of the food service line in the cafeteria on the ground floor. Asbestos Code A - Clear for repairs on 11/30/05. DCPS Safety - Richard Gibson (RG) November 30, 2005 February 7, 2006 69 days
FM-200512542 05 2/7/06 Stuart-Hobson Ground 4th St. side of bldg. Fence has been pulled away from support post, and is creating a safety hazard for the students. September 14, 2005 February 7, 2006 146 days
FM-200340763 /03 2/7/06 stuart-Hobson Boys Gym Repair or replace 3/4" leaking steam line at entrance to boy gym. Code A - clear for exploratory if ACM is impact stop work and send back to the safety office 12/4/03 Sylvia Grimes. November 26, 2003 February 7, 2006 804 days

Routine Repair Requests Completed in February 2006 (18)
Description Open Date Close Date Time Elapsed
FM-200115856 01 2/3/06 STUART-HOBSON 3RD FLOOR - HALLWAY BY ROOM 308 & OVER TOP OF STORAGE ROOM ASBESTOS ASSESSMENT REQUIRED CORNER OF CEILING PLASTER IS FALL DOWN ON THE HALLWAY & OVER TOP OF STORAGE ROOM. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/14/01. HORNE ENGINEERING - BIPIN NANAVATY July 25, 2001 February 3, 2006 1,654 days
FM-200127124 02 2/3/06 (STUART-HOBSON) ASBESTOS ASSESSMENT REQ. 3RD FLOOR/ ROOM 300 TOP OF CEILING HAS A BIG WHOLE IN IT & PLASTER IS FALLING FROM THE CEILING. THIS NEEDS IMMEDIATE ATTENTION, AS THE PLASTER CAN FALL ON HEADS OF THE STUDENTS AND TEACHERS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 01/10/02. HORNE ENGINEERING - RAYMOND AGNANT (RG) DO NO SCRAPE CHIP OR PEEL ANY OF THIS PAINT SURFACE RE-PAINT OVER ONLY. CLEARED CODE A-CLEAR FOR REPAIR ON 2/06/02 BY HORNE ENGINEER: ROY AGNANT January 9, 2002 February 3, 2006 1,486 days
FM-200116204 01 2/3/06 STUART-HOBSON 1ST FLOOR - BOYS BATHROOM ASBESTOS ASSESSMENT REQUIRED TAP OF CEILING TO RIGHT OF CORNER, PLASTER IS FALLING OVER TOP OF COMMODE. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/28/01. HORNE ENG. - EDWARD RODRIGEZ (RG) July 30, 2001 February 3, 2006 1,649 days
FM-200504065 05 2/7/06 (Stuart-Hobson) !!!EMERGENCY!!! Basement/Cafeteria: Repair or replace panic bar on entry door, leading from playground to the cafeteria. April 14, 2005 February 7, 2006 299 days
FM-200501183 05 2/7/06 Stuart-Hobson Front Hallway - East exit Repair radiator, leaking from rupture 1/2" line to the trap. February 3, 2005 February 7, 2006 369 days
FM-200456086 04 2/7/06 Stuart-Hobson Third floor girls restroom 3 Commodes are out of order. Need attention, Students have to use the restroom. September 29, 2004 February 7, 2006 496 days
FM-200510872 05 2/7/06 Stuart-Hobson Replace ceiling tile in cafeteria Asbestos Code A - Clear for repairs on 08/23/05. Tidewater - Henry Addison (RG 08/24/05) August 22, 2005 February 7, 2006 169 days
FM-200445777 04 2/7/06 Stuart- Hobson 1st Floor Repair steam trap on radiator on 1st floor, can not be isolated. March 24, 2004 February 7, 2006 685 days
FM-200445486 04 2/7/06 Stuart-Hobson Basement cafeteria/kitchen Water coming out under the water heater tank. Also water heater tank do not get hot. This need immediate attention, because cafeteria workers need hot water at all times. March 17, 2004 February 7, 2006 692 days
FM-200442643 04 2/7/06 Stuart-Hobson First floor hallways Paint the halls and hang display boards in the halls. This will be completed by volunteers. We would like this to happen on Jan. (17-19). Lead & Asbestos Code A - Clear for repairs on 01/13/04. Horne Engineering - Edward Rodriguez (RG 01/14/04) January 13, 2004 February 7, 2006 756 days
FM-200341322 03 2/7/06 Stuart-Hobson Basement girls gyn office, hall and lockerroom Repair radiator on return side in the above areas for heat. December 9, 2003 February 7, 2006 791 days
FM-200511257 05 2/7/06 Stuart-Hobson Fire Code Violation Second Floor-Cover plate missing room 210 August 25, 2005 February 7, 2006 166 days
FM-200338414 03 2/7/06 Stuart-Hobson Second floor Water fountain constantly runs all the time, custodian tried to cut it off. This need immediate attention due to the fountain can over flow. April 15, 2004: Staff called in today to report the fountain is over-flowing, and flooding the floors. October 2, 2003 February 7, 2006 859 days
FM-200337121 03 2/7/06 Stuart-Hobson First floor main office Door does not close all the way and hinge is bent. This needs immediate attention. Asbestos Code A - Clear for repairs on 09/10/03. Horne Engineering - Edward Rodriguez (RG 09/11/03) September 9, 2003 February 7, 2006 882 days
FM-200517116 06 2/7/06 Cafeteria Rear Exit door Install a slide-bolt lock on the door. Asbestos Code A - Clear for repairs on 01/05/06. Tidewater - Thomas Johnson - (RG 01/06/06) January 4, 2006 February 7, 2006 34 days
FM-200511261 05 2/7/06 Stuart-Hobson Fire Code Violation Basement-door closer broken-basement Asbestos Code A - Clear for repairs on 08/26/05. Tidewater - Carlos Vera (RG 08/30/05) SEE ASSESSMENTS August 25, 2005 February 7, 2006 166 days
FM-200506914 05 2/7/06 (STUART-HOBSON) Ms. Allen Classroom 1) The School wants to install dry eraser boards in Ms. Allen's classroom where exisiting chalkboards are. Verify that old chalkboards do not contain any asbestos material. Asbestos Code A - Clear for repairs on 07/08/05. Tidewater - Philp Connolly (RG 07/26/05) June 13, 2005 February 7, 2006 239 days
FM-200506701 05 2/7/06 (STUART- HOBSON) Repair or Replace water coolers throughout building. (Water cooler project summer school) June 13, 2005 February 7, 2006 239 days