Closed Repair Requests: February 2007

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

February 2007 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 99 Days
  • Routine Requests
    4
    Average Time Elapsed: 74.8 Days
  • Total Requests
    5

Detailed Reports

Urgent Repair Requests Completed in February 2007 (1)
Description Open Date Close Date Time Elapsed
FM-200632268 /06 2/20/07 Repair boiler #3 off on flame failure. No heat in building. Urgent !!!!!! November 13, 2006 February 20, 2007 99 days

Routine Repair Requests Completed in February 2007 (4)
Description Open Date Close Date Time Elapsed
FM-200629042 06 2/13/07 3rd Floor/Holes in ceiling from leaking ceiling. Asbestos Code A - Clear for repairs on 09/12/06. Tidewater - Kenny Belton (RG 09/15/06) September 11, 2006 February 13, 2007 155 days
FM-200634313 07 2/20/07 Second floor, Room 200. Repair or replace malfunctioning lock, something appears to be stuck in the lock. Note: The teacher & students are locked out of this classroom and are unable to gain access to retrieve their personables. January 24, 2007 February 20, 2007 27 days
FM-200632169 /06 2/20/07 Boiler Room - Repair burner on boiler #3 November 14, 2006 February 20, 2007 98 days
FM-200700317 07 2/26/07 Second Floor - Room 201(computer lab) - No power from outlets February 7, 2007 February 26, 2007 19 days