March 2002 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 84 Days
  • Routine Requests
    8
    Average Time Elapsed: 204.8 Days
  • Total Requests
    9

Detailed Reports

Urgent Repair Requests Completed in March 2002 (1)
Description Open Date Close Date Time Elapsed
FM-200125684 /01 3/12/02 (STUART-HOBSON) ASBESTOS ASSESSMENT REQUIRED THIRD FLOOR GIRLS BATHROOM FLUSH VALVE ON COMMODE IS LEAKING IN GIRLS BATHROOM (TRIED TO CUT IT OFF, BUT IT IS AN OLD ONE). NEED IMMEDIATE ATTENTION DUE TO IT LEAKING DOWN INTO THE 2ND FLOOR GIRLS BATHROOM CEILING. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 02/27/02. DCPS- SAFETY RONALD EDWARDS (202)576-6693 (RG 03/0102) December 18, 2001 March 12, 2002 84 days

Routine Repair Requests Completed in March 2002 (8)
Description Open Date Close Date Time Elapsed
FM-200204197 02 3/13/02 Stuart-Hobson Boiler Room Repair #3 burner, burner cuts off on flaime failure. March 11, 2002 March 13, 2002 2 days
FM-200114603 01 3/19/02 STUART-HOBSON ROOM #200 (1) SURVEY ELECTRICAL CAPACITY TO DETERMINE WHETHER THE INSTALLATION OF A NEW WINDOW UNIT WILL HANDLE THE LOAD. (2) INSTALL ONE (1) NEW 25,000 BTU AIR CONDITIONING UNIT. July 2, 2001 March 19, 2002 260 days
FM-200114601 01 3/19/02 STUART-HOBSON ROOM #204 (1) SURVEY ELECTRICAL CAPACITY TO DETERMINE WHETHER THE INSTALLATION OF A NEW WINDOW UNIT WILL HANDLE THE LOAD. (2) INSTALL ONE (1) NEW 25,000 BTU AIR CONDITIONING UNIT. July 2, 2001 March 19, 2002 260 days
FM-200114600 01 3/19/02 STUART-HOBSON ROOM #205 (1) SURVEY ELECTRICAL CAPACITY TO DETERMINE WHETHER THE INSTALLATION OF A NEW WINDOW UNIT WILL HANDLE THE LOAD. (2) INSTALL ONE (1) NEW 25,000 BTU AIR CONDITIONING UNIT. July 2, 2001 March 19, 2002 260 days
FM-200114599 01 3/19/02 STUART-HOBSON ROOM #207 (1) SURVEY ELECTRICAL CAPACITY TO DETERMINE WHETHER THE INSTALLATION OF A NEW WINDOW UNIT WILL HANDLE THE LOAD. (2) INSTALL ONE (1) NEW 25,000 BTU AIR CONDITIONING UNIT. July 2, 2001 March 19, 2002 260 days
FM-200114597 01 3/19/02 STUART HOBSON ROOM #201 (1) SURVEY ELECTRICAL CAPACITY TO DETERMINE WHETHER THE INSTALLATION OF A NEW WINDOW UNIT WILL HANDLE THE LOAD. (2) INSTALL ONE (1) 28,000 BTU AIR CONDITIONING UNIT. July 2, 2001 March 19, 2002 260 days
FM-200114604 01 3/19/02 STUART-HOBSON TEACHERS LOUNGE (1) SURVEY ELECTRICAL CAPACITY TO DETERMINE WHETHER THE INSTALLATION OF A NEW WINDOW UNIT WILL HANDLE THE LOAD. (2) INSTALL ONE (1) NEW 25,000 BTU AIR CONDITIONING UNIT. July 2, 2001 March 19, 2002 260 days
FM-200126631 02 3/20/02 STUART-HOBSON BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR LEAKING 3" RETURN LINE AT CONDENSATION TANK. ADBESTOS CODE A - CLEAR FOR REPAIRS ON 01/04/02. HORNE ENGINEERING - PHILP CONNOLLY January 3, 2002 March 20, 2002 76 days