Closed Repair Requests: March 2003
See Also: All Closed Repair Requests at Stuart-Hobson Middle School
March 2003 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200226682 03 3/13/03 Stuart-Hobsob First floor main office lavatory Hot waterside of sink will not cut off. No cut off valve operational. Safety hazard | |||
| FM-200225325 03 3/24/03 Stuart-Hobson First floor annex hall Exit door has one working hinge holding door up. Door almost fell on an student. This is considered an fire code violation and safety. | |||
| FM-200222481 /02 3/26/03 Stuart-Hobsos Boiler room URGENT Asbestos assessment may be required. Replace 4" stop valve ont the domestic hot water storage tank line, so contractor can replace new temerture regulator valve. Asbestos Code A - Clear For Repairs On 12/13/02. Horne Engineering - Roger Kager (RG 12/13/02) | |||
| FM-200224186 03 3/26/03 Stuart-Hobson Boiler Room Replace low water cut out on Boiler #1 URGENT!!!!! |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200100876 1/11/01 3/17/03 STUART-HOBSON BOILER ROOM REPAIR OR REPLACE BURNED OUT VACUUM PUMP MOTOR. RETRAP ENTIRE BUILDING. | |||
| FM-200100881 1/11/01 3/17/03 STUART-HOBSON BOILER ROOM REPLACE 2 MOTORS ON RETURN PUMPS. (MAGNELEK JET PUMP DUTY). BOTH MOTORS ARE BURNED OUT. HC020000918 | |||
| FM-200211142 02 3/19/03 Stuart-Hobson 1. Asbestos Assessment and paint assessment Reqd. Building Exterior in Area Outside the Auditorium 2. Mortar between bricks has deteriorated and fallen away causing bricks to fall and water seepage into the auditorium, over and under the window. The water seepage is causing the plaster in the auditorium to fall and crumble---can not hang curtain replacements. The outside bricks need pointing up POC: Linda Magazine, BSM 202 439-7844 Code A-clear for repair by Horne Engineer ( Bipin Nanavaty) on 7/15/02 Charles E. Buchanan DPCS | |||
| FM-200217478 02 3/19/03 Stuart-Hobson Building Exterior/Outside of the Auditorium 1. Exterior masonry [pointing up brickwork] needs to be done; and 2. Interior plastering & paint following the completion of the exterior work. [Asbestos assessment reqd. for interior work.] | |||
| FM-200124171 /01 3/20/03 STUART HOBSON BOILER MAINTENANCE 1) BOILER WATER TREATMENT SERVICES TRICON OF WASHINGTON INC. POC: THOMAS PICKETT - 698-1750 | |||
| FM-200221357 /02 3/26/03 Stuart-Hobson Boiler room Asbestos assessment required Repair or replace leaking water leg inside of the fire box of # 2 boiler,(view from front back right side. only one of (3) boiler are operational. Asbestos Code A - Clear for repairs on 11/20/02. Horne Engineering - Sharon Voss (RG 11/21/02) | |||
| FM-200205479 02 3/26/03 Stuart-Hobson Repair burner #3. Burner goes off on flame failure. | |||
| FM-200220618 /02 3/26/03 Stuart-Hobson Boiler Room Repair steam leaks in tunnel on westside and eastside of building. Size of line 3/4" and 4" nipple. Asbestos Code A - Clear for repairs on 12/12/02. Horne Engineering - Sharon Voss (RG 12/13/02) | |||
| FM-200223373 /02 3/26/03 Stuart-Hobson Boiler Room Repair or replace 3" return lines leaking on floor. No insulation on line. |