Closed Repair Requests: April 2002

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

April 2002 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    5
    Average Time Elapsed: 116.8 Days
  • Total Requests
    5

Detailed Reports

Routine Repair Requests Completed in April 2002 (5)
Description Open Date Close Date Time Elapsed
FM-200203116 02 4/11/02 STUART-HOBSON Boiler room Repair leak from boys toilet in boys locker room. Emergency health hazard. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/21/02 HORNE ENGINEER:PHILIP CONNOLLY February 19, 2002 April 11, 2002 51 days
FM-200206681 02 4/26/02 Stuart-Hopson Boiler room Repair or replace sump pump in boiler room. April 26, 2002 April 26, 2002 0 days
FM-200206683 02 4/29/02 Stuart-Hopson Boiler room Repair Lochinvar domestic hot water heater. Heater will not start. April 26, 2002 April 29, 2002 3 days
FM-200121403 /01 4/29/02 (STUART-HOBSON) ASBESTOS ASSESSMENT REQ. BASEMENT/ CAFETERIA COURT YARD SPECIAL PROJECT FOR TO PAINT BRICK ON WALL IN COURT YARD. NEED A WORK PERMIT FOR PAINTING WALL. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/14/01. HORNE ENGINEERING - BIPIN NANAVATY October 11, 2001 April 29, 2002 200 days
FM-200112115 01 4/30/02 STUART-HOBSON 1) REPLACE (0) STAINED CEILING TILE (2X4) REPLACE (0) MISSING OR BROKEN (2X4) 2) REPLACE (0) STAINED CEILING TILE (12X12) REPLACE (23) MISSING OR BROKEN (12X12) 3) REPAIR OR REPLACE LIGHT FIXTURES AS NEEDED. (CEILING TILE REPLACEMENT PROJECT) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/18/01 June 4, 2001 April 30, 2002 330 days