Closed Repair Requests: April 2002
See Also: All Closed Repair Requests at Stuart-Hobson Middle School
April 2002 Summary
- Urgent Requests
0Average Time Elapsed: 0 Days - Routine Requests
5Average Time Elapsed: 116.8 Days - Total Requests
5
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200203116 02 4/11/02 STUART-HOBSON Boiler room Repair leak from boys toilet in boys locker room. Emergency health hazard. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/21/02 HORNE ENGINEER:PHILIP CONNOLLY | |||
| FM-200206681 02 4/26/02 Stuart-Hopson Boiler room Repair or replace sump pump in boiler room. | |||
| FM-200206683 02 4/29/02 Stuart-Hopson Boiler room Repair Lochinvar domestic hot water heater. Heater will not start. | |||
| FM-200121403 /01 4/29/02 (STUART-HOBSON) ASBESTOS ASSESSMENT REQ. BASEMENT/ CAFETERIA COURT YARD SPECIAL PROJECT FOR TO PAINT BRICK ON WALL IN COURT YARD. NEED A WORK PERMIT FOR PAINTING WALL. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 11/14/01. HORNE ENGINEERING - BIPIN NANAVATY | |||
| FM-200112115 01 4/30/02 STUART-HOBSON 1) REPLACE (0) STAINED CEILING TILE (2X4) REPLACE (0) MISSING OR BROKEN (2X4) 2) REPLACE (0) STAINED CEILING TILE (12X12) REPLACE (23) MISSING OR BROKEN (12X12) 3) REPAIR OR REPLACE LIGHT FIXTURES AS NEEDED. (CEILING TILE REPLACEMENT PROJECT) ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/18/01 |