Closed Repair Requests: April 2003

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

April 2003 Summary

  • Urgent Requests
    3
    Average Time Elapsed: 2.7 Days
  • Routine Requests
    2
    Average Time Elapsed: 3.5 Days
  • Total Requests
    5

Detailed Reports

Urgent Repair Requests Completed in April 2003 (3)
Description Open Date Close Date Time Elapsed
FM-200228828 03 4/17/03 Stuart-Hobsob First floor -room 106 Window has come out the frame and could not get it back in. This a considered an safety hazard. April 16, 2003 April 17, 2003 1 day
FM-200228827 03 4/17/03 Stuart-Hobsob Basement - VMJ Center Window fell down from the top and when custodian try to put the window back up it fell back down an the pane broke up in it. This is considered an safety hazard and needs immediate attention. April 16, 2003 April 17, 2003 1 day
FM-200228829 03 4/22/03 Stuart-Hobson Basement cafeteria Door going out to playground, needs door plate at the bottom, bolted down, because one screw is holding it in place. This is an safety code for students and staff. April 16, 2003 April 22, 2003 6 days

Routine Repair Requests Completed in April 2003 (2)
Description Open Date Close Date Time Elapsed
FM-200228821 03 4/16/03 Stuart Hobson School Replace backboard and rims. April 16, 2003 April 16, 2003 0 days
FM-200228601 03 4/17/03 (Terrell, R.H.) Playground: Weld plates to back boards and rings. April 10, 2003 April 17, 2003 7 days

© The Washington Post Company