Closed Repair Requests: April 2004

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

April 2004 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 89 Days
  • Routine Requests
    1
    Average Time Elapsed: 3 Days
  • Total Requests
    2

Detailed Reports

Urgent Repair Requests Completed in April 2004 (1)
Description Open Date Close Date Time Elapsed
FM-200443187 04 4/21/04 (Stuart-Hobson) !!!URGENT!!! 3rd Floor/Boys Bathroom: Repair cut-off valves are broken under the sink. Students are unable to wash their hands; please respond as soon as possible. January 23, 2004 April 21, 2004 89 days

Routine Repair Requests Completed in April 2004 (1)
Description Open Date Close Date Time Elapsed
FM-200447062 04 4/26/04 Stuart-Hobson Second floor room 207, 301 and 302 Lock on door is broken, it need to be replace. This need immediate attention, Due to room need to be lock to keep students out of room. April 23, 2004 April 26, 2004 3 days

© The Washington Post Company