Closed Repair Requests: May 2002

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

May 2002 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    4
    Average Time Elapsed: 133.5 Days
  • Total Requests
    4

Detailed Reports

Routine Repair Requests Completed in May 2002 (4)
Description Open Date Close Date Time Elapsed
FM-200116205 01 5/3/02 STUART-HOBSON TEACHERS LOUNGE - 1ST FLOOR ASBESTOS ASSESSMENT REQUIRED FAUCET ON SINK IS CONSISTLY RUNNING. HAD TO CUT IT OFF SO SINK WOULD NOT OVER FLOW. ALSO SINK IS STOPPED UP. ASBESTOS CODE CLEAR FOR REPAIR ON 9/06/01. HORNE ENG. DONALD MAGLENTI July 30, 2001 May 3, 2002 277 days
FM-200204165 02 5/10/02 (Stuart-Hobson) Asbestos Assessment Required 1st Floor Auditorium Repair or replace auditorium seats which are falling apart. Asbestos Code A - Clear For Repairs On 03/11/02. Horne Engineering - Stephen Caldwell (RG 03/12/02) March 11, 2002 May 10, 2002 60 days
FM-200123922 /01 5/16/02 STUART-HOBSON TUNNELS 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR ALL STEAM LEAKS IN TUNNELS, SIZES 2" NIPPLE & 3/4" NIPPLE ON CUT OFF VALVES. THERE IS INSULATION ON PIPES. ASBESTOS CODE A-CLEAR FOR REPAIR ON11/28/01 BY HORNE ENGINEER : STEPHEN CALDWELL November 28, 2001 May 16, 2002 169 days
FM-200206667 02 5/23/02 Stuart-Hobson !!! Emergency !!! First (1st) Floor - Boys Restroom Urinals is flooding and the water is running down thru the ceiling in the Custodical Office. Cannot shut the valves off. April 25, 2002 May 23, 2002 28 days