Closed Repair Requests: May 2006

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

May 2006 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    7
    Average Time Elapsed: 107.3 Days
  • Total Requests
    7

Detailed Reports

Routine Repair Requests Completed in May 2006 (7)
Description Open Date Close Date Time Elapsed
FM-200620101 06 5/2/06 Playground Area. Weld backboard and rim together on basketball goals. March 20, 2006 May 2, 2006 43 days
FM-200507165 05 5/3/06 Stuart Hobson Room #206 Replace existing window air conditioning unit in room # 206 compressor will not engage. Existing unit is 15amp 230v. Replace existing electrical outlet with 20amp outlet and install 25,000btu a/c unit. June 24, 2005 May 3, 2006 313 days
FM-200512032 05 5/15/06 Stuart-Hobson Boiler Room Boiler #1 and #2 Weld threaded studs to breech inspection panel door. September 8, 2005 May 15, 2006 249 days
FM-200621983 06 5/16/06 Playground Area. Repair or Replace playground equipment. May 1, 2006 May 16, 2006 15 days
FM-200622781 06 5/22/06 2nd Floor- Boys Bathroom The ceiling is leaking, coming from the 3rd Floor bathroom around trap. May 16, 2006 May 22, 2006 6 days
FM-200622897 06 5/22/06 3rd Floor- Boy's Bathroom The urinals are leaking around the trap. May 17, 2006 May 22, 2006 5 days
FM-200618060 06 5/31/06 Stuart-Hobson 2nd Floor Hallway Repair steam line leaking on hallway radiator on 2nd floor. Control valve has been shut off. This is on the Annex side of Building. Need immediate attention !!!!! January 31, 2006 May 31, 2006 120 days

© The Washington Post Company