Closed Repair Requests: June 2003
See Also: All Closed Repair Requests at Stuart-Hobson Middle School
June 2003 Summary
- Urgent Requests
0Average Time Elapsed: 0 Days - Routine Requests
2Average Time Elapsed: 141.5 Days - Total Requests
2
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200217637 02 6/9/03 Stuart-Hobson Asbestos Assessment Reqd. 1st FLoor Room 116 Tile has come up from the floor due to a leak. Asbesstos Code A-clear for repair by Horne Engineer Philip Connolly DCPS Charles E. Buchanan on 9/24/02 | |||
| FM-200331295 03 6/23/03 Stuart Hobson Emergency !!! Third Floor, Second Floor, First Floor and Basement 1) Leaking down from the third floor bathroom. All the urnials are stopped up, can not use any of the boys bathrooms. Leak has flooded the storage room in the basement. When the toilet is flushed in the Boys Gym the water goes into the Boiler Room. Asbestos Code A - Clear for repairs on 06/05/03. Horne Engineering - Bipin Nanavaty (RG 06/05/03) |