Closed Repair Requests: July 2003

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

July 2003 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 369.5 Days
  • Routine Requests
    3
    Average Time Elapsed: 353 Days
  • Total Requests
    5

Detailed Reports

Urgent Repair Requests Completed in July 2003 (2)
Description Open Date Close Date Time Elapsed
FM-200217668 02 7/29/03 Stuart-Hobson ****Urgent**** Basement VMJ Center 1. The wall light switch has a short in it. The computer room needs a well-lit area; and 2. Floor oujtlet needs to be replaced because fire came out of the plug when a teacher tried to use it---also tripped the breaker to the "off" position. September 17, 2002 July 29, 2003 315 days
FM-200208747 02 7/29/03 Stuart-Hobson Third (3rd) Floor - Classroom #212 Wall outlets are not working on one side of the room. When teacher put plug in outlet fire came out! This considered on Emergency situations. Safety Hazard. \\ Asbestos Code A - Clear for repairs on 05/05/03. Horne Engineering - Philp Connolly (RG 05/07/03) May 31, 2002 July 29, 2003 424 days

Routine Repair Requests Completed in July 2003 (3)
Description Open Date Close Date Time Elapsed
FM-200217641 02 7/8/03 Stuart-Hobson Asbestos Assessment Reqd. 2nd FLoor Room 216 Need four (4) new electrical outlets installed on the wall of classroom 216 where they were using an extension cords as permanent wiring [recently cited as a fire-code violation]. Asbestos/Lead Code A-clear for repair by Horne Engineer [ Philip Connolly ] on 9/25/02 DCPS Charles E. Buchanan September 17, 2002 July 8, 2003 294 days
FM-200114598 01 7/8/03 STUART-HOBSON AUDITORIUM, ROOM 201, 200, 207, 205, 204, AND TEACHERS LOUNGE 1) INSTALL DEDICATED LINES FOR ELECTRICAL OUTLETS FOR A/C UNITS IN AUDITORIUM (4), TEACHERS LOUNGE, AND REMAINING AREAS (1).ASBESTOS CODE A - CLEAR FOR REPAIRS ON 09/19/01. HORNE ENGINEER BILL CAMPION July 2, 2001 July 8, 2003 736 days
FM-200332734 03 7/29/03 Stuart -Hobson !! Emergency !! Basement & First Floor 1. Repair light in the boy shower room / light in no.#3 stairwell on the 1st flr. Note : lights are very loose and need immediate attention . June 30, 2003 July 29, 2003 29 days