Closed Repair Requests: August 2001

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

August 2001 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    2
    Average Time Elapsed: 89.5 Days
  • Total Requests
    2

Detailed Reports

Routine Repair Requests Completed in August 2001 (2)
Description Open Date Close Date Time Elapsed
FM-200115162 01 8/23/01 STUART-HOBSON BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR CRACKED SHELL IN #2 BOILER. CODE A-CLEAR FOR REPAER BY HORNE ENG 8/8/01 July 12, 2001 August 23, 2001 42 days
FM-200107810 01 8/24/01 STUART-HOBSON STAIR TREADS. 1) CORRIDOR IN BASEMENT BY CAFETERIA, 2ND AND 3RD FLOOR CORRIDORS, AND ALL STAIRWELLS. # HRGM CORP. POC: JOHN RIGLEY-202-253-8370 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/23/01. April 9, 2001 August 24, 2001 137 days