Closed Repair Requests: August 2002

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

August 2002 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 217 Days
  • Routine Requests
    3
    Average Time Elapsed: 297 Days
  • Total Requests
    4

Detailed Reports

Urgent Repair Requests Completed in August 2002 (1)
Description Open Date Close Date Time Elapsed
FM-200201093 02 8/20/02 (STUART-HOBSON) ASBESTOS ASSESSMENT REQUIRED REPAIR FAUCET ON THREE-COMPARTMENT SINK (WATER IS LEAKING). ASBESTOS CODE - A - CLEAR FOR REPAIRS ON 01/28/02 RICHARD GIBSON - SAFETY (202)576-5584 (RG)-01/28/02 January 15, 2002 August 20, 2002 217 days

Routine Repair Requests Completed in August 2002 (3)
Description Open Date Close Date Time Elapsed
FM-200202789 02 8/12/02 Stuart-Hobson Boiler room 1. Asbestos assessment required. 2. Repair or replace leaking water leg on #2 boiler. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/14/02 HORNE ENGINEER:BIPIN NANAVATY February 11, 2002 August 12, 2002 182 days
FM-200100886 1/11/01 8/19/02 STUART-HOBSON BOILER ROOM REPAIR OR REPLACE DEFECTIVE BURNED OUT SUMP PUMP. WORK IS NEEDED TO REMOVE SEWER WATER FROM BUILDING (PUMP IS UNDER WATER). HC-20000127 January 11, 2001 August 19, 2002 585 days
FM-200206525 02 8/26/02 (Stuart-Hobson) 1. Asbestos assessment required. Basement/Exit door leading to cafeteria/playground: Replace slide bolt, due to breaking off; door leads to 4th street side of playground. Code A-clear for repair by Horne Engineer by ( Philip Connolly ) on 4/26/02 ( CEB ) April 24, 2002 August 26, 2002 124 days