Closed Repair Requests: August 2005

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

August 2005 Summary

  • Urgent Requests
    4
    Average Time Elapsed: 217.8 Days
  • Routine Requests
    3
    Average Time Elapsed: 164 Days
  • Total Requests
    7

Detailed Reports

Urgent Repair Requests Completed in August 2005 (4)
Description Open Date Close Date Time Elapsed
FM-200457125 /04 8/1/05 (Stuart Hobson) !!!URGENT!!! 2nd Floor: Broken door hinge. Asbestos Code A - Clear for repairs on 10/21/04. DCPS Safety - Richard Gibson (RG) October 19, 2004 August 1, 2005 286 days
FM-200456939 /04 8/1/05 Stuart-Hobson Exterior Grounds 1) Change safety rails and extend surface 8 feet by fireman pole. Poc - Oscar Mebane - 202-345-0688 October 18, 2004 August 1, 2005 287 days
FM-200457124 /04 8/10/05 (Stuart Hobson) !!!URGENT!!! Basement/Kitchen: Hot water handle broken on sink in the kitchen. Asbestos Code A - Clear for repairs on 10/21/04. DCPS Safety - Richard Gibson (RG) October 19, 2004 August 10, 2005 295 days
FM-200509688 05 8/11/05 (Stuart-Hobson) "Urgent" Exterior main entrance. Repair or Replace panic bar. Note: Existing panic bar is not catching. August 8, 2005 August 11, 2005 3 days

Routine Repair Requests Completed in August 2005 (3)
Description Open Date Close Date Time Elapsed
FM-200503460 05 8/10/05 (Stuart-Hobson) Ground floor/Kitchen. Install 8" combination wall mount faucet on pot sink. March 31, 2005 August 10, 2005 132 days
FM-200510163 05 8/11/05 (Stuart-Hobson) "Emergency" Third floor/Room 305. Need electrician to assess and correct circuit breaker problem, circuits 11 and 13 were sizzling. Note: Currently no power in room 305. August 11, 2005 August 11, 2005 0 days
FM-200453516 04 8/22/05 Stuart-Hobson Fire Code Violation Basement Electrical panel door removed. August 27, 2004 August 22, 2005 360 days