Closed Repair Requests: August 2006

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

August 2006 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 1,349 Days
  • Routine Requests
    5
    Average Time Elapsed: 651.8 Days
  • Total Requests
    6

Detailed Reports

Urgent Repair Requests Completed in August 2006 (1)
Description Open Date Close Date Time Elapsed
FM-200222588 /02 8/25/06 REPAIR/REPLACE VALVE (STOP/SAFETY) December 15, 2002 August 25, 2006 1,349 days

Routine Repair Requests Completed in August 2006 (5)
Description Open Date Close Date Time Elapsed
FM-200624634 06 8/2/06 open fence for repair work and put back when work is completed June 22, 2006 August 2, 2006 41 days
FM-200618176 06 8/10/06 Stuart-Hobson Boiler Room Boiler #3 off on flame failure. No heat in building. Only Boiler working. February 2, 2006 August 10, 2006 189 days
FM-200459219 04 8/10/06 Stuart- Hobson Girls & Boys Gymnasium Repair or rplace on new thermostats in Girls and Boys gymnasium. December 6, 2004 August 10, 2006 612 days
FM-200223567 03 8/10/06 Stuart-Hobson Boiler Room Replace faulty relief vavle on domestic hot water heater; CASH ACME Type FVMX-ILS Series 4; size 3/4"; Thermostat inlet 1"; Set 150 PSI 210 F; 1,912,000 January 7, 2003 August 10, 2006 1,311 days
FM-200335343 03 8/25/06 S. Hobson boiler room Asbestos assessment may be required Retube boilers 1, 2, and 3. # 1 boiler was retube last year tubes may have to be rerolled tubes leaking in each boiler. POC: C Bradley 202-438-7437 Asbestos Code A - Clear for repairs on 03/17/04. Horne Engineering - Bipin Nanavaty (RG 03/19/04) August 15, 2003 August 25, 2006 1,106 days