Closed Repair Requests: September 2001

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

September 2001 Summary

  • Urgent Requests
    1
    Average Time Elapsed: 25 Days
  • Routine Requests
    6
    Average Time Elapsed: 101.3 Days
  • Total Requests
    7

Detailed Reports

Urgent Repair Requests Completed in September 2001 (1)
Description Open Date Close Date Time Elapsed
FM-200117134 01 9/4/01 (STUART-HOBSON) 1. ASBESTOS ASSESSMENT REQUIRED. 2ND FLOOR/NEAR BOYS BATHROOM: WATER FOUNTAIN CONSTANTLY RUNNING, MAKING A LOT OF NOISE. ASBESTOS CODE A -CLEAR FOR REPAIRS ON 08/13/01. SYLVIA GRIMES - SAFETY (202)576-5583 August 10, 2001 September 4, 2001 25 days

Routine Repair Requests Completed in September 2001 (6)
Description Open Date Close Date Time Elapsed
FM-200107834 01 9/6/01 STUART-HOBSON ASBESTOS ASSESSMENT REQUIRED BATHROOMS ON 3RD FLOOR. DEMOLISH AND REMOVE FLOORING. # HRGM CORP. POC: JOHN RIDGLEY-202-253-8370 ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/20/01. April 9, 2001 September 6, 2001 150 days
FM-200105917 01 9/14/01 STUART-HOBSON BOILER ROOM TUNNEL AREA REPAIR ALL STEAM LEAKS IN TUNNELS. R/R 4" RETURN LINE LEAKING WATER ON FLOOR IN STORE ROOM AREA. March 15, 2001 September 14, 2001 183 days
FM-200115161 01 9/17/01 STUART-HOBSON BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPAIR REFRACTORY IN FIRE BOXES OF @1, #2, AND #3 BOILERS. ASBESTOS CODE A-CLEAR ASSESSED BY HORNE ENG ON 7/24/01 July 12, 2001 September 17, 2001 67 days
FM-200120188 01 9/22/01 (STUART-HOBSON) BASEMENT/ CAFETERIA COURT REMOVE BULK TRASH WHEEL BARRELS RAKES, SHOVELS, (2) COMMODES, (1) SINK, WATER FOUNTAIN (1) LARGE TABLE, (2) WOODEN LADDERS , (2) GUARD RAILS CART, PIPES AND POLES, ALSO OTHER ITEMS. September 20, 2001 September 22, 2001 2 days
FM-200108892 01 9/26/01 STUART-HOBSON 1. ASBESTOS ASSESSMENT REQUIRED IN ORDER TO RECEIVE WORK PERMIT. 2. PERFORM ON GOING REPAIRS TO HVAC EQUIPMENT SUCH AS: BURNERS, BOILER AUXILARY EQUIPMENT, CONDENSATE/CIRCULATING PUMPS, PNUEMATIC CONTROLS, COMPRESSORS, CHILLERS, ROOFTOP AC UNITS, WINDOW AC UNITS, SUMP PUMPS, AIR HANDLER UNITS, RETURN AIR FANS, DOMESTIC HOT WATER HEATERS, EXHAUST FANS, UNIT VENTILATORS, ELECTRIC HEATERS, COOLING TOWERS AND UNSTOP DRAINS. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/20/01. April 20, 2001 September 26, 2001 159 days
FM-200117146 01 9/26/01 (STUART-HOBSON) MAIN OFFICE/PRINCIPAL: AIR CONDITIONING UNITIS LEAKING ON NEW CARPET, AND CAUSING DAMAGE TO CEILING TILE. August 10, 2001 September 26, 2001 47 days