Closed Repair Requests: September 2003
See Also: All Closed Repair Requests at Stuart-Hobson Middle School
September 2003 Summary
- Urgent Requests
0Average Time Elapsed: 0 Days - Routine Requests
8Average Time Elapsed: 31.1 Days - Total Requests
8
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200332741 03 9/11/03 Stuart -Hobson !! Emergency !! Exterior 1. Repair and or replace railing that broke off of steps in front of boys gym. | |||
| FM-200332727 03 9/12/03 Stuart -Hobson !! Emergency !! Basement Floor 1.) Repair leaking commode in the girls shower room , had to cut off water to commode. 1st, 2nd&3rd Floor 2.) Repair toilet leaking from the spud in girls restroom , leaking in the cafeteria . | |||
| FM-200335302 03 9/12/03 Stuart-Hobson F-519.0 FIRE CODE VIOLATION Basement Girls gym exit light. | |||
| FM-200337123 03 9/17/03 Stuart-Hobson First floor rooms 104 and 104 Locks on both door is very hard to open and the teacher has a very hard time to open the doors. This need immediate attention. | |||
| FM-200337126 03 9/17/03 Stuart-Hobson Third floor rooms 300 Lock on door is broken, unable to lock. This need immediate attention so teacher can lock her door. | |||
| FM-200337125 03 9/17/03 Stuart-Hobson Second floor rooms 202 Lock on door is broken, unable to lock. This need immediate attention due to teacher can not lock her door. | |||
| FM-200337124 03 9/17/03 Stuart-Hobson Second floor rooms 201 Lock on door is broken, unable to lock. This need immediate attention due to have dream fountain program in this room wwe keep computer out his room. | |||
| FM-200335057 03 9/23/03 Stuart Hubson Boiler Room Boilers #2 and #3 remove plugs on top. |