Closed Repair Requests: September 2006

See Also: All Closed Repair Requests at Stuart-Hobson Middle School

September 2006 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    5
    Average Time Elapsed: 3 Days
  • Total Requests
    5

Detailed Reports

Routine Repair Requests Completed in September 2006 (5)
Description Open Date Close Date Time Elapsed
FM-200629062 06 9/14/06 Auditorium/Stage right door remove sliding bolts off of door. September 11, 2006 September 14, 2006 3 days
FM-200629061 06 9/14/06 Auditorium corridor door not latching securing September 11, 2006 September 14, 2006 3 days
FM-200629048 06 9/14/06 Second Floor/Annex stairwell doors latches need adjusting. September 11, 2006 September 14, 2006 3 days
FM-200629046 06 9/14/06 306/Turn Style Knob Deffective September 11, 2006 September 14, 2006 3 days
FM-200629030 06 9/14/06 Basement/Door to boys gym key broken off inside of lock. September 11, 2006 September 14, 2006 3 days