Open Repair Requests: November 2005

See Also: All Open Repair Requests at Stuart-Hobson Middle School

November 2005 Summary

  • Urgent Requests
    0
  • Routine Requests
    2
  • Total Requests
    2

Detailed Reports

Routine Repair Requests Opened in November 2005 (2)
Description Open Date
FM-200515053 11/1/05 3rd floor, Teacher Lounge. Shop - Steamfitting - Roosevelt.Mashack. Repair Ruptured 1 inch riser thats leaking down to 2nd floor hall - Riser is between floors. Asbestos Code A - Clear for repairs on 02/07/06 Tidewater - Philp Connolly (RG 02/08/06) November 1, 2005
FM-200515429 11/14/05 Third and Second fl. Classrooms Repair Roof November 14, 2005

© The Washington Post Company