Open Repair Requests: November 2005
See Also: All Open Repair Requests at Stuart-Hobson Middle School
November 2005 Summary
- Urgent Requests
0 - Routine Requests
2 - Total Requests
2
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200515053 11/1/05 3rd floor, Teacher Lounge. Shop - Steamfitting - Roosevelt.Mashack. Repair Ruptured 1 inch riser thats leaking down to 2nd floor hall - Riser is between floors. Asbestos Code A - Clear for repairs on 02/07/06 Tidewater - Philp Connolly (RG 02/08/06) | |
| FM-200515429 11/14/05 Third and Second fl. Classrooms Repair Roof |
© The Washington Post Company
