Open Repair Requests: November 2006

See Also: All Open Repair Requests at Stuart-Hobson Middle School

November 2006 Summary

  • Urgent Requests
    0
  • Routine Requests
    6
  • Total Requests
    6

Detailed Reports

Routine Repair Requests Opened in November 2006 (6)
Description Open Date
FM-200631759 11/3/06 Stuart- Hobson Boiler room Survey and repair condensate return tank, the float or solenoid valve is sticking causing , the tank over fills November 3, 2006
FM-200631787 11/3/06 Rm. 112 - Seam leak from radiator November 3, 2006
FM-200632095 11/9/06 Check out steam leaks November 9, 2006
FM-200632188 11/14/06 Room 206 Repair ldefective radiator steam trap. Cannnot control the radiator heat. Students are getting overheated in this area. November 14, 2006
FM-200632235 11/16/06 First floor, Girls' Gymnasium. Repair leaking steamline in entrance area of girls' gymnasium. Note: Water dripping is very hot!! November 16, 2006
FM-200632287 11/17/06 Replace sub pump and sewage injector in tunnel. November 17, 2006

© The Washington Post Company