Open Repair Requests: February 2006
See Also: All Open Repair Requests at Stuart-Hobson Middle School
February 2006 Summary
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200618741 2/16/06 Urgent Replace leaking urinal on the third floor in the boys restroom |
| Description | Open Date |
|---|---|
| FM-200618272 2/3/06 First floor, Hallway. "Emergency" Asbestos Assessment Required. Remove a bank of nine student lockers and relocate them to basement area. Note: The current location of these lockers has been compromised with asbestos. Asbestos Code A - Clear for repairs on 02/07/06 Tidewater - Philp Connolly (RG 02/08/06) | |
| FM-200618274 2/3/06 First Floor-Stairlanding Re-anker ceiling light that is about to fall, held up by 1 bolt; subject to fall any minute. | |
| FM-200618276 2/3/06 Basement Level-Girls Gym Repair or replace the light switch. When switch is engaged sparks fly. | |
| FM-200618739 2/16/06 First Floor-Teachers Lounge Replace faucets on the sink | |
| FM-200618740 2/16/06 Replace the garbage disposal to the sink in the custodians office located in the basement |
© The Washington Post Company
