Open Repair Requests: March 2007

See Also: All Open Repair Requests at Stuart-Hobson Middle School

March 2007 Summary

  • Urgent Requests
    0
  • Routine Requests
    4
  • Total Requests
    4

Detailed Reports

Routine Repair Requests Opened in March 2007 (4)
Description Open Date
FM-200701598 3/13/07 Location: Kitchen Garbage disposal leaking water. March 13, 2007
FM-200702070 3/16/07 Location: 2nd and 3rd Floor Leaking from the roof. Asbestos Code A - Clear for repairs on 03/19/07. Tidewater - Roger Small (RG 03/20/07) March 16, 2007
FM-200702208 3/20/07 Basement Floor - Furnish change key to exterior Boiler Room door / or replace lock and furnish change key. March 20, 2007
FM-200702744 3/29/07 First Floor Hallway and basement hallway: Plaster is falling from the ceiling on the first floor hallway and basement area has become a hazadous areas Lead & Asbestos Code A - Clear for repairs on 03/30/07. Tidewater - Roger Small / Shamika Parker (RG 04/02/07) March 29, 2007