Open Repair Requests: May 2006
See Also: All Open Repair Requests at Stuart-Hobson Middle School
May 2006 Summary
- Urgent Requests
0 - Routine Requests
1 - Total Requests
1
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200623033 5/19/06 2nd Floor- Boys Bathroom Urinal on 3rd floor was stopped up, causing an overflow. It is causing the ceiling to leak badly in the 2nd Floor Boys Bathroom. Ceiling has peeling paint and it is spreading. Asbestos Code A - Clear for repairs on 05/22/06 Tidewater - Samuel May (RG 05/25/06) |
© The Washington Post Company
