Open Repair Requests: July 2006

See Also: All Open Repair Requests at Stuart-Hobson Middle School

July 2006 Summary

  • Urgent Requests
    0
  • Routine Requests
    2
  • Total Requests
    2

Detailed Reports

Routine Repair Requests Opened in July 2006 (2)
Description Open Date
FM-200625266 7/5/06 Pump water from the ledge in room 300 200 July 5, 2006
FM-200625612 7/12/06 There is no hot water in the East Wing of the Building. July 12, 2006

© The Washington Post Company