Open Repair Requests: September 2002
See Also: All Open Repair Requests at Stuart-Hobson Middle School
September 2002 Summary
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200217640 9/17/02 Stuart-Hobson Asbestos Assessment Reqd. 1st FloorRoom 102 Repair interior masonry wall where cracked under the chalkboard. Asbestos Code A - Clear for repairs on 09/20/02. DCPS Safety - Leroy Minton Jr. (RG 09/24/02) |
| Description | Open Date |
|---|---|
| FM-200217639 0217639 9/17/02 Stuart-Hobson Asbestos Assessment Reqd. 1st FLoor Auditorium Plaster is falling from the window ledge in chunks due to dampness whenever there is a heavy rain. Asbesstos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Charles E. Buchanan on 9/20/02 |
© The Washington Post Company
