Open Repair Requests: September 2005
See Also: All Open Repair Requests at Stuart-Hobson Middle School
September 2005 Summary
Detailed Reports
| Description | Open Date |
|---|---|
| FM-200512543 9/14/05 Stuart-Hobson Urgent Basement-Custodial Storage Room Repair or Replace light in storage room | |
| FM-200512544 9/14/05 Stuart-Hobson Urgent Parking Lot-Repair concret strps leading up from parking lot to the building. Concret has deteriated and is causing a tripping hazard. | |
| FM-200512612 9/15/05 Stuart-Hobson Ground Floor-Cafeteria and Entrance Repair terrazzo floor at the doorway to cafeteria. Also repair terrazzo at doorway leading to main hallway from rear entrance, terrazzo is broken and causing a safety hazard. Asbestos Code A - Clear for repairs on 09/22/05. Tidewater - Tony Marcolin (RG 09/23/05) | |
| FM-200512798 9/19/05 Stuart-Hopson Boiler room Replace missing safety valve on the # 2 boiler . |
| Description | Open Date |
|---|---|
| FM-200512033 9/8/05 Stuart-Hobson Boiler Room Boiler #1,#2 and #3 Replace quick open and slow open main drain line valve. | |
| FM-200512619 9/15/05 Stuart-Hobson Second Floor-Rm. 206 Replace broken window in room 206 |
© The Washington Post Company
