Urgent Open Repair Requests

See Also: All Open Repair Requests at Stuart-Hobson Middle School

Detailed Reports

Urgent Open Repair Requests
Description Open Date
FM-200217640 9/17/02 Stuart-Hobson Asbestos Assessment Reqd. 1st FloorRoom 102 Repair interior masonry wall where cracked under the chalkboard. Asbestos Code A - Clear for repairs on 09/20/02. DCPS Safety - Leroy Minton Jr. (RG 09/24/02) September 17, 2002
FM-200338412 10/2/03 Stuart-Hobson Urgent First floor # 3 and # 4 stairwell Railing on wall piece with bolts that holds the rail on the wall is missing top of stairwell, also railing bolt are very loose, can not tighten them. This is a safety hazard due to students having to go up and down stairswell to class. Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Richard Byrd (RG 10/08/03) October 2, 2003
FM-200338633 10/8/03 Stuart-Hobson Boiler room and tunnel Repair or rplace lights in the boiler room and tunnel area,the engineer can not provide service to these areas in the dark. This is a safety hazzard. Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Bipin Nanavaty (RG 10/22/03) October 8, 2003
FM-200341514 12/12/03 Stuart-Hobson No. 3 stairwell Bolts came out the railing inside of wall, coming down the stairwell. Custodian had to the railing down due to safety of students. This need attention. Asbestos Code A - Clear for repairs on 12/15/03. Horne Engineering - Troy Wilcome (RG 12/17/03) December 12, 2003
FM-200443188 1/23/04 (Stuart-Hobson) !!!URGENT!! Basement/Girls Gym: Light fixture has electrical short; student has fallen due to poor lighting. (Please respond (ASAP) January 23, 2004
FM-200456080 9/29/04 Stuart-Hobson First floor hall Lights need ballasts put in. Asbestos Code A - Clear for repairs on 10/01/03. DCPS Safety - Leroy Minton (RG 10/06/04) September 29, 2004
FM-200456087 9/29/04 Stuart-Hobson Basement Kitchen Kitchen storage room walls need plastering and painting. Also kitchen office vent need to be painted. Asbestos Code A - Clear for repairs on 10/01/03. DCPS Safety - Leroy Minton (RG 10/06/04) September 29, 2004
FM-200458744 11/29/04 Stuart- Hobson Gym Repair or replace heating unit that is leaking from ceiling in gym. Safety hazard. !!!! November 29, 2004
FM-200458845 11/30/04 Stuart- Hobson Boiler Room Replace safety valve on Boiler #3 November 30, 2004
FM-200502991 3/21/05 Stuart-Hobson URGENT Basement Hallway ceiling plaster is falling on students and staff immediate attention. Asbestos Code A - Clear for repairs on 03/21/05. DCPS Safety -Richard Gibson (RG) March 21, 2005
FM-200512543 9/14/05 Stuart-Hobson Urgent Basement-Custodial Storage Room Repair or Replace light in storage room September 14, 2005
FM-200512544 9/14/05 Stuart-Hobson Urgent Parking Lot-Repair concret strps leading up from parking lot to the building. Concret has deteriated and is causing a tripping hazard. September 14, 2005
FM-200512612 9/15/05 Stuart-Hobson Ground Floor-Cafeteria and Entrance Repair terrazzo floor at the doorway to cafeteria. Also repair terrazzo at doorway leading to main hallway from rear entrance, terrazzo is broken and causing a safety hazard. Asbestos Code A - Clear for repairs on 09/22/05. Tidewater - Tony Marcolin (RG 09/23/05) September 15, 2005
FM-200512798 9/19/05 Stuart-Hopson Boiler room Replace missing safety valve on the # 2 boiler . September 19, 2005
FM-200514134 10/22/05 (Stuart-Hobson) "Urgent" Asbestos Assessment Required. Ground floor, Cafeteria Staff Lockerroom. Repair ceiling and walls. Note: This room is totallly unsafe with falling plaster and peeling paint on walls. The ceiling was previously damaged by a water leak. Lead & Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Rodney Distance (RG 10/28/05) October 22, 2005
FM-200514695 10/26/05 (Stuart-Hobson) "Urgent" Exterior of Second & Third floor,. Repair or Replace roof (third floor) outside of room 308 & teachers' lounge, also on (second floor) across from room 216 and directly in front of stairwell # 3. October 26, 2005
FM-200514696 10/26/05 (Stuart-Hobson) "Urgent" Interior of Second & Third floor. Repair ceiling (third floor) in room 308 & teachers' lounge, also on (second floor) across from room 216 and directly in front of stairwell # 3. Note: Damage was caused by roof leaks. Lead & Asbestos Code A - Clear for repairs on 11/03/05. Tidewater - Rodney Distance (RG 11/04/05) October 26, 2005
FM-200517364 1/12/06 Very Urgent: Repair the roof leak on the first floor in the hallway across from #3 stairwell on the first floor. January 12, 2006
FM-200617698 1/23/06 Urgent Remove 6x3 plywood/carpet from side of dumpster, it smells of urine. Unsanitary January 23, 2006
FM-200618741 2/16/06 Urgent Replace leaking urinal on the third floor in the boys restroom February 16, 2006
FM-200621614 4/21/06 1st Floor- Annex Hall There are 4 holes in the wall, exposing heating pipes. Asbestos has already been removed. Asbestos Code A - Clear for repairs on 04/24/06. DCPS Safety - Richard Gibson (RG) April 21, 2006
FM-200630140 9/27/06 HOBSON S boiler room Replace safety valve boiler # 2 September 27, 2006

© The Washington Post Company