Urgent Open Repair Requests

See Also: All Open Repair Requests at Watkins Elementary School

Detailed Reports

Urgent Open Repair Requests
Description Open Date
FM-200208647 7 5/29/02 Watkins Throughout Entire Building Install power to Air Conditioner Units and repair the panel boxes. Safety Hazard. May 29, 2002
FM-200213115 5 7/26/02 Watkins Second Floor - Book Storage Room 1) Danny Hudson's crew has bagged suspect material from the site . Danny Hudson showed DCPS- Safety Sheila Howard. Danny Hudson Alonzo Lewis - 202-996-3304 pager call for escort. Code A Clear for Repair-by Horne Eng. Troy Wilcome 07-26-02. DCPS Safety-Sheila R. Howard 07-26-02. July 26, 2002
FM-200217590 0 9/16/02 (Watkins) "VERY URGENT" 2nd, 3rd, & 4th Floor: No electrical power in the above area's. (All breakers are on ) September 16, 2002
FM-200219959 10/24/02 Watkins First floor Installed need six slide bolts for door in lobby and on W street to secure building. Asbestos Code A - Clear for repairs on 09/30/03. DCPS Safety - Leroy Minton Jr. (RG 10/01/03) October 24, 2002
FM-200620040 3/16/06 Very Urgent Cafeteria-Replace the lights that are out March 16, 2006