January 2003 Summary

  • Urgent Requests
    4
    Average Time Elapsed: 116.5 Days
  • Routine Requests
    18
    Average Time Elapsed: 20.6 Days
  • Total Requests
    22

Detailed Reports

Urgent Repair Requests Completed in January 2003 (4)
Description Open Date Close Date Time Elapsed
FM-200216415 02 1/9/03 (Woodson, H.D.) Fire code violation: Basement/Band room: Door is split and not closing properly. Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Leroy Minton Jr. (RG 09/05/02) September 4, 2002 January 9, 2003 127 days
FM-200216750 02 1/22/03 (Woodson, H.D.) Fire code violation: 1. Asbestos assessment require. 2nd Floor/Assist. Principal's office: Hole in ceiling. Asbestos Code A - Clear for repairs on 09/09/02. DCPS Safety - Leroy Minton Jr. (RG 09/10/02) September 6, 2002 January 22, 2003 138 days
FM-200216765 02 1/22/03 (Woodson, H.D.) Fire code violation: Plaza/Exit door: Door to stairway #3 needs adjusting. Asbestos Code A - Clear for repairs on 09/09/02. DCPS Safety - Leroy Minton Jr. (RG 09/10/02) September 6, 2002 January 22, 2003 138 days
FM-200221472 /02 1/23/03 (Woodson, H.D.) !!!VERY URGENT!!! 1. Asbestos assessment required. Ground Floor/Kitchen: Leak at service sink from line coming up from the floor. Asbestos Code A - Clear for repairs on 11/21/02. Horne Engineering - Sharon Voss (RG 11/22/02) November 21, 2002 January 23, 2003 63 days

Routine Repair Requests Completed in January 2003 (18)
Description Open Date Close Date Time Elapsed
FM-200223395 /02 1/2/03 Woodson, H.D. Seventh Floor - 709 1) A new lock was installed on the door ...but it will not open. December 31, 2002 January 2, 2003 2 days
FM-200216623 02 1/9/03 (Woodson, H.D.) Fire code violation: 4th floor/Stairway#1: Door hardware missing. September 5, 2002 January 9, 2003 126 days
FM-200223892 03 1/14/03 Woodson SHS Ground Floor and 4th floor 1) Ground Floor - Kitchen - Service sink leaking in (2) different places. 2) 4th floor - Boys restroom commode is stopped up. January 14, 2003 January 14, 2003 0 days
FM-200223961 03 1/16/03 Woodson SHS Pool Area First Floor Pool lost water. Added water to pool. Back wash filters delivered cleaning chemical to pool instructor. January 14, 2003 January 16, 2003 2 days
FM-200223959 03 1/16/03 Woodson SHS Pool Pump Room First Floor Pool was done, do to filter being clogged. Clean all filters and filter tank. Put pool back on-line. January 14, 2003 January 16, 2003 2 days
FM-200218990 02 1/17/03 H.D Woodson Routine Work 1. Check chemical level 2. Added water to pools 3. Back wash filters October 7, 2002 January 17, 2003 102 days
FM-200224219 03 1/21/03 Woodson First Floor - Cafeteria 1) Remove and replace (2) wall hung water cooler. January 21, 2003 January 21, 2003 0 days
FM-200219899 /02 1/22/03 H.D Woodson Boiler Room P.M Chiller October 23, 2002 January 22, 2003 91 days
FM-200224261 03 1/23/03 Woodson, H.D. Third Floor - Cosmotogly Lab 1) Replace existing sink with new shampoo sink. Sink is on site. January 21, 2003 January 23, 2003 2 days
FM-200224036 03 1/23/03 (Woodson, H.D.) !!!EMERGENCY!!! Ground Floor/Cafeteria: Waste from drains backing up into the water fountain. January 15, 2003 January 23, 2003 8 days
FM-200224196 03 1/23/03 Woodson Boiler Room Asbestos assessment required Please make the necessary repairs to the ruptured 2" nipple on the condensate return line by the domestic hot water tank, line ruptureed, causing loss of condensate returns to condensate tank for Boiler feed. Asbestos Code A - Clear for repairs on 01/21/03. Horne Engineering - Troy Wilcome (RG 01/22/03) January 21, 2003 January 23, 2003 2 days
FM-200224446 03 1/25/03 H.D Woodson Pool Room 1. Clean filters,put new filter media on 2. Added chemicals to water 3. Adjust PH down 4. Added water January 23, 2003 January 25, 2003 2 days
FM-200224597 03 1/27/03 Woddson 2nd Floor - Room #210 Asbestos assessment required Repair busted pipe on 2nd floor, Pipe size approx. 1 1/4" .No valve to isolated . EMERGENCY!!!!! Asbestos Code A - Clear for repairs on 01/27/03. Horne Engineering - Sharon Voss (RG 01/27/03) January 27, 2003 January 27, 2003 0 days
FM-200224675 03 1/28/03 Woodson SHS Rooms - 602 and 502 1) Repair leaking lab sinks. January 28, 2003 January 28, 2003 0 days
FM-200224676 03 1/28/03 Woodson SHS Lobby 1) Repair toilet and sink, girls room fixtures off wall. January 28, 2003 January 28, 2003 0 days
FM-200223402 03 1/28/03 H.D.Woodson Boiler room Asbestos assessment may be required Repace ruptured 2" tee on return line to boiler to # 1 boiler Asbestos Code A - Clear for repairs 01/06/03. Horne Engineering - Tony Marcolin (RG 01/07/03) January 2, 2003 January 28, 2003 26 days
FM-200224681 03 1/30/03 Woodson, H.D. Room #306 Asbestosassessment required Repair or replace rupture coil in room #306, room is cold. Asbestos Code A - Clear for repairs on 01/29/03. Horne Engineering - Bipin Nanavaty (RG 01/30/03) January 28, 2003 January 30, 2003 2 days
FM-200224596 03 1/31/03 Woodson Second Floor - 210 1) Repair Busted pipe. January 27, 2003 January 31, 2003 4 days