Closed Repair Requests: January 2004
See Also: All Closed Repair Requests at Woodson High School
January 2004 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200443150 04 1/28/04 Woodson, HD Urgent !! Ground Floor : Repair Restrooms 1) Boys Locker Room Team Room #1 - Commode not working. 2) Team Room # 2 - Urinal not working. 3) Lobby - Boys urinal stopped up. 4) Girls LockerRoom - Commode not working. 5) Kitchen - Supply line leaking in Restroom. 6) Custodian Office - Commode not working and bowl is cracked. 7) Boys Restroom by Evevator # 1 - Replace toilet seat and paper towel box. |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200340793 /03 1/8/04 Woodson Boiler Room Boiler #1 Tubes leaking. | |||
| FM-200336000 03 1/13/04 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Auditorium: Door hinge broke in the girls bathroom, and stage door. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/12/03) | |||
| FM-200336001 03 1/13/04 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Hospitality Suite: Handle missing on door. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/15/03) | |||
| FM-200443029 04 1/21/04 Woodson, HD Emergency Third floor Boys restroom water is coming up from the bottom of toilet. The water is so bad it is going on the floors below. | |||
| FM-200444724 04 1/27/04 Ferebee-Hope Pool Room 1. Service pool water 2. Back wash filter tank 3. Pull strianer/lub motors 4. Check chemical levels 5. Add water and chemical, record in log. | |||
| FM-200444722 04 1/29/04 Ferebee-Hope Pool Room 1. Service pool water 2. Back wash filter tank 3. Pull strianer/lub motors 4. Check chemical levels 5. Add water and chemical, record in log. | |||
| FM-200335980 03 1/30/04 (Woodson, H.D.) FIRE CODE VIOLATION: Ground Floor/Back of Gym: Door hinge broke. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/15/03) | |||
| FM-200335958 03 1/30/04 (Woodson, H.D.) FIRE CODE VIOLATION: 2nd Floor/Stairwell #1: Hinge broke on door. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/15/03) | |||
| FM-200336003 03 1/30/04 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Music Room: Broken door hinge. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/15/03) | |||
| FM-200335957 03 1/30/04 (Woodson, H.D.) FIRE CODE VIOLATION: 2nd Floor/Moving Stair: Hinge broke on door. sbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/15/03) | |||
| FM-200335955 03 1/30/04 (Woodson, H.D.) FIRE CODE VIOLATION: 4th Floor/Moving Stair Door: Hinge broke on door. sbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/15/03) | |||
| FM-200443030 04 1/30/04 Woodson, HD Emergency Ground kitchen and cafeteria Grease trap need to be snake out. | |||
| FM-200335954 03 1/30/04 (Woodson, H.D.) FIRE CODE VIOLATION: 5th Floor/Stairwell #1: Hinge broke on door. sbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/15/03) | |||
| FM-200335950 03 1/30/04 (Woodson, H.D.) FIRE CODE VIOLATION: 7th Floor/Room #707: Door hardware broke causing door to close improperly. sbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/15/03) | |||
| FM-200335981 03 1/30/04 (Woodson, H.D.) FIRE CODE VIOLATION: Ground Floor/Gym: Door hinge broke. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Roger Kager (RG 09/15/03) | |||
| FM-200443452 04 1/31/04 Woodson,H D Boiler Room Boiler #1 tubes leaking. |
© The Washington Post Company
