Closed Repair Requests: October 2001

See Also: All Closed Repair Requests at Woodson High School

October 2001 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    27
    Average Time Elapsed: 60.7 Days
  • Total Requests
    27

Detailed Reports

Routine Repair Requests Completed in October 2001 (27)
Description Open Date Close Date Time Elapsed
FM-200114121 01 10/2/01 WOODSON, H.D. 1) INSTALL ELECTRICAL OUTLET IN FOOD SERVICE AREA . NEW OUTLET IS FOR THE CASH REGISTER. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/28/01. June 27, 2001 October 2, 2001 97 days
FM-200120732 01 10/2/01 H.D. WOODSON MARKING OF FOOTBALL FIELD October 1, 2001 October 2, 2001 1 day
FM-200120770 01 10/4/01 H.D. WOODSON MARKING OF FOOTBALL FIELD October 1, 2001 October 4, 2001 3 days
FM-200120754 01 10/4/01 H.D. WOODSON MARKING OF FOOTBALL FIELD October 1, 2001 October 4, 2001 3 days
FM-200100915 1/11/01 10/11/01 WOODSON, H.D. BOILER ROOM REPAIR #1 & 2 BOILER FEED PUMPS IN THE HEATING PLANT, AND CONTROLS TO BOILER FEED PUMPS. BOILER FEED PUMPS LEAKING AND HAVE TO CONSTANTLY HAND FEED #1 & 2 BOILERS. HC-20000388 January 11, 2001 October 11, 2001 273 days
FM-200109273 01 10/11/01 H.D. WOODSON BOILER ROOM REPAIR AIR COMPRESSOR #1 WITH DEFECTIVE PULLEY. WP-200108920 April 30, 2001 October 11, 2001 164 days
FM-200112726 01 10/11/01 H.D. WOODS BOILER ROOM REPAIR INOPERABLE AC CHILLERS #1 AND 2. UNIT FREQUENTLY SHUTS OFF WHILE UNDER LOAD. WP-200108920 June 7, 2001 October 11, 2001 126 days
FM-200116953 01 10/11/01 WOODSON, H.D. BOILER ROOM (1) ASBESTOS ASSESSMENT REQUIRED (2) REPAIR TWO DUNHAM BUSH CHILLERS. CODE A-CLEAR FOR REPAIR BY HORME ENG. 8/14/01. (CEB) ASBESTOS CODE A-CLEAR FOR REPAIR 10/12/01 BY HORNE ENGINEER EDWARD RODRIGUEZ August 8, 2001 October 11, 2001 64 days
FM-200120978 01 10/11/01 H.D. WOODSON CAFETERIA 1. ASBESTOS ASSESSMENT REQUIRED. 2. SURVEY AND REPAIR RUPTURED 2" HOT WATER (HEATING) LINE IN CAFETERIA. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/04/01. HORNE ENGINEERING - ROGER KAGER (RG) October 3, 2001 October 11, 2001 8 days
FM-200114533 01 10/15/01 WOODSON, H.D. 1) REMOVE OLD 6" PVC CHECK VALVE AND INSTALL NEW VALVE. NO PENETRATIONS!! EBA, INC - 202-408-6111 July 2, 2001 October 15, 2001 105 days
FM-200121594 /01 10/16/01 WOODSON BOILER ROOM ASBESTOS ASSESSMENT REQUIRED REMOVE HAND HOLE COVER TO BOILER #1 October 15, 2001 October 16, 2001 1 day
FM-200120977 01 10/17/01 H.D. WOODSON ZONE 5 CORRECT PNEUMATIC PROBLEM WITH ZONE 5 ACTUATOR. IT IS NOT OPENING UP TO ALLOU HEATING HOT WATER TO FLOW. WP-200108920 October 3, 2001 October 17, 2001 14 days
FM-200121592 /01 10/18/01 WOODSON EMERGENCY!! OUTSIDE OF ROOM G-76 1) GASES FILL THE CORRIDOR UP DUE TO WATER COOLERS REMOVED FROM THIS AREA. THESE LINES NEED TO BE CAPPED OFF. October 15, 2001 October 18, 2001 3 days
FM-200121552 /01 10/18/01 H.D. WOODSON MARKING OF FOOTBALL FIELD October 12, 2001 October 18, 2001 6 days
FM-200121724 /01 10/19/01 (WOODSON, H.D.) 1ST FLOOR/ KITCHEN !!! EMERGENCY !!! REPAIR BUSTED WATER LINE ON UNIVENT IN THE KITCHEN. POC CARNAL BRADLEY (202)438-7437 CALL FOR SITE VISIT ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/17/01. HONRE ENGINEERING - EDWARD RODRIGUE (RG) October 16, 2001 October 19, 2001 3 days
FM-200115842 01 10/20/01 H.D. WOODSON AUDITORIUM (1) ASBESTOS ASSESSMENT REQUIRE. (2) REPLACE STEAM COIL AND CHILL WATER COIL IN AUDITORIUM AIR HANDLER UNIT. PIPE IS INSULATION AND AIR HANDLER UNIT. ASBESTOS CODE A-CLEAR FOR REPAIR 10/12/01 BY HORNE ENGINEER EDWARD RODRIGUEZ July 25, 2001 October 20, 2001 87 days
FM-200121880 /01 10/22/01 (WOODSON) !!!EMERGENCY!!! GROUND FLOOR: REPAIR OR REPLACE EXIT LIGHTS, MISSING ELECTRICAL COVERS FOR LIGHT SWITCH, AND EXPOSED WIRING IN PANEL BOXES. (SITED BY DCRA) October 18, 2001 October 22, 2001 4 days
FM-200121958 /01 10/23/01 H.D. WOODSON MARKING OF FOOTBALL FIELD October 19, 2001 October 23, 2001 4 days
FM-200120891 01 10/24/01 H.D. WOODSON BOILER ROOM 1.ASBESTOS ASSESSMENT REQUIRED 2. REPAIR REFACTORY TO DOORS OF #1 AND #2 BOILERS ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/03/01. HORNE ENGINEERING - BILL CAMPION (RG) October 3, 2001 October 24, 2001 21 days
FM-200121963 /01 10/24/01 H.D. WOODSON MARKING OF FOOTBALL FIELD October 19, 2001 October 24, 2001 5 days
FM-200120649 01 10/25/01 (WOODSON 2ND, 4TH, 5TH, 6TH, 7TH FLOORS/ STAIRWELL #1 4TH FLOOR MOVING STAIRS ON THE 7TH FLOOOR ROOM 611, MOVING STAIRS ON THE 2ND FLOOR !!!!!!!!!!!! EMERGENCY !!!!!!!!!!!!! REPLACE BROKEN AND CRACKED WIRE MESH GLASS. September 28, 2001 October 25, 2001 27 days
FM-200115844 01 10/26/01 H.D. WOODSON ARMORY (1) ASBESTOS ASSESSMENT REQUIRE. (2) REPLACE STEAM COIL AND CHILL WATER COIL IN AUDITORIUM AIR HANDLER UNIT. PIPE IS INSULATION AND AIR HANDLER UNIT. ASBESTOS CODE A-CLEAR FOR REPAIR 10/12/01 BY HORNE ENGINEER EDWARD RODRIGUEZ July 25, 2001 October 26, 2001 93 days
FM-200103089 01 10/29/01 WOODSON, H.D. OUTSIDE GROUNDS REMOVE BULK TRASH FROM AROUND THE BACK OF THE BUILDING NEAR THE DUMPSTER. February 5, 2001 October 29, 2001 266 days
FM-200117599 01 10/29/01 WOODSON SHS GROUND - CAFETERIA 1) CEILING TILE ASSESSMENT NEEDED FOR CAFETERIA.. NEW TEACHERS CONFERENCE IS SCHEDULED FOR THE AUGUST 22, 2001. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 08/16/01. HORNE ENGINEERS - STEPHEN CALDWELL August 16, 2001 October 29, 2001 74 days
FM-200122268 /01 10/30/01 (WOODSON, H.D.) !!!EMERGENCY!!! 2ND LEVEL/PLAZA, ADJACENT TO AUDITORIUM: UNKNOWN PERSON OR PERSON(S) BROKE WINDOW IN EXTERIOR DOOR ON THE PLAZA. PERSON ARE ABLE TO WALK THE RAMP LEADING TO THE PLAZA DOOR, AND ENTER THE BUILDING. October 24, 2001 October 30, 2001 6 days
FM-200122398 /01 10/31/01 (WOODSON) !!!EMERGENCY!!! PLAZA/AUDITORIUM: REPLACE BROKEN WINDOW, AND INSTALL BARS TO PREVENT BREAK-IN AT EXTERIOR DOORS. ISOLATE. EMERGENCY. October 25, 2001 October 31, 2001 6 days
FM-200109976 01 10/31/01 WOODSON, H.D. FIRST (1ST) FLOOR 1) ASBESTOS ASSESSMENT REQUIRED. 2) CEILING, PLASTER CEILING DAMAGED FROM WATER LEAKING THE CEILING IS LOCATED NEAR THE ESCALATOR OFF THE 1ST FLOOR THE WATER LEAK HAS BEEN REPAIRED. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 06/20/01. May 10, 2001 October 31, 2001 174 days