Closed Repair Requests: October 2002

See Also: All Closed Repair Requests at Woodson High School

October 2002 Summary

  • Urgent Requests
    4
    Average Time Elapsed: 49.2 Days
  • Routine Requests
    32
    Average Time Elapsed: 22.8 Days
  • Total Requests
    36

Detailed Reports

Urgent Repair Requests Completed in October 2002 (4)
Description Open Date Close Date Time Elapsed
FM-200216422 02 10/8/02 (Woodson, H.D.) Fire code violation: Basement/Band room: Exit door hardware broken. Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Leroy Minton Jr. (RG 09/05/02) September 4, 2002 October 8, 2002 34 days
FM-200216401 02 10/8/02 (Woodson, H.D.) Fire code violation: 1. Asbestos assessment required. Basement/Girls bathroom: Ceiling tile missing. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) September 3, 2002 October 8, 2002 35 days
FM-200213337 02 10/10/02 Woodson,H.D. ****Urgent**** 1. Asbestos/Paint Assessment Reqd. Plaza level, 2nd, 3rd, 4th, 5th, 6th & 7th Floor [Escalators] 2. Paint all walls on path of escalator. Walls are in bad condition and this is in preparation for Superintendent's Conference on August 12, 2002. POC: Mr. Boyd, Head Custodian 202-724-4511/Ronnie Lowe 202-359-1929, Bldg. Service Manager Asbestos - Code A, clear for repairs on 7/30/02 Horne Engineering - Sharon Voss (RE - 7/31/02) Lead based paint - Code A, clear for repairs on 7/31/02 Horne Engineering - Edward Rodriguez (RE - 7/31/02) July 30, 2002 October 10, 2002 72 days
FM-200216685 02 10/31/02 (Woodson, H.D.) Fire code violation: 3rd Floor/Stairway #4: Latch missing. Issue to locksmith per - R. Welch 9/27/02 Asbestos Code A - Clear for repairs on 09/06/02. DCPS Safety - Leroy Minton Jr. (RG 09/09/02) September 5, 2002 October 31, 2002 56 days

Routine Repair Requests Completed in October 2002 (32)
Description Open Date Close Date Time Elapsed
FM-200213339 02 10/2/02 Woodson,H.D. Outside Grounds/Stadium Area Remove graffitti from stadium. July 31, 2002 October 2, 2002 63 days
FM-200218895 02 10/4/02 H.D Woodson SHS Pool Routine Check 1. Check Mechanical Equipment 2. Check PH/Chlorine count 3. Inspect contractor work 4. Add water where needed 5. Try to secure pool area's for weekend October 4, 2002 October 4, 2002 0 days
FM-200216562 02 10/8/02 (Woodson, H.D.) Fire code violation: G-79: Missing door closer. September 4, 2002 October 8, 2002 34 days
FM-200216409 02 10/8/02 (Woodson, H.D.) Fire code violation: Basement/Auditorium: Exit front door not latching. September 4, 2002 October 8, 2002 34 days
FM-200216561 02 10/8/02 (Woodson, H.D.) Fire code violation: G-6QA: Missing door closer (Back door) September 4, 2002 October 8, 2002 34 days
FM-200216579 02 10/8/02 (Woodson, H.D.) Fire code violation: Basement/Snack room: door closer missing. September 5, 2002 October 8, 2002 33 days
FM-200216626 02 10/8/02 (Woodson, H.D.) Fire code violation: 4th Floor/Boys restroom: Door needs repairing (2nd) one. September 5, 2002 October 8, 2002 33 days
FM-200216666 02 10/8/02 (Woodson, H.D.) Fire code violation: 4th Floor/Girls bathroom: Door closer broken. September 5, 2002 October 8, 2002 33 days
FM-200216676 02 10/8/02 (Woodson, H.D.) Fire code violation: 3rd Floor/Mens bathroom: Ceiling tile to be replaced. September 5, 2002 October 8, 2002 33 days
FM-200218964 02 10/9/02 H.D Woodson Routine Check 1st Floor 1. Check chemical balance 2. Check water level 3 Added water 4. Check mechanical equipment October 7, 2002 October 9, 2002 2 days
FM-200218917 02 10/9/02 H.D. Woodson Cut grass with big tractor October 7, 2002 October 9, 2002 2 days
FM-200218977 02 10/9/02 H.D Woodson Routine Maintenance 1. Check ph/chemical level 2. Add water to pool 3. Add chemical to pool 4. Back wash October 7, 2002 October 9, 2002 2 days
FM-200218982 02 10/9/02 H.D Woodson Routine Maintenance 1. Back wash filters 2. Add water to pool 3. Chemical balance test 4. Add chemicals 5. Check on contractor October 7, 2002 October 9, 2002 2 days
FM-200218975 02 10/9/02 POOL MAINTENANCE October 7, 2002 October 9, 2002 2 days
FM-200208835 02 10/10/02 H.D. Woodson Chiller room Check pneumatic zones for clouch zones for the ground floor and and perimeters. These areas are not cooling during the use of the chillers. (ASAP) June 3, 2002 October 10, 2002 129 days
FM-200208841 02 10/10/02 H.D. Woodson Chiller room Service #1 &2 chiller units, units are in alarm constantly. Needs to be reset. Keeps cutting off every 15 min. NOTE: Due to warm temperatures, both units are needed to cool the interior of the facility ASAP. June 3, 2002 October 10, 2002 129 days
FM-200211132 02 10/10/02 Woodson Chiller Room Repair /replace one coupling sleeve. Size # 09 sure flex. Down to one pump. EMERGENCY!!!! July 12, 2002 October 10, 2002 90 days
FM-200218151 02 10/10/02 Woodson,H.D. Home Ec. Room Repair six sinks in classroom. September 24, 2002 October 10, 2002 16 days
FM-200217982 02 10/15/02 Woodson,H.D. Ladies restroom - plaza area Lock on door not working by bank. September 20, 2002 October 15, 2002 25 days
FM-200219291 /02 10/16/02 Woodson, H.D. Third floor - Boys restroom Replace lock in door / broken restroom was set on fire need to secure it until it can be clean and painted. October 11, 2002 October 16, 2002 5 days
FM-200219410 /02 10/17/02 H.D Woodson 1. Mechanical Equipment P.M 2. Add water to pool 3. Check water level 4. Check water temp 5. Back wash sand filter October 15, 2002 October 17, 2002 2 days
FM-200219414 /02 10/17/02 H.D Woodson Routine Pool Check 1. Check ph & chemical level 2. Add water if needed 3. Add cehmicals 4. Back wash D.E. Filter 5. Back wash sand filter 6. Check water temp. 7. Mechanical equipment P.M. October 15, 2002 October 17, 2002 2 days
FM-200219617 /02 10/17/02 H.D Woodson Pool Pump Room Grounds 1. Pool was off line, put pool back n service 2. Added chemical to pool water 3. Added water to pool 4. Back wash D.E Filters 5. Communicated was pool instructor October 17, 2002 October 17, 2002 0 days
FM-200219407 /02 10/17/02 H.D Woodson 1. Check ph chemical level 2. Add chemical 3. Check water temp. 4. Add water to pool October 15, 2002 October 17, 2002 2 days
FM-200219456 /02 10/18/02 H.D. Woodson High School Cut grass with big tractor October 16, 2002 October 18, 2002 2 days
FM-200219514 /02 10/18/02 H.D Woodson Routine Checks 1. Check chemical level 2. Add chlorine, bromine 3. Add water 4. Check behind contractor 5. P.M Motor October 16, 2002 October 18, 2002 2 days
FM-200219666 /02 10/19/02 Woodson, H.D. Second floor - Room 210 Fourth floor - Room 412 Replace window pane broken out in both rooms.. October 18, 2002 October 19, 2002 1 day
FM-200219818 /02 10/22/02 H.D Woodson Pool Boiler Pool 1. Adjust aquastat to bring up water temp. 2. Clean filter add chemical October 22, 2002 October 22, 2002 0 days
FM-200219649 /02 10/23/02 Woodson H.D. 4th Floor - Stairwell # 4 1) This door leading to stairwell won't open. This is a very unsafe condition . October 18, 2002 October 23, 2002 5 days
FM-200219823 /02 10/24/02 H.D Woodson Pool Pump Room Pool Pool went down, do to filter media clogged with dirt. Wash down filters, put pool back on-line. October 22, 2002 October 24, 2002 2 days
FM-200219868 /02 10/31/02 Woodson,H.D. Boiler room Repair # 1 boiler ,will not start October 23, 2002 October 31, 2002 8 days
FM-200220185 /02 10/31/02 H.D Woodson Routine Check 1. Check pools make sure they are on-line 2. Add water to pool 3. Check ph & chemical level 4. Back wash filters October 29, 2002 October 31, 2002 2 days