October 2003 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    6
    Average Time Elapsed: 13 Days
  • Total Requests
    6

Detailed Reports

Routine Repair Requests Completed in October 2003 (6)
Description Open Date Close Date Time Elapsed
FM-200337586 03 10/2/03 Woodson !! Emergency !! Ground Floor 1. Repair tripple action pat sink is leaking, the pvc pipe is cracked and snaked out the grease trap. September 16, 2003 October 2, 2003 16 days
FM-200338492 03 10/6/03 (Woodson, H.D.) !!!EMERGENCY!!! Asbestos Assessment Required. Between 2nd & 3rd floors: Ruptured pipe in wall; water flowing from 3rd floor, to the 2nd floor. We are constantly mopping the water up, and unsure where the water is coming from other than behind wall. If maintenance personnel does not respond today, and this flooding continues through the week-end, water will travel all over the building, and there is a possibility of some classess to be canceled. Per. Mr. Boyd-Engineer. Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Ray Agnant (RG 10/31/03) October 3, 2003 October 6, 2003 3 days
FM-200339331 /03 10/24/03 Woodson Boiler room Boiler #1 Replace hand hole. Work completed. October 23, 2003 October 24, 2003 1 day
FM-200336634 03 10/28/03 Woodson Room #209 Replace deteriorate drip line on univent in room #209, water is leaking on floor. September 1, 2003 October 28, 2003 57 days
FM-200339606 /03 10/28/03 Woodscon School Marking of football field fot football game October30th for playoff game @ 2:30 Evans vs. PR Harris October 28, 2003 October 28, 2003 0 days
FM-200339687 /03 10/31/03 Woodson, H.D. First floor escalator landing Replace exit door glass fire proof wire mesh. October 30, 2003 October 31, 2003 1 day