Closed Repair Requests: October 2003
See Also: All Closed Repair Requests at Woodson High School
October 2003 Summary
-
Urgent Requests
0Average Time Elapsed: 0 Days -
Routine Requests
6Average Time Elapsed: 13 Days -
Total Requests
6
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200337586 03 10/2/03 Woodson !! Emergency !! Ground Floor 1. Repair tripple action pat sink is leaking, the pvc pipe is cracked and snaked out the grease trap. | |||
| FM-200338492 03 10/6/03 (Woodson, H.D.) !!!EMERGENCY!!! Asbestos Assessment Required. Between 2nd & 3rd floors: Ruptured pipe in wall; water flowing from 3rd floor, to the 2nd floor. We are constantly mopping the water up, and unsure where the water is coming from other than behind wall. If maintenance personnel does not respond today, and this flooding continues through the week-end, water will travel all over the building, and there is a possibility of some classess to be canceled. Per. Mr. Boyd-Engineer. Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Ray Agnant (RG 10/31/03) | |||
| FM-200339331 /03 10/24/03 Woodson Boiler room Boiler #1 Replace hand hole. Work completed. | |||
| FM-200336634 03 10/28/03 Woodson Room #209 Replace deteriorate drip line on univent in room #209, water is leaking on floor. | |||
| FM-200339606 /03 10/28/03 Woodscon School Marking of football field fot football game October30th for playoff game @ 2:30 Evans vs. PR Harris | |||
| FM-200339687 /03 10/31/03 Woodson, H.D. First floor escalator landing Replace exit door glass fire proof wire mesh. |