Closed Repair Requests: November 2003
See Also: All Closed Repair Requests at Woodson High School
November 2003 Summary
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200340110 03 11/7/03 (Woodson, H.D.) !!!VERY URGENT!!! 1st Floor Hallway/Near Electrical Closet: Repair 3 inch waste line, leaking on the 1st floor. | |||
| FM-200340109 03 11/11/03 (Woodson, H.D.) !!!VERY URGENT!!! Ground Floor/Hospitality Suite: Sink leaking badly, area flooded. | |||
| FM-200339937 03 11/19/03 Woodson Rooms #406 , #606 and #204 Asbestos assessment required on pipe in rooms #406, #204 and #606. Rupture hot water line rupture in room #406, #204 and #606. Pipes has insolation on them. No valve to isolate line. Asbestos Code A - Abated on 11/14/03 DCPS Safety - per Ronald Edwards comfirmed. (RG 11/21/03) | |||
| FM-200336838 03 11/21/03 (Woodson, H.D.) !!!URGENT!!! THROUGH-OUT THE BUILDING: All exit lights, and stair #2 lights are out; this problem exist through-out the building. |
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200339641 /03 11/7/03 Woodson, H.D. Girls bathroom Commode running over, 3rd floor hallway and classroom. | |||
| FM-200339688 /03 11/14/03 Woodson, H.D. Second floor Repair Citye water return line leaking. | |||
| FM-200340372 /03 11/17/03 (Woodson, H.D.) 3rd Floor/Boys Restroom: Water flooding the floors due to broken shut-off valve | |||
| FM-200340470 /03 11/20/03 WOODSON H.D. ceiling of room 207 Repipe heating coil in room 207 to 307. | |||
| FM-200340805 /03 11/24/03 Woodson Pool Pump Room Put pool back on line. Pool water was dumping. | |||
| FM-200340687 /03 11/25/03 (Woodson, H.D.) 5th Floor on down: Unstop 4" inch main line stopage. |
© The Washington Post Company
