Closed Repair Requests: November 2006

See Also: All Closed Repair Requests at Woodson High School

November 2006 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    21
    Average Time Elapsed: 104.0 Days
  • Total Requests
    21

Detailed Reports

Routine Repair Requests Completed in November 2006 (21)
Description Open Date Close Date Time Elapsed
FM-200631594 06 11/2/06 Third Floor - Principal Office - Repair or replace the lock on the door - Can't get into the room, key will not fit properly. November 1, 2006 November 2, 2006 1 day
FM-200630362 06 11/2/06 Woodson, H.D. Roof - Cooling tower Repair starter control for cooling tower. October 3, 2006 November 2, 2006 30 days
FM-200629604 06 11/6/06 Woodson Wellness Center Repair or replace heat pump unit for the Wellness Center. September 18, 2006 November 6, 2006 49 days
FM-200627808 06 11/7/06 Ground Floor/Lobby area of ground floor door hardware missing. August 17, 2006 November 7, 2006 82 days
FM-200628127 06 11/8/06 1st Fl./Door closer broken stairway #2 August 22, 2006 November 8, 2006 78 days
FM-200630858 /06 11/15/06 Replace sub pump in the boiler room. October 17, 2006 November 15, 2006 29 days
FM-200503051 05 11/20/06 (Woodson, H.D.) "Emergency" First floor/Library Relpace windows in library, the measurements are as follows: 1 ft.- 16 in. 9/21 width. 3 ft.-5 in. length. 2 ft.- in length. 3 ft.9/33 width. Code A-clear for repair by DCPS Charles Buchanan on 6/15/05 March 21, 2005 November 20, 2006 609 days
FM-200627803 06 11/21/06 Ground Floor/Coaches office next to it defective exit light. August 17, 2006 November 21, 2006 96 days
FM-200627815 06 11/21/06 Plaza/Stairwell No. 4 exit light out. August 17, 2006 November 21, 2006 96 days
FM-200627781 06 11/21/06 Ground Floor/Defective electrical socket in armory August 16, 2006 November 21, 2006 97 days
FM-200627817 06 11/21/06 Plaza/Conference rm. _ Defective phone outlet. August 17, 2006 November 21, 2006 96 days
FM-200627789 06 11/21/06 Ground Floor/Need cover plate for light switch in hallway next to cafeteria. August 16, 2006 November 21, 2006 97 days
FM-200627812 06 11/21/06 Ground Floor/Exit light out in auditorium. August 17, 2006 November 21, 2006 96 days
FM-200627806 06 11/21/06 Ground Floor/Exit lights out in gym and lobby area of parking lot. August 17, 2006 November 21, 2006 96 days
FM-200627805 06 11/21/06 Ground Floor/Exit light out in hallway in back of gym. August 17, 2006 November 21, 2006 96 days
FM-200631537 /06 11/27/06 Woodson, S.H.S Boiler room Provide trash pump to pump flooded boiler room out. October 31, 2006 November 27, 2006 27 days
FM-200628084 06 11/30/06 4th Fl./Fire glass cracked on 406 Asbestos Code A - Clear for repairs on 08/30/06. Tidewater - Tony Marcolin (RG 09/05/06) August 22, 2006 November 30, 2006 100 days
FM-200627823 06 11/30/06 7th/Stairway 4 fire door glass missing. Asbestos Code A - Clear for repairs on 08/17/06. Tidewater - Kenny Long (RG 08/18/06) August 17, 2006 November 30, 2006 105 days
FM-200628120 06 11/30/06 2nd Fl./Glass missing 208 Asbestos Code A - Clear for repairs on 08/30/06. Tidewater - Tony Marcolin (RG 09/05/06) August 22, 2006 November 30, 2006 100 days
FM-200628090 06 11/30/06 3rd Fl./Fire glass broken storage rm.310 Asbestos Code A - Clear for repairs on 08/30/06. Tidewater - Tony Marcolin (RG 09/05/06) August 22, 2006 November 30, 2006 100 days
FM-200627830 06 11/30/06 7th/Fire glass cracked on classroom window rm. 704 Asbestos Code A - Clear for repairs on 08/18/06. Tidewater - Thomas Johnson (RG 08/22/06) August 17, 2006 November 30, 2006 105 days