Closed Repair Requests: December 2003
See Also: All Closed Repair Requests at Woodson High School
December 2003 Summary
- Urgent Requests
0Average Time Elapsed: 0 Days - Routine Requests
9Average Time Elapsed: 23.8 Days - Total Requests
9
Detailed Reports
| Description | Open Date | Close Date | Time Elapsed |
|---|---|---|---|
| FM-200340886 03 12/2/03 Woodson, HD Ground and 6th floor Locksmith change locks room 602 change 2 lock, band room change 2 locks. | |||
| FM-200340343 /03 12/5/03 Woodson SHS Water running in to hallways and classrooms. 1) 5th Floor - Girls Restroom - Water leaking from cut off valve. 2) 3rd Floor - Boys Restroom - Water running from under the commode. 3) Ground Floor - Kitchen - Water running from bottom of the pipe. 4) Ground Floor - Custodial Office - Water leaking from cut off valve. | |||
| FM-200341119 03 12/5/03 Woodson Boiler Room Repair 3" PVC line to sump pump Emergency!!!!! | |||
| FM-200341107 03 12/5/03 Woodson SHS Emergency !!! First Floor - Next To Elevator # 1 1) Chemical waste drain pipe line is leaking into hallway. | |||
| FM-200342128 03 12/5/03 Woodson Pool Area Check lights, Back wash filter system, add water and check temp. of water. | |||
| FM-200336017 03 12/9/03 (Woodson) FIRE CODE VIOLATIONS: Ground Floor/Cafeteria: Broken door Hardware/Replace knob lock. Instructed to issue to locksmith Code A-claer for repair by DCPS Charles Buchanan on 8/22/03 | |||
| FM-200342123 03 12/9/03 Woodson Pool Area Prouide services to pool mechincal room. Clean all filter media, add chemicals and water. | |||
| FM-200341073 03 12/19/03 Woodson, H.D. Install 8" faucet on pot sink in kitchen. | |||
| FM-200339255 /03 12/31/03 Woodson Boiler Room Boiler #2 condensate return line to feed water line to boiler is leaking, 2" line |
© The Washington Post Company
