February 2002 Summary

  • Urgent Requests
    0
    Average Time Elapsed: 0 Days
  • Routine Requests
    9
    Average Time Elapsed: 84.7 Days
  • Total Requests
    9

Detailed Reports

Routine Repair Requests Completed in February 2002 (9)
Description Open Date Close Date Time Elapsed
FM-200123405 /01 2/4/02 H.D. WOODSON **EMERGENCY** GROUND FLOOR, TEACHERS DINING ROOM A BUSTED COOPER LINE IN THE FOUNTAIN MACHINE. ASBESTOS CODE A-CLEAR FOR REPAIR BY 11-16-01 HORNE ENGINEER: SHARON VOSS November 15, 2001 February 4, 2002 81 days
FM-200202390 02 2/4/02 H.D. WOODSON POOL PUMP ROOM REPLACE TWO PIT INJECTOR PUMPS WITH 3" DISCHARGE LINES. PUMPS WATER OUT OF PUMP ROOM. BOTH PUMPS ARE DOWN. February 4, 2002 February 4, 2002 0 days
FM-200122153 /01 2/5/02 (WOODSON, H.D.) ASBESTOS ASSESSMENT REQ. 2ND, 4TH, AND 6TH FLOORS/ BY STAIRWELL REPAIR OR REPLACE EXIT LIGHTS AND 16 LIGHT SWITCH PLATES. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 10/23/01. HORNE ENGINEERING - SHERYLL GAMES (RG) October 23, 2001 February 5, 2002 105 days
FM-200202495 02 2/11/02 H.D. WOODSON PHYSICAL HEATING PLANT, BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. REPLACE (2) - 3" TUBES IN BOILER #2, TUBES ARE LEAKING AND NEED TO BE REPLACED AS SOON AS POSSIBLE BOTH BOILERS ARE NEEDED DURING THE HEATING SEASON. ATTN: MR. C. BRADLEY EMERGENCY ASBESTOS CODE A-CLEAR FOR REPAIR ON 2/05/02 BY HORNE ENGINEER: STEPHEN CALDWELL February 5, 2002 February 11, 2002 6 days
FM-200124468 01 2/11/02 WOODSON, H.D. BOILER ROOM !!!! EMERGENCY !!!! SUMP PUMP (AMP) FUSER HAS BLOWN AND WATER IS LEAKING ALL OVER THE FLOOR. ISOLATE EMERGENCY. December 4, 2001 February 11, 2002 69 days
FM-200126521 02 2/14/02 (WOODSON,H.D.) ASBESTOS ASSESSMENT REQUIRED 5TH FLOOR ROOM 509 READJUST DOOR WHICH IS OFF TRACK--DOOR WILL NOT CLOSE (SIZE: 35 3/4X81). ASBESTOS CODE A-CEAR FOR REPAIR ON 1/03/01 BY HORNE ENGINEER: SHARON VOSS January 2, 2002 February 14, 2002 43 days
FM-200125783 /01 2/21/02 H.D. WOODSON MAIN OFFICE MAKE THE NECESSARY REPAIRS TO UNIVENTS IN THE MAIN OFFICE AREA.L UNITS NOT HEATING OFFICE AREA. PNEUMATIC PROBLEMS ZONE NOT OPENING. December 19, 2001 February 21, 2002 64 days
FM-200122784 01 2/21/02 H.D. WOODSON FILTRATION ROOM SUB BASEMENT REPLACE (1) ONE BALL FLOAT ASSEMBLY ON THE SUPPLY LINE OF THE FILTRATION TANK. FLOAT IS DEFECTIVE, NEEDED TO KEEP WATER BALANCED IN FILTRATION TANK WHEN POOL IS ON LINE. November 1, 2001 February 21, 2002 112 days
FM-200110427 01 2/22/02 (WOODSON, H.D.) HEALTH CODE VIOLATION: CAFETERIA/KITCHEN: REPAIR COLD WATER AT UTILITY SINK, ADJACENT TO THREE- COMPARTMENT SINK. REPAIR SINK ADJACENT TO DEEP FAT FRYER. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 05/17/01. May 16, 2001 February 22, 2002 282 days