Closed Repair Requests: February 2003

See Also: All Closed Repair Requests at Woodson High School

February 2003 Summary

  • Urgent Requests
    3
    Average Time Elapsed: 33.3 Days
  • Routine Requests
    26
    Average Time Elapsed: 70.8 Days
  • Total Requests
    29

Detailed Reports

Urgent Repair Requests Completed in February 2003 (3)
Description Open Date Close Date Time Elapsed
FM-200225715 03 2/14/03 (Woodson, H.D.) !!!URGENT!!! 4th Floor/Boys restroom: Toilet is backing up, please unstop. February 12, 2003 February 14, 2003 2 days
FM-200220927 /02 2/19/03 (Woodson, H.D.) !!!URGENT!!! 1. Asbestos assessment required. 7th Floor/Stairwell #3 & 4 : Request welders to spot weld latch guard, surrounding steps to cage. Asbestos Code A-clear for repair by charles E. Buchanan on 11/14/02 DCPS Charles E. Buchanan November 13, 2002 February 19, 2003 98 days
FM-200226116 03 2/24/03 (Woodson, H.D.) !!!VERY URGENT!!! 3rd Floor/Boys & Girls restroom: When commode is flushed in these restrooms, all other toilets back up, and run over from the 7th floor to the basement. (Appears to be a major back-up) February 24, 2003 February 24, 2003 0 days

Routine Repair Requests Completed in February 2003 (26)
Description Open Date Close Date Time Elapsed
FM-200225220 03 2/7/03 Woodson, H.D. Room #210 Repair leaking heating unit. EMERGENCY!!!!!!! February 5, 2003 February 7, 2003 2 days
FM-200225313 03 2/8/03 H.D Woodson Pool Pump Room First Floor 1. Back wash filters 2. Add chemicals to pool 3. Adjust water level 4. Put lights in pump room February 6, 2003 February 8, 2003 2 days
FM-200216668 02 2/10/03 (Woodson, H.D.) Fire code violation: Room #302: Exposed wiring, also need electrical switch plate. September 5, 2002 February 10, 2003 158 days
FM-200225425 03 2/10/03 Woodson, H.D. Boiler room Repair # 1 and # 2 Burners ,they cut in flame failure and be reset February 10, 2003 February 10, 2003 0 days
FM-200225592 03 2/11/03 H.D. Woodson Room 312 ceiling Abestos assessment required on pipes in the ceilng Repair or replace ruptured heat pipes in the ceiling of room 312 Asbestos Code A - Clear for repairs on 02/11/03. Horne Engineering - Edward Rodriguez (RG 02/11/03) February 11, 2003 February 11, 2003 0 days
FM-200216589 02 2/11/03 (Woodson, H.D.) Fire code violation: 6th Floor/Stairway #4: Door missing hardware. September 5, 2002 February 11, 2003 159 days
FM-200225626 03 2/11/03 H.D Woodson Check on contractor work for Mr. Tony Law February 11, 2003 February 11, 2003 0 days
FM-200225629 03 2/11/03 H.D Woodson Pool Pump Room First Floor 1. Back wash filters 2. Added chemicals 3. Added water February 11, 2003 February 11, 2003 0 days
FM-200225109 03 2/12/03 (Woodson, H.D.) Plaza level/Main office: Loose electrical plug under employee's desk. February 3, 2003 February 12, 2003 9 days
FM-200225635 03 2/13/03 H.D Woodson Pool Pump Room First Floor 1. Some open return system line, which released large amount of steam 2. Inform contractor, that pool needs vacuum 3. Check chemical level February 11, 2003 February 13, 2003 2 days
FM-200225646 03 2/13/03 H.D Woodson Pool Pump Room First Floor 1. Put swimming pool back on line 2. Added chemicals to water 3. Back wash filter system February 11, 2003 February 13, 2003 2 days
FM-200225447 03 2/13/03 Woodson, H.D. Room 411 Asbestos assessment required Repair or replace ruptured heating coil in unit heater in room 411, there no isolation valves Asbestos Code A - Clear for repairs on 02/10/03. Horne Engineering - Bipin Nanavaty (RG 02/11/03) February 10, 2003 February 13, 2003 3 days
FM-200225538 03 2/13/03 H. D Woodson Boiler Room P.M Chiller February 11, 2003 February 13, 2003 2 days
FM-200216674 02 2/14/03 (Woodson, H.D.) Fire code violation: 3rd Floor/Stairwell #2: Missing hardware. Issue to locksmith per - R. Welch 9/27/02 September 5, 2002 February 14, 2003 162 days
FM-200216622 02 2/14/03 (Woodson, H.D.) Fire code violation: 4th floor/Stairway#1: Door hardware missing. September 5, 2002 February 14, 2003 162 days
FM-200216580 02 2/14/03 (Woodson, H.D.) Fire code violation: 7th Floor Stairwell #1: Hardware defective, and not latching hall. September 5, 2002 February 14, 2003 162 days
FM-200216737 02 2/14/03 (Woodson, H.D.) Fire code violation; 2nd Floor/Stairway #3: Missing latch. Issue to loksmith per - R. Welch 9/27/02 September 6, 2002 February 14, 2003 161 days
FM-200225329 03 2/14/03 Woodson, H.D. Ground floor room G 75 There is five electrical outlet on the floor that fire is shooting from them. February 6, 2003 February 14, 2003 8 days
FM-200216735 02 2/14/03 (Woodson, H.D.) Fire code violation; 2nd Floor/Stairway #1: Latch missing. Issue to locksmith per - R. Welch 9/27/02 September 6, 2002 February 14, 2003 161 days
FM-200205588 02 2/15/03 H. D. Woodson 1st fl. mech room over pool Replace dehumidifier computer control panel. Kids broke in area and destroyed controls, possibly more damage. System is not working now, air is getting stuffy, walls beginning to sweat. April 8, 2002 February 15, 2003 313 days
FM-200225426 03 2/19/03 Woodson, H.D. Cafeteria Asbestos assessment required Repair or rplace ruputured 1 1/2 return line on heating unit in the cafeteria. Asbestos Code A - Clear for repairs on 02/10/03. Horne Engineering - Bipin Nanavaty (RG 02/11/03) February 10, 2003 February 19, 2003 9 days
FM-200226094 03 2/24/03 (Woodson, H.D.) 5th Floor/Boys bathroom: Flush valve leaking profusely; running out in the hallway. Unit broke on flush valve; need a complete flush valve unit. (Unable to shut off water) February 24, 2003 February 24, 2003 0 days
FM-200216629 02 2/26/03 (Woodson, H.D.) Fire code violation: 3rd Floor/Stairway #4: Door needs adjusting. September 5, 2002 February 26, 2003 174 days
FM-200216411 02 2/26/03 (Woodson, H.D.) Fire code violation: Basement/Music hallway auditorium: Exit door closer broken. Issue to locksmiths per - R. Welch 9/27/02 September 4, 2002 February 26, 2003 175 days
FM-200225856 03 2/27/03 Woodson,H.D Boiler room Asbestos assessment required Repair or replace 1 1/2" leaking return condensate return line on #2 boiler Asbestos Code A - Clear for repairs on 02/19/03. Horne Engineering - Bipin Nanavaty (RG 02/20/03) February 14, 2003 February 27, 2003 13 days
FM-200226134 03 2/28/03 Woodson Escalator 1. Repair light s on path of escalator - seems to be electrical. February 25, 2003 February 28, 2003 3 days

© The Washington Post Company