Closed Repair Requests: February 2007

See Also: All Closed Repair Requests at Woodson High School

February 2007 Summary

  • Urgent Requests
    3
    Average Time Elapsed: 552.7 Days
  • Routine Requests
    21
    Average Time Elapsed: 45.5 Days
  • Total Requests
    24

Detailed Reports

Urgent Repair Requests Completed in February 2007 (3)
Description Open Date Close Date Time Elapsed
FM-200340111 03 2/2/07 (Woodson, H.D.) !!!VERY URGENT!!! 3rd Floor/Boys Restroom: Leaking badly. November 7, 2003 February 2, 2007 1,183 days
FM-200700059 07 2/26/07 Classroom - 412 - Repair or replace fan coil units into classroom 512 from classroom 412. Units can not be isolated leaking badly. Asbestos Code B on 01/28/07. Tidewater - Tony Marcolin (RG 01/29/07) Asbestos Code A - Abated and cleared for repairs on 01/30/07 by Goel Construction (LM/02-08-07) Safety Office 202-576-8962 January 29, 2007 February 26, 2007 28 days
FM-200516105 05 2/26/07 Woodson, H.D. Storage Room - (Ground Floor) Air Handle Unit Repair or replace air handle unit in Kitchen. No heat. Urgent !!!! December 6, 2005 February 26, 2007 447 days

Routine Repair Requests Completed in February 2007 (21)
Description Open Date Close Date Time Elapsed
FM-200700125 07 2/12/07 Second floor, Room210. Repair or replace ruptured pipe. Note: Abatement is needed. January 31, 2007 February 12, 2007 12 days
FM-200628256 06 2/13/07 7th Fl./Stairway #4 exit sign hanging August 24, 2006 February 13, 2007 173 days
FM-200700122 07 2/21/07 Ground Floor - Distric Police Office - No electrical sockets working - need electrical assessment and repair made. January 31, 2007 February 21, 2007 21 days
FM-200634297 07 2/22/07 Boiler Room - Replace Mcdonnell Miller water level control on Boiler # 1. January 24, 2007 February 22, 2007 29 days
FM-200634196 07 2/26/07 Fourth floor, Room 404. Repair or replace ruptured steamline to univent, this leak is causing this classroom to flood. Asbestos Code A - Clear for repairs on 01/23/07. Tidewater - Roger Small (RG 01/22/07) January 23, 2007 February 26, 2007 34 days
FM-200634291 07 2/26/07 Basement - Cafeteria Managers Office - Fan coil is leaking. January 24, 2007 February 26, 2007 33 days
FM-200700012 07 2/26/07 Cafeteria manager's office , ground floor Repair or replace leaking 3/8" copper supply line on small univent in manager's office, laek is causing a unsafe and slipping surroundings. January 29, 2007 February 26, 2007 28 days
FM-200633541 /06 2/26/07 Second Floor - Room 204 - Repair leaking water lines to univent coil. Asbestos Code A - Clear for repairs on 12/27/06. Tidewater - Aaron Gholson (RG 01/05/07) December 27, 2006 February 26, 2007 61 days
FM-200631820 06 2/26/07 Woodson , H.D. Boiler room Repair or replace domestic hot water circulating pump located at the rear of hot water storage tank. Pump may be shorted out from the flood. November 6, 2006 February 26, 2007 112 days
FM-200626930 06 2/26/07 Boiler Room - Repair refractory around burner. As per Boiler Inspector ( DCRA ). August 7, 2006 February 26, 2007 203 days
FM-200700146 07 2/26/07 Second floor, Room 204. Repair ruptured univent pipe. February 1, 2007 February 26, 2007 25 days
FM-200700148 07 2/26/07 Plaza Area, Main Office. Repair ruptured line in univent. February 1, 2007 February 26, 2007 25 days
FM-200700151 07 2/26/07 Sixth floor, Asst. Principal's Office. Repair ruptured line in univent from seventh floor. February 1, 2007 February 26, 2007 25 days
FM-200700153 07 2/26/07 Ground floor, Kitchen Mechanical Room. Repair ruptured steam coil on AHU. February 1, 2007 February 26, 2007 25 days
FM-200700154 07 2/26/07 Ground floor, Food Service Office. Repair ruptured valves in fan coil unit coil . February 1, 2007 February 26, 2007 25 days
FM-200700155 07 2/26/07 Fourth floor, Food Teachers' Restroom. Repair ruptured line in teachers' restroom & stairwell # 4. February 1, 2007 February 26, 2007 25 days
FM-200700157 07 2/26/07 Fourth & Fifth floor, Classrooms 412 & 512. Repair ruptured pipe from univent in office # 512 and classroom # 412 is out of service and office in # 512 there is no heat. February 1, 2007 February 26, 2007 25 days
FM-200700219 07 2/26/07 Fourth floor, Room 412. Ruptured steamline off of the univent, water is pouring down into the library. February 5, 2007 February 26, 2007 21 days
FM-200700568 07 2/26/07 Fourth Floor - Girl's Bathroom (across from 408) - Replace cinder blocks in wall so sink can be replaced. February 16, 2007 February 26, 2007 10 days
FM-200634188 07 2/26/07 Room 305 Repair or replace Ruptured hot watre heating supplt line in room 305. January 23, 2007 February 26, 2007 34 days
FM-200700569 07 2/26/07 1st & 7th Floor - Repair wiring for outlets to water coolers February 16, 2007 February 26, 2007 10 days