Closed Repair Requests: March 2002

See Also: All Closed Repair Requests at Woodson High School

March 2002 Summary

  • Urgent Requests
    2
    Average Time Elapsed: 8.5 Days
  • Routine Requests
    15
    Average Time Elapsed: 87.3 Days
  • Total Requests
    17

Detailed Reports

Urgent Repair Requests Completed in March 2002 (2)
Description Open Date Close Date Time Elapsed
FM-200203789 02 3/12/02 WOODSON, H.D. !!!! URGENT !!!! PLAZA - LEVEL FABRICATE METAL CAGE FOR ELECTRICAL SWITCH LOCATED ON PLAZA. THIS IS A SAFETY PROBLEM: CHILDREN ARE PLAYING WITH THIS SWITCH. WELDERS NEEDED. SAFETY HAZARD. March 4, 2002 March 12, 2002 8 days
FM-200203896 02 3/14/02 (Woodson,H.D.) ****Urgent**** Ground Floor Behind Coaches Office By "Up" Escalator Repair or replace exit lights. March 5, 2002 March 14, 2002 9 days

Routine Repair Requests Completed in March 2002 (15)
Description Open Date Close Date Time Elapsed
FM-200203613 02 3/1/02 H.D. Woodson Boiler room PM a/c chiller. February 27, 2002 March 1, 2002 2 days
FM-200118244 01 3/3/02 (WOODSON,H.D.) GROUNDS INSTALL GATE ON PRIVATE PROPERTY (ASK OWNER) August 23, 2001 March 3, 2002 192 days
FM-200118246 01 3/3/02 (WOODSON,H.D.) GROUNDS SWEEP PARKING LOT. August 23, 2001 March 3, 2002 192 days
FM-200118257 01 3/3/02 (WOODSON,H.D.) GROUNDS HAVE MOWING CONTRACTOR CLEAR & GRUB SERVICE DRIVE NEAR SCOREBOARD. August 23, 2001 March 3, 2002 192 days
FM-200118226 01 3/5/02 (WOODSON,H.D.) GROUNDS RELOCATE PLANTERS ALONG WALKWAY August 23, 2001 March 5, 2002 194 days
FM-200203891 02 3/6/02 (Woodson,H.D.) Ground Level Boys Locker Room Repalce broken panic bar on door to boys locker room. March 5, 2002 March 6, 2002 1 day
FM-200121084 01 3/11/02 H.D. WOODSON MARKING OF FOOTBALL FIELD October 5, 2001 March 11, 2002 157 days
FM-200121539 /01 3/11/02 H.D. WOODSON MARKING OF FOOTBALL FIELD October 12, 2001 March 11, 2002 150 days
FM-200204184 02 3/13/02 (Woodson,H.D.) Apply fertilizer and lime to field March 11, 2002 March 13, 2002 2 days
FM-200203670 02 3/14/02 (Woodson,H.D.) Ground Floor/55th Street Entrance Door Issue three (3) keys: 2 ground-floor keys and one (1) entrance door key for the 55th street entrance door. [S.W.A.T team] February 28, 2002 March 14, 2002 14 days
FM-200120042 01 3/14/02 WOODSON STADIUM PROJECT September 18, 2001 March 14, 2002 177 days
FM-200202834 02 3/18/02 WILSON,W. POOL PUMP ROOM REPAIR OR REPLACE 1/2" DOMESTIC WATER COPPER LINE. WATER LEAKING FROM ELBOW. INSULATED WATER. NEED AS SOON AS POSSIBLE/WORK WILL BE DONE IN HOUSE. February 12, 2002 March 18, 2002 34 days
FM-200204979 02 3/27/02 H.D. Woodson Boiler room Repair burner #2 off on flame failure. March 27, 2002 March 27, 2002 0 days
FM-200204971 02 3/28/02 Woodson, H.D Boiler room 1.Asbestos assessment required. 2.Repair or replace port valve on #13 pump strainer. Asbestos Code A - Clear For Repairs On 03/27/02. Horne Engineering - Philp Connolly (RG 03/27/02) March 27, 2002 March 28, 2002 1 day
FM-200204996 02 3/28/02 H.D. Woodson Boiler room 1. Asbestos assessment required. 2. Repair ruptured 1/2" hot water heating line. Asbestos Code A - Clear For Repairs On 03/27/02. Horne Engineering - Troy Wilcome (RG 03/27/02) March 27, 2002 March 28, 2002 1 day