March 2003 Summary

  • Urgent Requests
    3
    Average Time Elapsed: 165.3 Days
  • Routine Requests
    37
    Average Time Elapsed: 331.5 Days
  • Total Requests
    40

Detailed Reports

Urgent Repair Requests Completed in March 2003 (3)
Description Open Date Close Date Time Elapsed
FM-200216588 02 3/12/03 (Woodson, H.D.) Fire code violation: 7th Floor/Stairway #4: Ceiling needs plastering. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) September 5, 2002 March 12, 2003 188 days
FM-200216770 02 3/20/03 Woodson,H.D. Building Exterior/Front Lobby Steps The guard plates on the steps are loose and one has come off. Some persons have suffered falls as a result [safety hazard]. September 6, 2002 March 20, 2003 195 days
FM-200221879 02 3/26/03 Woodson Cafeteria Asbestos assessment required Repair rupture hot water supply line in ceiling of cafeteria Weekending 11/04/02-11/8/02 FM-200220611 Asbestos Code A-clear for repair by Horne Engineer Philip Connolly DCPC Safety Charles E. Buchanan on 12/03/02 December 3, 2002 March 26, 2003 113 days

Routine Repair Requests Completed in March 2003 (37)
Description Open Date Close Date Time Elapsed
FM-200226238 03 3/3/03 Woodson Room 210 Repair leaking heating units in room #210 February 26, 2003 March 3, 2003 5 days
FM-200124308 01 3/3/03 (WOODSON, H.D.) Floor Tile Removal in AMP #102. Remove Transite Panel in AMP #G-42 Asbestos Assessment Required. RANDOM PANEL REMOVED DUE TO FIBER RELEASE. PANEL NEEDS TO BE REPLACED WITH SOMETHING TO PREVENT STUDENTS FROM ENTERING THIS AREA. POC: RONNIE LOWE 202 359 1929 CAROLYN ERBY 202 439 7843 DCB (IT GROUP)/703-461-6848 December 3, 2001 March 3, 2003 455 days
FM-200226258 03 3/4/03 Woodson, H.D. New door was install, door lock cylinder needs to be put on and light kit. February 26, 2003 March 4, 2003 6 days
FM-200226481 03 3/6/03 Woodson, H.D. Second floor boys bathroom Replace cracked commode, broken during repair. March 4, 2003 March 6, 2003 2 days
FM-200226758 03 3/9/03 H.D Woodson Pool Area First Floor 1. Added chemcials 2. Check heat 3. Added water 4. Back wash March 7, 2003 March 9, 2003 2 days
FM-200226556 03 3/10/03 Woodson Plaza - main office / resource room office #4 Install new lock cylinder to secure special ed. files. March 5, 2003 March 10, 2003 5 days
FM-200100149 1/7/01 3/17/03 WOODSON, H.D. THE HEATING PLANT MAKETHE NECESSARY REPAIRS TO # 1 & 2 BOILER FEED PUMPS. CONTROLS TO BOILER FEED PUMPS. BOILER FEED PUMPS LEAKING AND HAVE TO CONSTANTLY HAND FEED # 1 & 2 BOILERS. January 7, 2001 March 17, 2003 799 days
FM-200216578 02 3/18/03 (Woodson, H.D.) Fire code violation: Cafeteria: door closer broken and not latching. September 5, 2002 March 18, 2003 194 days
FM-200219411 /02 3/18/03 H.D Woodson 1. Mechanical Equipment P.M 2. Add water to pool 3. Check water level 4. Check water temp 5. Back wash sand filter October 15, 2002 March 18, 2003 154 days
FM-200112443 01 3/19/03 H.D. WOODSON MECH. ROOM FOR SWIMMING POOL 1. ASBESTOS ASSESSMENT REQUIRED TO RECEIVE WORK PERMIT. 2, FABRICATE METAL ANCHOR FOR SUMP PUMP FLOAT ASSEMBLY. ASBESTOS CODE A-CLEAR FOR REPAIR 6/8/01 June 5, 2001 March 19, 2003 652 days
FM-200124190 /01 3/20/03 WOODSON,H.D. BOILER MAINTENANCE 1) BOILER WATER TREATMENT SERVICES TRICON OF WASHINGTON INC. POC: THOMAS PICKETT - 698-1750 November 30, 2001 March 20, 2003 475 days
FM-200122421 /01 3/20/03 (WOODSON, H.D.) OUTSIDE/ PLAZA REPLACE ROPE ON FLAG POLE-HOOKS. October 26, 2001 March 20, 2003 510 days
FM-200118225 01 3/20/03 (WOODSON,H.D.) GROUNDS REPAIR SPRINKLER BOXES August 23, 2001 March 20, 2003 574 days
FM-200203899 02 3/20/03 (Woodson,H.D.) Outside Grounds/Playing Field repair large hole in the chain-link fence. March 5, 2002 March 20, 2003 380 days
FM-200204154 02 3/20/03 (Woodson, H.D.) Stadium Repair fence around football stadium, due to the fire dept. had to cut this fence to respond to a fire. March 8, 2002 March 20, 2003 377 days
FM-200107854 01 3/20/03 WOODSON, H.D. FIRST (1ST) FLOOR - STAIRWELL # 1 WINDOW BAR IS PULL BACK FROM BRICK WALL. NEED BRICKS MASON TO CEMENT IT BACK TO WALL. NEED SOME ONE TO ANCHOR THE BAR BACK TO THE WALL. April 9, 2001 March 20, 2003 710 days
FM-200218694 02 3/20/03 Woodson, H.D, Outside ground - 55th St. side Remove large tree branch / fell from bad weather or storm. October 2, 2002 March 20, 2003 169 days
FM-200213061 02 3/20/03 H.D Woodson Cutting of grass with big tractor July 26, 2002 March 20, 2003 237 days
FM-200124095 /01 3/20/03 WOODSON, HD SWIMMING POOL 1) SWEEP MOP AND CLEAN SWIMMING POOL,POOL DECK,AND BATHROOM OF DIRT AND DEBRIS. 2) CHECK EQUIPMENT IN FILTRATION ROOM, FOR PROPER OPERATION. 3) OPEN-UP AND VALVE-OVER ALL PERTINENT VALVES ASSOCIATED WITH FILLING SWIMMING POOL 4) ADD CHEMICALS TO SWIMMING POOL THROUGH AUTOMATION SYSTEM. 5) CHECK WATER BALANCE 6) BACK WASH POOL. 7) CHECK D.E. TANK. 8) CHECK SAND FILTRATION SYSTEM. November 30, 2001 March 20, 2003 475 days
FM-200221925 02 3/20/03 Woodson, H.D. Third floor - Special Ed. file room Need to have 18 locks for file cabinets. To be install and rekeyed-Need to be secured by law. This is a must to be secured. December 3, 2002 March 20, 2003 107 days
FM-200227560 03 3/24/03 H.D Woodson Pool Pump Room First Floor 1. Back wash filter tank 2. Add water to pool 3. Check on dehumidifier control 4. Add chemical March 24, 2003 March 24, 2003 0 days
FM-200122772 01 3/25/03 H.D. WOODSON HEATING PLANT SUB-BASEMENT 1. ASBESTOS ASSESSMENT REQUIRED. 2. EXTEND THE BLOW DOWN LINES OF #1 AND #2 BOILERS FROM FLOOR DRAINS TO SUMP PUMP PIT. FLOOR DRAINS CANNOT HANDLE WATER WHEN BLOWING DOWN OR DRAING DOWN FOR SUMMER CLEANING CAUSES PLANT FLOOR TO FLOOD. ASBESTOS CODE A-CLEAR FOR REPAIR BY 11/02/01 HRONE ENGINEER: EDWARD RODRIGUEZ November 1, 2001 March 25, 2003 509 days
FM-200122750 01 3/25/03 H.D. WOODSON GR. FL. MECH. RM. BY PROJECTION ROOM REPLACE THE BARINGS IN THE MOTOR FOR A.H.U. ALSO RELAYS TO THE SAME A.H.U ARE NEEDED TO SUPPLY HEAT TO THE AUDITORIUM. WP-200108920 November 1, 2001 March 25, 2003 509 days
FM-200122749 01 3/25/03 H.D. WOODSON AUDITORIUM (MECH RM.) REPAIR OR REPLACE ELECTRICAL CONTROLS FOR MOTORS TO THE CONDENSATE RETURN TANK IN THE MECH. ROOM REAR STAGE AREA. WP-200108920 November 1, 2001 March 25, 2003 509 days
FM-200120886 01 3/25/03 H.D.WOODSON 1. ASBESTOS ASSESSMENT REQUIRED 2. DEMOLATION WORK TO BLOCK WALL ABOVE THE AUDITORIUM TO REPLACE HEATING COIL AREA IS MARK (FM-200115842) ASBESTOS CODE A-CLEAR FOR REPAIR 10/12/01 BY HORNE ENGINEER EDWARD RODRIGUEZ October 3, 2001 March 25, 2003 538 days
FM-200117548 01 3/25/03 H.D. WOODSON BOILER ROOM 1. ASBESTOS ASSESSMENT REQUIRED. 2. R/R DOOR REFRACTORY ON #1 & 2 BOILERS. 3. R/R AROUND CONES OF BURNER. ASBESTOS CODE A-CLEAR FOR REPAIR BY ROY AGNANT HORNE ENG. ON 9/10/01. August 15, 2001 March 25, 2003 587 days
FM-200107139 01 3/25/03 WOODSON, H.D. HVAC RENOVATION IN POOL AREA . SEE ATTACHED SCOPE OF WORK. ASBESTOS CODE A - CLEAR FOR REPAIRS ON 04/10/01. April 2, 2001 March 25, 2003 722 days
FM-200115838 01 3/25/03 H.D.WOODSON PLAZA (1) ASBESTOS ASSESSMENT REQUIRE (2) REPAIR LEAKING CHILL WATER LINE/1 1/4 LINE IS LEAKING ON AIR HANDLE UNIT VALVE IN PLAZA. ASBESTOS CODE A-CLEAR FOR REPAIR BY HORNE ENG. TROY WILCOME 8/22/01 July 25, 2001 March 25, 2003 608 days
FM-200218531 02 3/25/03 Replace the refractory on the doors of # 1 and # 2 boilers as per A. Colvin , Boiler Inspector. (1) Asbestos assessment required on door insulation. Asbestos Code A-clear for repair by Horne Engineer Sheryll James on 10/09/02 DCPS Charles E. Buchanan September 30, 2002 March 25, 2003 176 days
FM-200225776 03 3/26/03 Woodson Room #602 and #611 Repair electrical controls to univent motors. Rooms not heating properly. February 13, 2003 March 26, 2003 41 days
FM-200217259 02 3/26/03 H.D. Woodson Basement Physical Heating Plant/ B.R Make the necessary repairs to (2) leaking fire tubes in boiler # (1) also (2) leaking fire tubes in boiler #2, leaking tubes need to be replaced before the heating season starts October 15, 2002. Also for D.C Insepction September 11, 2002 March 26, 2003 196 days
FM-200204878 02 3/26/03 H. D. Woodson Boiler room ceiling 1. Asbestos assessment required. 2. Repair 6" hot water supply line to dual circulating pumps #12 & 13. Line is approximate 10 ft. high in ceiling. Line is leaking rapidly through insulation and can not be isolated. POC: Mr. Parker Asbestos Code A - Clear For Repairs On 03/25/02. Horne Engineering - Troy Wilcome (RG 03/25/02) March 25, 2002 March 26, 2003 366 days
FM-200204167 02 3/26/03 Woodson Boiler Room Boilers #1 and # 2 down on flame failure. March 11, 2002 March 26, 2003 380 days
FM-200201797 02 3/26/03 H.D. WOODSON SR. HIGH 1ST FL. PARENT CENTER RECONNECT 1-1/4" STEAM LINE ON SUPPLY AND RETURN TO OVER HEAT UNIT. REPLACE 1-1/2" X 1-1/4" AND STRAINER (BLACK PIPE). ATTN: ASBESTOS ASSESSMENT NOT NEEDED. NO INSULATION ON THE LINES. January 25, 2002 March 26, 2003 425 days
FM-200225424 03 3/26/03 Woodson ,H.D. Boiler room Repair or replace sump pumps ,will not run in automatic Boler room Flooded February 10, 2003 March 26, 2003 44 days
FM-200206075 02 3/26/03 H.D. Woodson Filtration room motor & pump Make the necessary repairs to the motor for the circulating pump that supplies the water to the swimming pool. Name: Century, amps 10, kw 7.5, phase 3, serial # 6-360339-02. Note: The pool filtration water system will be inoperable, unit repairs are forthcoming. April 18, 2002 March 26, 2003 342 days
FM-200226731 03 3/31/03 Woodson, H.D. Seventh, fifth and fourth floors Stairway doors # 1, 4 and 3 Replace locks / knolb on doors. March 7, 2003 March 31, 2003 24 days